Connectors 13/03/2013Collaboration meeting CERN - CSEM1.

Slides:



Advertisements
Similar presentations
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Advertisements

CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
Rosier Ph. – IPNO – Detector Dpt. – 27/05/2011APRIME HPS collaboration meeting 1/24 1- Vacuum chamber proposal 1.1- Stainless steel chamber design and.
External nut type series 43
SFB CSEM 4’’. PROCESS FLOW #1 avant recuit #1 apres recuit.
22/01/2014I° microEO meeting1 MICRO-COOLING CONNECTORS.
Bulk MEMS 2013, Part 2
GTK Cooling Summary of frame and cooling plate Shear tests Alessandro Mapelli Michel Morel Jerome Noel Georg Nüßle Paolo Petagna Giulia Romagnoli GigaTracKer.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /21 GTK COOLING: STATUS OF THE MICRO-CHANNEL OPTION Paolo.
GTK WG Meeting April 5 th 2011 Update on Microchannel Cooling - Paolo Petagna 1/15 PH-DT Update on Microchannel Cooling J. Daguin (CERN PH/DT) A. Mapelli.
Pressure Tests Results 13/03/2013Collaboration meeting CERN - CSEM1.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Hybrid Integrated Circuit
Micro-channel CO 2 cooling for the LHCb VELO upgrade. R. Dumps, J. Buytaert, A. Mapelli, P. Petagna, B. Verlaat CERN A. Nomerotski Oxford University September.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report October 11, 2001 N. Hartman, E. Anderssen,
NA62-GTK special meeting on cooling options
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Low Mass Rui de Oliveira (CERN) July
BioMEMS Device Integration, Packaging and Control for BioMEMS
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Metal Soldering Connectors Kovar connectors 6mm diameter with a small pin to enter in the hole Developed for NA62 project 3µm.
Tube-to-Chip soldering Georg Nüßle. µcool weeklyNovember 8, Paper Following the recipe from: “Solder-based chip-to-tube and chip-to-chip packaging.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
Vrije Universiteit amsterdam Milan, September 25, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
– EUDET module – Report from Mechanics Brainstorming Marc Anduze – 30/06/2009 Laboratoire Leprince Ringuet Ecole polytechnique - Palaiseau.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
IBL Mock up Mounting procedure V.2 François-Xavier Nuiry Simon Feigl
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
Microchannel cooling Alessandro Mapelli CERN PH-DT EPFL-LMIS4 Reporting on behalf of D. Bouit, J. Daguin, L. Kottelat, J. Noel, P. Petagna – CERN PH-DT.
Report on testing Snake2 u-channel. P. Jalocha & J. Buytaert. 8 June 2015.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
Status report Pillar-1: Technology. The “Helmholtz-Cube” Vertically Integrated Detector Technology Replace standard sensor with: 3D and edgeless sensors,
Microchannel Cooling D. Bouit, J. Daguin, A. Jilg, L. Kottelat, A. Mapelli, J. Noel, P. Petagna, G. Romagnoli – CERN PH-DT K. Howell – Georges Mason University.
CDR2 – Coupler Mechanical Design NICOLAS MISIARA.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
MICRO-STRIP METAL DETECTOR FOR BEAM DIAGNOSTICS PRINCIPLE OF OPERATION Passing through metal strips a beam of charged particles or synchrotron radiation.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
Pierre Delebecque Cooling – upgrade 2012 May 31 st 1 Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
GRPC development in Lyon
Microchannel cooling - Update
Forum on Tracking Detector Mechanics
Alessandro Mapelli - µcool weekly - CERN
Hybrid Issues.
Micro-channel Cooling
Hybrid Pixel R&D and Interconnect Technologies
ob-fpc: Flexible printed circuits for the alice tracker
Update on WG4 A.Tauro - R.Santoro 11/10/11 ITS upgrade meeting.
ALICE PD group meeting Andrea Francescon.
Tracker Outer Barrel COOLING Antti Onnela, CERN.
Dump Core Studied Design Solutions
Microfluidic devices for thermal management
3D-Printed Connectors Timothée Frei
Integration issues at IHEP
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
WG4 – Progress report R. Santoro and A. Tauro.
Date of download: 3/4/2018 Copyright © ASME. All rights reserved.
AIDA 2020 Tel Aviv group.
Presentation transcript:

Connectors 13/03/2013Collaboration meeting CERN - CSEM1

Mechanical Connector 13/03/2013Collaboration meeting CERN - CSEM2 Design of Raphael Dumps In-plane connector to test fluidic samples: -two metallic plates screwed together -two plastic o-ring to avoid leaks in the connection between the wafer holes and tubes -Substain high pressure (tested up to 300 bar) -Easy to assemble -Tested in thermal cycles

Metal Soldering Connectors 13/03/2013Collaboration meeting CERN - CSEM3 ‘Solder-based chip-to-tube and chip-to-chip packaging for microfluidic devices’ Edward R. Murphy et al., The Royal Society of Chemistry, /16’’ tube Stainless steel ferrule Brass ferrule Swagelok standard objects: - assemble - swaging for sealing - soldering with tin to the metal deposited on the wafer surface 20 nm Ti nm Au

Metal Connectors-Testing 13/03/2013Collaboration meeting CERN - CSEM4 - Testing inside vacuum vessel and thermal cycling (Frame3 NA62 with C 6 F 14 fluid) 20 nm Ti nm Au On the non-polished side!! - Testing with CO 2 up to 70 bar and -10 °C. - Pressure test to check leaks  no problems up to 300 bar! 100 µm thin Si chip  no solder in the tube!!

Metal Connectors-Future Developments 13/03/2013Collaboration meeting CERN - CSEM5 -Studying the quantity of metal and the type of metal to deposit (some problems of bad soldering were observed in some samples with no RF etch cleaning before deposition) -Depositing metal just on a small surface to sold connectors masking the surface during deposition -Future plan of integrating with the full Si connector in plane full silicon connectors: -Up pool with channel for the fluid -Bottom pool integrated with micro-channels FLUID IN

Connecting Two Fluidic Devices 13/03/2013Collaboration meeting CERN - CSEM6 Inlet Outlet recirculation Future interconnection between µ-channel devices with in- plane connectors  proposal to cool down the stave detector of ALICE ITS - Bridges between micro-channels - Tubes inside micro-channels 0.31 mm tube inserted from the side in between the channels, leak tightness assured by gluing

Future Tests 13/03/2013Collaboration meeting CERN - CSEM7 -Studying the metal type and thickness for deposition -Trying to sold Si-Si with a metal layer -Interconnecting devices  tests on-going -…