FVTX Power and cabling – a work-in-progress Task 1.0 – Pre-populate the Racks (Boose/Lenz/Jimmy) Low Voltage Racks2 (on order) Bias Voltage Rack1 (shared.

Slides:



Advertisements
Similar presentations
MuTr Shielding & Grounding Preliminary 10/6/99 (G. Hart) Additions 1/4/01 (REM)
Advertisements

RPC Electronics Overall system diagram Current status At detector
Mircea BogdanJuly 11, Crosstalk Test on CsI Front-End Cable Rev.B The University of Chicago.
1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
MineralScan Lite Installation Guidelines Digital Control Lab, LLC NW 6 th Street, Suite F Gainesville, FL Main Unit power 90 – 240 VAC 50/60.
Bagby L0 Workshop L0 Infrastructure  Mapping  Installations u Horseshoe Area s Adapter Card u Cathedral s Low Voltage Fuse Panel u Platform s.
04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
Sept 25, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
1 PBX installation considerations BASIC TELECOMMUNICATIONS.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
TF Joint Voltage Drop Instrumentation Robert Marsala (609) Hans Schneider (609) Engineering Operations August 7, 2003 TF_JOINT_Final_Design_Review.ppt.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
EGSE CENTRIC PLAN FOR TWO TOWER TESTS IN ACCORDANCE WITH MEETING HELD 02 MAR 2005 REVISED 22 MAR 2005.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
1 7/28/2011 PHENIX WEEKLY PLANNING 7/28/2011 Don Lynch.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
Columbia University IN THE CITY OF NEW YORK Environmental Monitoring DOE Review June 2-3, 2009.
Installation and checkout of QBPM system Hardware to be installed –Install hardware in racks –Install CPU /SIS digitizers/VMIC 3122 analog digitizers/Digital.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
1 DAQ for FVTX detector Implementation Mark Prokop Los Alamos National Laboratory.
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
FVTX Review Nov FVTX Review Homeworks. FVTX Review Nov When is Project Complete; how will it be determined?
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
Magnet Controls GroupOctober 4, Scope, Cost Estimate and Schedule To Complete The LCLS Magnet PS Controls P Bellomo and Kristi Luchini.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
FVTX Electronics (WBS 1.5.2, 1.5.3) Sergey Butsyk University of New Mexico Sergey Butsyk DOE FVTX review
Technical Support /17/08 PHENIX WEEKLY PLANNING 7/17/2008 Don Lynch.
CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
1 VELO integration INTEGRATION, december 05 OUTLOOK : - PARTS - 3D MODEL - LV & HV CABINETS INTEGRATION - LV CABLING - RPT CABLING.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Cost and Schedule.
1 7/21/2011 PHENIX WEEKLY PLANNING 7/21/2011 Don Lynch.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
FVTX Electronics (WBS 1.5.2, 1.5.3) Sergey Butsyk University of New Mexico Sergey Butsyk DOE FVTX review
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
12/17/01 Ron Sidwell 1 Run2b Datapath 17 Dec Update Bill Reay, Ron Sidwell, Noel Stanton, Russell Taylor, Kansas State University.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
Nov 1, 2007 IEEE NSS & MIC 2007 by C. Y. Chi 1 A Faster Digitizer System for the Hadron Blind Detector in the PHENIX Experiment Cheng-Yi Chi Nevis Lab.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Columbia University IN THE CITY OF NEW YORK FVTX Electronics Oversight and Integration Eric J. Mannel Columbia University.
Robert Pak VTX Meeting June 3, Robert Pak 1 VTX Meeting June 3, 2005 General Progress Started general integration meetings for detector upgrades.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
8/11/20111 PHENIX WEEKLY PLANNING 8/11/2011 Don Lynch.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
Columbia University IN THE CITY OF NEW YORK VTX Electronics Integration E.J. Mannel Columbia University DOE Review June 2-3, 2009.
Relay Controller Device. 2 Relay Controller Device (RCD) If additional relays are needed beyond the two that are available on the DCD, then a RCD can.
CERN Giovanna Lehmann, Xavier Pons
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
Site Controller Unit and Trunk Interface Unit
ECAL Front-end development
PMT cabling Gian Luca Raselli INFN Pavia
LV Test Napoli feb 05 Noise ripple: EASY - + CRATE LV cable
Pierluigi Paolucci - I.N.F.N. Naples
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
RPC Front End Electronics
PLC Hardware Components.
RPC Front End Electronics
RPC Electronics Overall system diagram Current status At detector
Digitally subtracted pulse between
TOF & BB FEE Safety Review
Presentation transcript:

FVTX Power and cabling – a work-in-progress Task 1.0 – Pre-populate the Racks (Boose/Lenz/Jimmy) Low Voltage Racks2 (on order) Bias Voltage Rack1 (shared with VTX) 1.1 Install the PHENIX power bucket Install and wire the bulk power supplies (all components at BNL) 1.3 Install the PHENIX LV distribution crates2 Distribution crates/25 distribution modules ROC Power 8 PHENIX modules Pulser2 PHENIX modules Opto-isolator2 PHENIX modules Clocks1 PHENIX module Wedge Power12 PHENIX modules Mega-Pacs4 mainframes 1.4 Install the FVTX LV Distribution Crates (being tested at LANL)2 VME crates/20 distribution boards/2 controllers 1.5 PHENIX distr to FVTX LV distr 200 wires/ 5-pair per FVTX LV distr 1.6 Install the LV wedge fanout boards10 boards/80 20-pin Molex input connectors, pin Molex output connectors 1.7 FVTX distr to LV wedge fanout boards 80 (22AWGx20)/ 8 per fanout board 1.8 ROC terminal block fanout strips Install the FVTX Bias Voltage Distribution crates1 VME crate/10 distribution boards/1 controller MPOD crate

Task 2.0 Make-up, test, and install cables, Bridge-racks to FVTX (~35 ft) 2.1 wedge LV cables 96 (22AWGx16)/4 per ROC 2.2 ROC LV cables24 (??AWGx24)/ 1 per ROC 2.3 wedge bias cables384 (16-pair, AWG22, shielded, transition to MMCX plug)/ 16 per ROC 2.4 clock power cables4 Task 3.0 Assemble, pull fibers FEM/FEM interface to FVTX 3.1 Data Fibers 1152 fibers-16 cables (72/cable – 6 connectors/ 1.5 per ROC) 3.2 Slow Control Fibers48 fibers-24 cables (2/cable – 1 per ROC)* 3.3 Clock Fibers8 fibers – 4 cables (2/cable – 2/distribution board)* * SC and Clk will share the same trunk

Proposed Resources Parts ordering – Steve Boose, with help from Eric Mannel Fanout board assembly- Sal Polizzo Rack assembly- Frank Toldo Cable connector termination- Frank Toldo, Sal Polizzo, and external vendor with oversight by Steve Boose and Eric Mannel Terminal block termination- Frank Toldo, with oversight by Paul Giannotti with help from Eric Mannel