Supervisor: Jonathan Emery Labview control BWS Calibration Bench.

Slides:



Advertisements
Similar presentations
DAQmx下多點(Multi-channels)訊號量測
Advertisements

1 In this lecture, you will learn the following. 1. Basics of real-time control engineering 2. Effects of fixed and unfixed (also probably unknown) sampling.
The PHENIX/EMCal(PbSc)/BB/TOF Laser User Instructions Sean Stoll (rev. 12/8/03)
Pattern Generator Versatile Measuring Equipment Bit to bit customized signals, PRBS, PWM, specifics,... Digital Pulse Delay Generator 16 outputs TTL,
PS wirescanner calibration Student Meeting 10/03/2014 Carolina Bianchini BE-BI-BL.
MEG Experiments Stimulation and Recording Setup Educational Seminar Institute for Biomagnetism and Biosignalanalysis February 8th, 2005.
Kirsten Hacker Triggering and Measurement Devices for LCLS 10/14/04 1 Triggering and Measurement Devices for the LCLS Undulator.
1 DIFFERENTIAL POLARIZATION DELAY LINE Controller FINAL REPORT D0215 Supervisor : Mony Orbach Performed by: Maria Terushkin Guy Ovadia Technion – Israel.
1 Project supervised by: Dr Michael Gandelsman Project performed by: Roman Paleria, Avi Yona 12/5/2003 Multi-channel Data Acquisition System Mid-Term Presentation.
Controlled Scanning of Microtiter Plates through the Use of LabVIEW® Erica Chin Anton Edmund Samir Laoui May 14, 2008.
Frank L. H. WolfsDepartment of Physics and Astronomy, University of Rochester Using Digital Signal Processing in the Advanced Laboratory F. Wolfs, M. Alexander,
1 Project supervised by: Dr Michael Gandelsman Project performed by: Roman Paleria, Avi Yona 26/4/2004 Multi-channel Data Acquisition System Final_A Presentation.
Data Acquisition for Biofeedback System Using LabVIEW Midterm Presentation Performed by Rapoport Alexandra Supervised by Eugene Rivkin Technion Department.
Summary of the past and future work with the HEIG-VD on the wire-scanner design BI seminar 26 September 2014 J.Emery for the BWS team.
Laser Tracking System (LTS) Son Nguyen Jassim Alshamali Aja ArmstrongMatt Aamold.
Pocket Multi-channel Signal Analyzer IIntroduction Key Features Applications Key Specifications Hardware Connections.
“Introduction of the software for the thermal tests” Ioannis Kossyvakis (University of Patras, Greece) Mateusz Sosin (CERN) 19/09/2011.
Matteo MacchiniStudent meeting – September 2014 Motion control design for the new BWS Matteo Macchini Technical student BE-BI-BL Supervisor: Jonathan Emery.
Development of a SiPM readout circuit and a trigger system for microfluidic scintillation detectors MIKHAIL ASIATICI 08/05/2014.
Magnetic Lab Hall Probe Measurement System 8/26/2003 Key System Requirements Motion Control: SmartMotor via RS axis: x(0-400mm), y(0-400mm), z(0-6000mm),
E-LABORATORY PRACTICAL TEACHING FOR APPLIED ENGINEERING SCIENCES W O R K S H O P University of Oradea, Romania February 6, 2012 G E N E R A L P R E S E.
Data Acquisition Software Integration and ADC Characterisation Jack Hobbs 4 th August
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
TLA5000B Series Logic Analyzer Fact Sheet Breakthrough solutions for real-time digital systems analysis Featuring:  125 ps-resolution MagniVu™ acquisition.
1 of 22 Glaciers and Ice Sheets Interferometric Radar (GISIR) Center for Remote Sensing of Ice Sheets, University of Kansas, Lawrence, KS
Matteo MacchiniStudent meeting – June 2014 Motion control design for the new BWS Matteo Macchini Technical student BE-BI-BL Supervisor: Jonathan Emery.
The Actuator and Control unit CERN wire-scanner development review J.Emery for the BWS team.
Preliminary measurements for the 8 channel prototype of SPD discriminator ASIC I.The 8 channel prototype. II.Status of the test. III.Noise. IV.Gain. V.Test.
1 Programming of FPGA in LiCAS ADC for Continuous Data Readout Week 3 Report Jack Hickish.
High Speed Digital Systems Lab Asic Test Platform Supervisor: Michael Yampolsky Assaf Mantzur Gal Rotbard Project Midterm Presentation One-Semester Project.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
Microscope Control Configuration This section of the QED manual will describe how to configure you Configure and Control your automated microscope. Mac.
BWS electronics design status J.Emery & Luca, Pierre-Jean, Emiliano, Jose, Alexander and all past contributors!
FeaturesBenefits MagniVu™ acquisitionAvoid missing events completely in either timing or state acquisition mode with higher sampling resolution (up to.
USB Project Ian Coulter. USB Interface USB Menu -Download HEX File -Send Trigger -Start DAQ.
Connecting EPICS with Easily Reconfigurable I/O Hardware EPICS Collaboration Meeting Fall 2011.
Commissioning and preliminary results
Industrial Controls Engineering Department First CERN PXI Users Group meeting 19 th October 2011 – Hubert REYMOND – EN/ICE 1.
BWS PS and SPS problem report J. Emery
FED 9U Analog Characterization Stefanos Dris CERN & Imperial College.
BLDC Motor Speed Control with RPM Display. Introduction BLDC Motor Speed Control with RPM Display  The main objective of this.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
KM2A PMT testing platform FENG Cunfeng, LI Chaoju, SUN Yansheng Shandong University THE 2 nd WORKSHOP OF AIR SHOWER DETECTION AT HIGH ALTITUDES IHEP, Beijing,
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
Moving Wire, Pulsed Wire and Long Coil Measurements on the SSRL Beam Line 5 EPU Scott Anderson SLAC Magnetic Measurements.
NEW UPGRADE TO THE APS MAGNETIC FIELD INTEGRAL MEASUREMENT SYSTEM
DAQ read out system Status Report
Intro to USB-6009 DAQ.
Beam Wire Scanner (BWS) serial link requirements and architecture
A 12-bit low-power ADC for SKIROC
Tracker readout, DAQ, C&M and calibration
Carlos Daniel Morais Pereira
Power and control electronics for the new fast wire scanners
Brief Status SPS Prototype PSB Prototype Installed in LS1
LIU Wire Scanner Milestones June 2017
New Wire Scanner Calibration Bench Software
DesignDRIVE Position Manager SIN/COS
BI seminar agenda “Project context and Introduction to the collaboration with the HES-SO”, 10 min, Jonathan Emery, CERN “A Generic and Modular Protocol.
Working plan for 2017 Acquisition and Control Electronics
3.14 Microscan QX-870 Scanner Configuration
PS wire scanner failures
USB Project (6th August)
LHC wire scanners status
Instrumentation for Colliding Beam Physics 2017
Data Acquisition Software Integration and ADC Characterisation
SuperKEKb X-Ray Monitor
FPGA Based Single Phase Motor Control Using Multistep Sine PWM Author Name1, Author Name2., Author Name3, (BE-Stream Name) Under the Guidance Of Guide.
LIU BWS Firmware status
Presentation transcript:

Supervisor: Jonathan Emery Labview control BWS Calibration Bench

BWS Calibration Bench Design Laser calibration bench similar that PSB and PS

Picoscope Interface encodeur optique Mesure des vibrations Digital lines interface Switch mode power supply and filters Use FPGA Starter kit & code of Kevin’s Bachelor DSPACE- FPGA Interface missing Commercial Step motors control Hardware start trigger Interface photodiode Labview Start trigger BWS Calibration Bench Design

 dSpace system  PWM Power Supply  Motor BWS Calibration Bench Design

Calibration Start Linear stages positionning Start acquisition Trigger scanner mouvement movement completed ? No Yes Data download from picoscops Data integrity checks Data processing and data reduction System initialisation Data recording to file All position performed No Yes Report generation End of program Next position

BWS Calibration Bench Design Laboratory test bench  LTS150  Pico 5444B

BWS Calibration Bench Design  Move to Home position  Move to Absolute position  Jog  Read from Picoscope  Create waveform / pulse on the Picoscope  Change Picoscope settings  Change Thorlabs settings  Read/Write Initialization settings  Make cycle: Jog – Pulse – Acquire signal – Jog (…) Done: Linear stages positionning Start acquisition Trigger scanner mouvement Data download from picoscops System initialisation Data recording to file All position performed

BWS Calibration Bench Design

Scans: Jog – Pulse – Acquire Signal - Jog dSpace ↓ WS movement

BWS Calibration Bench Design  Integrate the dSpace system to trigger scanner movement  Decide the correct parameters for the Thorlabs and Picoscope. According with the new BWS bench  Perform data processing and data reduction  Perform data integrity check  Create a nice GUI  Integrate all channels from picoscope  Record picoscope channels into file To do: