2014 CONSTRUCTION ESTIMATES 2014. Estimates 2 2014 Estimates 3 Point of the illustration? Document your assumptions.

Slides:



Advertisements
Similar presentations
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Advertisements

ODOT Structure Project Manager Training
Session 12 STEPS 3 AND 4. Stage 2 Detail Design Submission should include an updated cost estimate and the following: (Not every item listed will apply.
Constructability Review
RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E.
MAJORS COST ESTIMATING TOOL WORKSHOP January 19, 2012 Cost Estimating Tool Overview.
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE ARKANSAS STATE HIGHWAY & TRANSPORTATION DEPARTMENT FEBRUARY 26,
Earthwork Operations & Equipments
1 Canyonero Parkway Cost Estimate Review Close out presentation October 5, 2007.
Cost Estimation System Tool
Melissa Hollis Basis of Estimates Coordinator Engineering Systems Support Section State Specifications and Estimates Office October
Chapter 34 Bridge Construction.
E20 TALLINN - NARVA RECONSTRUCTION MAARDU - VALGEJÕE.
Things to look for and remember while preparing FD05 Estimates.
Bridge 2153 Final Report Premier Engineering Rose-Hulman Institute of Technology.
Lunch. Bryan District Average Construction Cost Grade Separation –$ 10 Million 2 Lane to 4 Lane –$ 2.3 Million/ Mile 2 Lane to Super 2 (passing zones)
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
Crane Bridge Design STJ Engineering Matt Albert AJ Chandler Noah Fehrenbacher Jake Gennicks Jake Wilhoit Rose-Hulman Institute of Technology.
Schematic Design of an Accelerated Bridge Construction Project Michael P. Culmo, P.E. Vice President of Transportation and Structures CME Associates, Inc.,
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
LS Engineering Associates Corporation LS Engineering Associates Corporation CORPORATE PORFILE Engineering Services ■ Bridge Inspection ■ Bridge Design.
Programming/BudgetEngineering.. Current WisDOT Policy and Guidelines : mega/mg-budget-est-mgmt.pdf
Module IV Incorporation of Construction Site BMPs into the Design Process ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
MaSSENA LATERAL BRIDGE SLIDE CASE STUDY
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
MnDOT Sample Plan - Jerry Kotzenmacher MnDOT
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
Roadway Preservation Intranet Page. Location: Intranet/Roadway-Preservation.aspx.
Mike Baumann Statewide Utility Engineer January 22, 2015.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT
2009 ACEC/ODOT CONFERENCE ODOT’S 1R PROGRAM Liz Hunt, P.E. ODOT Pavement Services Engineer.
Things to look for and remember while preparing FD05 Estimates.
Estimating PS&E – Plans, specifications and estimate 1.
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Posting and Utilities Technical Standards Branch Class.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
Bristol BF 021-1(33) Regional Concerns Meeting VT Route 116 – Bridge #12 over Baldwin Creek April 27, 2015.
Plan Scales (see DOT 1B-3) 22”x34” paper for final designs (preliminary usually ½ size, 11”x17”) 1. Plan view: a) Rural a) 1:1000 plan scale (or 1”=100’)
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
Needs What is it? Needs What is it?. Minnesota Statute Apportionment of money to counties. Subd. 2. Money needs defined. For the purpose of this.
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
4/26/061 presents Project Crimson April 26, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
Lunch. Estimates Ballpark Accountant Typical Stages Conceptual (Alternatives) Schematic 30% Plans 60% Plans % Plans.
Bridge Deck Overlay Projects 101 Presentation by Central Office Bridge Rehabilitation Group.
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
2nd Street Drainage and Paving Improvements
Transportation Engineering Business Development Workshop Department M

I-15 North Phase 4 Scoping & Project Management Assistance
Interstate 15 North Phase 4 Cost Estimates 09/03/2015
Work Zone Safety Review – District 1 - Duluth
Traffic Control Plan Development Course
IA 122 RECONSTRUCTION PRE-BID MEETING
US26: Cornelius Pass Rd -185th Ave
PS&E – Plans, specifications and estimate
I-295/Malcolm X Avenue Interchange Improvement Project
Construction Considerations
Louis E. Feagans, P.E. Statewide Technical Services Director, INDOT
Stream Crossing Replacement Policy
Life Cycle Costing.
Presentation transcript:

2014 CONSTRUCTION ESTIMATES 2014

Estimates 2

2014 Estimates 3 Point of the illustration? Document your assumptions.

2014 Estimate Types  Programming – The project is in the concept phase. No schematic and little details are known.  Schematic – Known Geometrics (alignments V & H, super-elevations, typical sections), field survey, environmental constraints, traffic loading, bridge span length, retaining wall, etc. – Unknowns Final pavement design, phases of construction, detours, utility conflicts, final quantities  Final Plans – All quantities are known, the unknown unknown is the only unknown – Required to be within 3% of the lowest bid (or write a justification)  Contractors Estimate – Estimate based on the individual (contractor’s unique position) 4

2014 Bryan District Average Cost  Grade Separation  2 Lane to 4 Lane  2 Lane to Super 2 (passing zones)  Signal  Ramps  Freeway – Controlled Access 5  $ 10 Million  $ 2.3 Million/ Mile  $ 1 Million/ Mile  $ 150,000  $ 450,000/ EA  $ 12 Million/ Mile

2014 Programming  Basic estimate (Programming to preliminary Schematic) – Structures (bridges, culverts, storm drains) – Pavement $/ mi (spread sheet) – Signals ~ $ 150k/ EA – Miscellaneous (erosion control, striping, signs, traffic control, etc.) 10 – 20 % of known (subtotal 1) – Engineering Contingencies 6 – 11 % subtotal 2 – Mobilization 10 % subtotal 3 6

2014 Structures  Structures (400) – Culverts (Item 462) – Reinforced Concrete Pipe (Item 464) – Inlets/ Manholes (Item 465) – Headwalls/ Wingwall (Item 466) – Safety End Treatment (Item 467) – Retaining Walls (Item 423)  Average bid for items – Go to search “low bid” – Or services/bidding/average-low-bid-unit-prices.htmlhttp:// services/bidding/average-low-bid-unit-prices.html 7

2014 Structures  Superstructure (beam type) – design.html design.html  Unit cost found here –  General programming estimate (for most structures, if specialized design use the links above for more information) – Bridge Cost = $ 75/ sf deck – includes all structure cost substructure and superstructure – Culvert Cost = low bid cost x length x 1.4 – 1.4 factor adjust for head wall, wing wall, special trenching, junctions etc. – Embankment = $ 10/ cy – Excavation = $ 3/ cy – Wall = $ 50/ sf 8

2014 All items  100 – Earth Work and Landscape  200 – Subgrade Treatments and Base  300 – Surface Courses and Pavement  400- Structures  500- Miscellaneous Construction  600 – Lighting, Signing, Markings, and Signals  700 – Maintenance Spec Book 9

2014 Pavement cost / mi  See estimate spreadsheet (2014_est.xls) 10

2014 Further considerations  Considerations when Estimating Bridge Projects 1.Is stage construction necessary? 2.Is the replacement bridge on new alignment or the same? 3.Will the replacement bridge have longer spans with deeper beams? If so, will the grade have to be raised for clearance (hydraulics or V.C.)? 4.Will the contractor need special equipment for the project? 5.Is a shoofly structure required for a railroad underpass? 6.Will a pump station be required? 7.Is there a shortage of materials (steel)? 8.Is a relief structure also necessary? 11

2014 Local Projects 12

2014 Local Projects 13 Construction = $ 5.9Million

2014 Local Projects 14

2014 Local Projects 15 Construction = $ 23.5 M

2014 Local Projects 16

2014 Local Projects 17 Construction = $ ?? M

2014 Local Projects 18