Project #2 : “The Ceiling of 2017”: An indoor hotel swimming pool ceiling By: David Rahoi, Kasha Kultys, Jericha Cain, Jason Mikus Spring 2007.

Slides:



Advertisements
Similar presentations
TORONTO PUBLIC LIBRARY THORNCLIFFE BRANCH. PHOTOGRAPHS Interior view of library from entrance area……………………………………………………………………………………………… 3 Interior view.
Advertisements

Acoustics 5 Materials Rino D.A. Fernandez, uap Class Instructor.
Building Envelope. Energy Conservation House design and orientation Lifestyle changes Energy efficiency.
Jason Hegedus Greg Mikus Josh Miller Evan Schwartz 12/10/2008.
Retrofitting Bioclimatic building-insulation Amit Erel, Hyoyoung Kim, Mateo Sbresso.
Building Information Located in Washington DC on the George Washington University Campus Addition to existing Business School 170,000 Sq Ft 6 floors above.
Hope VI Residents Deserve Green Housing Affordable, Healthy Home Design Choices.
ASSIGNMENT 1 Model Answers. Question 1 Q1) Consider building a garden shed project, which involves designing the shed, figuring out what materials are.
Chapter 9 FACILITY MANAGEMENT.
Energy Environment & Sustainable Development Thematic Network on Energy in the Built Environment Thematic group 5 : Building Components (including windows.
Elevations.
BAE SYSTEMS DESIGN PROJECT: DAYLIGHTING TECHNIQUES/ AFTERNOON DE-”LIGHT” EDSGN 100 Sec. 6 Team 3: David Young, Robert Vadella, Victoria Rodriguez, Phil.
Manufactured Housing Meeting Today’s Housing Challenges.
Custom Home Design Project
ACOUSTICAL FOAM PANELS ANTHONY andTORREFIEL. Acoustic foam is an open celled foam used for acoustic treatment. It attenuates airborne sound waves by increasing.
FRP Door and Frame System. FRP Door and Frame System What is FRP? Tie rod assembly Aluminum closer reinforcement (same for panic/lock reinforcement) Aluminum.
Passive and Active Solar Models 8 th Grade Enrichment Fall, 2012.
Hair Straightener Redesign
Quality Function Deployment
Problem Solving Design Process.
Schematic Design Proposal Dan Rusnack 11/14/03 Lighting/Electrical option Thesis project The Hall Corporate Headquarters.
Green 200: The Science of Green Building. Course Goals Green principles in design and construction Innovative materials, systems, and construction methods.
Conservation and Environmental Design and Construction
ALCOA: EAST HALLS RENOVATION EDSGN 100 Section /9/13
Windows and Doors. Typically once the roofing material has been installed/completed the windows and doors are installed. It’s important to install these.
ENERGY PRODUCTION VIRTUAL STEM HOUSE EDSGN 100 October 16, 2013 Section 008 Team 7 Victor Hagerstrom Kim Harmon Kenny Stevens Sashank Vanga.
IP CORSICA 2014 Final presentation Group 7. GROUP NR. 7! Krisztina – Denmark Jim – United Kingdom Audra – Lithuania Nicolas – Italy Sander – Estonia.
Licón, Daniel Mangelli, Paola. Table of Content Materials that walls are made of Load-Bearing Wall Nonbearing Wall Some Wall uses Conclusion.
1 Prepared by Mohammed Almhuemli Nicholas Ferlita Irving Ho Nirav Shah.
Universal Plug Holder Jonathan Rajkowski Benjamin Dean Jonathan Fitzwater.
 The Task  The Approach  The Evaluation  The Analysis  The Model  Conclusions  Project Management.
Design Brief Introduction to Engineering Design. Why do you need a DB?  A Design Brief is essentially the specification by which one designs…  It creates.
Architectural acoustics Acoustical materials. Sound absorber: Reapor Expanded Glass Granulate  Description  The sound absorber for challenging environments.
ARMSTRONG “THE CEILING OF TOMORROW” Team 7 “The Dream Team”: Bryan Shearer David Smith Jeegar Shah Jeff Irwin.
Zero Energy Home’s Features and Appliances Interior and Exterior Features: Roofing Insulation Windows Energy Saving Appliances.
Building was designed for optimized material use The materials were chosen for their durability and low maintenance requirements.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
Energy Efficiency and VAT !. 5% or 17.5% VAT ?  What can be charged at 5%  When can it be charged  Why does it matter?
Competency: Draw exterior elevations
Chapter 2 continued Quality Function Deployment. What is Quality Function Deployment (QFD)? QFD is a tool that translates customer requirements into the.
February 20, 2013 David Alvarado Ethan Kruder Kirk Santure Jessica Spoll.
Interior Of DMRC Rolling Stock by S.S.Joshi ED/Rolling Stock
Revival of the Disposable Camera EDSGN 100 Section 203 Colin Mottola, Jake McGeehan, Jimmy Gallagher, Peter Eshewsky July 23, 2014.
Here at Lake Travis Green Builders we believe innovative ideas and technology that resides in Green Building. We believe developing energy efficient,
Megan Gearhart, John Colwell, Greg Marchuska, Jordan Kerner. The objective of the design project was to somehow change the East Residence Halls of Penn.
DESIGN AND PROBLEM SOLVING. DESIGN A plan for making something; used to create technology.
Historic Windows. Windows are always a character defining feature of an older building. Picture or Graphic Maybe?
SOLAR INSULATION PRINCIPLES BY: PETER FRANCIS SARABOSING.
土木工程概论 Introduction to Civil Engineering 第四章 建筑工程 Chapter 4 Building Engineering.
WINDOWS & DOORS J. Carlson GHS Entry Doors: Basics  Makes a strong statement about the home. It is one of the first features a visitor sees. 
Efficiently Sustainable Products
GREEN INSTRUCT Green Integrated Structural Elements for Retrofitting and New Construction of Buildings Theme: H2020-EEB Type of Action: RIA.
Quality Function Deployment
The Walker AKA FreddY Flintstone
The Four-legged Water Walker
WALL Barrios Laura Bigott Dairet
Hair Straightener Redesign
A New Approach to Emerging Technology
Company Overview. Company Overview North-Air - History Locallhy Owned and operated. Manufacturing windows since 2000 Located in Sydney, NS Manufactured.
Ariana Kevelier Paul King Building Technology III
Mood Sheet Project Title: ??????? Task:
Competency: Draw exterior elevations
Arch205 building construction Windows- glazed curtain wall, skylights
Marketing and Computer-Aided Design Drafting
Assignment #3 Group 3.
Thermal Impact of Different Interior Finishing Materials on Energy Consumption YOGESH JATAV
The Engineering Process Engineers United Team #6
Keystone Library Deliverables
Benefits of Energy Efficient Mep Design. About Company Silicon Valley is an CMMI Level 3 Accredited IT Consulting Company and NASSCOM Certified members.
Presentation transcript:

Project #2 : “The Ceiling of 2017”: An indoor hotel swimming pool ceiling By: David Rahoi, Kasha Kultys, Jericha Cain, Jason Mikus Spring 2007

Table of Contents  Project Objective  Design Task  Design Approach  Working Drawings  Prototype  Cost Analysis

Project Objective  Design the “ceiling system” that will be over your heads about 10 years from now. Think about how to make that space over your heads more valuable, more useful, more functional to the target market. What “problems” could this overhead plane solve?

Design Task  Mission Statement The objective of “The Ceiling of 2017” Final Design Project is to design and build an attractive, yet efficient prototype of a ceiling for an indoor hotel swimming pool.

Design Approach  Gantt Chart Design Project #2: Armstrong Ceiling Project 3/26/ /2/ /9/ /16/ /23/ /30/200 7 Gathering Information Customer Needs Assessment Brainstorming Design Matrix Construct Working Drawings Prototype Design Analysis Finalize Design Documentation Presentation

Design Approach  Customer Needs Assessment The Armstrong Corporation is looking for an innovative ceiling to be put to use in the year The design’s purpose is to be more functional or valuable to the current market in some way other than the current ceilings over our heads. The customer would like a ceiling that is appealing and profitable to be sold to its clients.

Working Drawings Figure 1. Ceiling

Figure 2. Small Pyramid Figure 3. Small Pyramid Window

Figure 4. Large Middle Pyramid Figure 5. Large Middle Pyramid Window

Prototype Figure 6. Prototype

Prototype Figure 7. Exterior View, One Side of Pyramid

Prototype Figure 8. Interior View, One Side of Pyramid

Design Features  Pyramidal Structure  Acoustical Foam Absorbers  Solar Energy Powered Lighting  Natural Lighting  Humiguard Max Ceiling Panel 30 Year Warranty 30 Year Warranty Humiguard Features (Fire resistance, Humidity resistance, etc.) Humiguard Features (Fire resistance, Humidity resistance, etc.)

Cost Analysis Material Cost per unit (dollars) Amount Needed Total Cost Humiguard Max Ceiling Panel Installed 30 year warranty ft Urethane-coated Acoustical Foam Absorber- Barriers 1” Thick, 12” x 54” ft Glass Sheets ft ft ft Polycarbonate Wall and Roof Panels 8’ x 4’ ft Solar Panels 21” x 11.5” Charging Regulator panels

Conclusion  This durable and maintainable ceiling structure, to be used for an indoor hotel swimming pool, is efficient, aesthetically appealing, and properly assesses all design specifications.

Thank You! Questions???