INTRODUCTION TO ECC PT1 February 2015. Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first.

Slides:



Advertisements
Similar presentations
Seminar on Aeronautical Spectrum Management Regional Preparation for WRC-07 Nairobi 17 – 19 February 2004.
Advertisements

INTRODUCTION TO ECC PT1 July Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC.
European preparations for WRC Stella Lyubchenko CEPT Workshop on European Spectrum Management and Numbering 4 th June 2014.
Introduction to ECC PT1 November An introduction to ECC PT1 2 Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings)
WRC-12 Preparation CPG Chairman /
10 th International Electronic Communications Regulators Conference 8 th May 2015 Future of mobile: 4G and Beyond Eric Fournier Chairman, Electronic Communications.
AGENDA ITEM 1.1 To consider additional spectrum allocations to the mobile service on a primary basis and identification of additional frequency bands for.
INTRODUCTION TO ECC PT1 June Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC.
CEPT/ECC FM49 ”Radio spectrum for BB PPDR”: progress of work (March – October 2012) Alexander Gulyaev (ECO) on behalf of Peter Buttenschoen (Germany, Chairman.
LSA in the 2.3 – 2.4 GHz band Bruno ESPINOSA, ECO Trial LSA workshop, Helsinki, 3rd September.
WMO Workshop on Radio Frequencies for Meteorology Meteorological Satellite Services David F. McGinnis U.S. Dept. of Commerce, NOAA 7 October 2002 Geneva,
PRESENTATION ON THE WORK OF WORKING GROUP 11 ON SPECTRUM MANAGEMENT EACO Seminar for Chairpersons of National Regulatory Authorities 28 May 2015 Kigali.
1 CJK9, Zhangjiajie, China (CJK B3G #20) Summary of AWF-6 (31 st March – 3 rd April, Danang, Vietnam Zhangjiajia, China 8-10 April 2009 Juyeon Song
WRC-2003 Mike Goddard Spectrum Policy and International Director Radiocommunications Agency.
Sg-whitespace SubmissionRashid A. Saeed, Telekom MalaysiaSlide 1 February 2009 Slide 1 Work in the ITU: Focus on how 802 can best leverage.
Committed to Connecting the World For the last 25 years, ITU has been coordinating the development of a global broadband multimedia international mobile.
WRC–12 Industry Debrief 23 April 2012 Joint Task Group Domestic preparatory process.
Nairobi, Kenya September 2007 Preparations for WRC-07 Overview of Regional and National proposals as of 13 September 2007 Presented by Robert Witzen.
CEPT preparations status for WRC-15 Mr. Per Christensen (ECO Director) August 2015 The second Annual Middle East & North Africa Spectrum Management Conference,
CEPT positions for WRC-15 Mr. Alexander Kühn CPG-15 Chairman October 2015.
ITU-R WP 5D Update Orlett W. Pearson, Report to TR-45.5 August 2012.
INTRODUCTION TO ECC PT1 January Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC.
WRC–12 Industry Debrief 23 April 2012 Agenda item 8.2 – Future WRC Agendas.
Role of World Radiocommunications Conference and European preparations for WRC Stella Lyubchenko 4 th CEPT Workshop on European Spectrum Management and.
WGFM PT49 BB PPDR Dublin, 26 – 27 November 2013 Peter Buttenschön Chairman WGFM PT 49
Doc.: IEEE /12??r0 SubmissionSlide 0 IEEE 802 Plenary, Dallas, Tx RRTAG( ) meeting Consultation on Safety Related ITS 12 th November 2008.
INTRODUCTION TO ECC PT1 April ECC PT1 is the lead group on mobile in CEPT ECC PT1 is responsible for mobile broadband issues in CEPT CEPT preparation.
Major topics from ECC strategic plan Spectrum issues Peter Faris 4 th CEPT Workshop on European Spectrum Management and Numbering 5 th April 2016.
AI MHz MHz ECC DEC (15)01 + CEPT report 53 ECC-FCC-IC Liaison Meeting Maisons Alfort, May 2015 Didier Chauveau ECC PT1 Chairman.
Decisions of RA-15 and WRC-15 with Special Relevance to Developing Countries Решения AR-15 и ВКР-15 в особенности касающиеся развивающихся стран Иштван.
,4-3,8 GHz ECC Decision (11)06 + Guidelines to support the implementation of this framework at national level (mobile/FSS and mobile/FS coexistence)
ECC: what we do The ECC: Brings together representatives from CEPT members (48) Develops common policies and regulations A focal point for information.
CEPT Conference Preparatory Group
1210 MHz of harmonised spectrum (ECC framework)
PRESENTATION OF MONTENEGRO
broadband applications, in accordance with Resolution 233 (WRC-12)
Dr Mohaned Juwad Senior Manager – Spectrum Strategy Intelsat
Cindy Cook Chairman, TG 5/1 November 2, 2016
IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)
ECO Frequency Information System (EFIS) Overview
Importance of international harmonisation
Challenges and opportunities for CEPT
Activities in CEPT-ECC potentially relevant for UIC
Session 1 The ECC in practice, its structure, its working process
Panel Session 3 WRC-15 Agenda item 1.1
Thomas Weilacher WG FM Chairman
Introduction to ECC PT1 February 2011.
Thomas Weilacher Chairman ECC Working Group FM
Panel Session 4 WRC-15 Agenda items 1. 2 and 1. 3 (incl
CEPT ECC Vice Chairman Jaime Afonso
Broadband PPDR frequency situation in Europe
WiFi Alliance 18th October 2016 Spectrum for WiFi – ECC Actions
5G and IMT Identification - Views from CEPT-
Importance of international harmonisation
Alexander Kühn Chairman ECC CPG19
Doriana Guiducci, European Communications Office
European 5G regulatory developments
Introduction to ECC PT1 August 2018.
IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)
CEPT ECC Vice Chairman Jaime Afonso
ITU Radio Issues in 2003 Progress Report ITU-R GSC /01/2019
Draft ICAO Position for ITU WRC-19
François Rancy Director, ITU Radiocommunication Bureau
Update of ARIB Activities on IMT Standardization
World Radiocommunications Conference
September 2003 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Millimeter wave frequency allocation.
Status report from ITU-R WP 5A on ITS activities
Activities of ARIB on IMT Standards
Possible Future Agenda Items
Preliminary GSC positions on WRC-19 agenda items 1.13 IMT
Presentation transcript:

INTRODUCTION TO ECC PT1 February 2015

Some History ERC established ERC TG1 on UMTS/IMT-2000 (the group has held 17 meetings) 1997 TG1 produced first ERC Decisions and developed responses to the first EC Mandates on UMTS ECC PT1 developed major UMTS/IMT ECC deliverables implemented by most CEPT countries ERC PT1 held its 1 st meeting in Mainz, Germany ECC PT1 has held over 48 meetings and continues addressing IMT and MFCN matters ECC PT1 has been an active contributor to ITU-R (WP5D, JTG ) 1

2 Mr. Pasi Toivonen FICORA ERC TG1: August 1997 – October 2000 Mr. Didier Chauveau ANFR ECC PT1: October 2009 – present time Mr. Peter Scheele BNetzA ECC PT1: October 2003 – October 2009 Mr. Jim Connolly ComReg ERC/ECC PT1: October 2000 – October ECC PT1 Chairmen 2

GSM, DECT IMT-2000/UMTS, MFCN Contributions – Deliverables ECC PT1 CEPT administrations Industry International organizations In average meeting: 78 participants with ~60 % representing industry 50 input documents 20+ ECC deliverables 10+ CEPT Reports 3

2 Participants 4

Documents 5

CEPT Members 6

ECC PT1 Terms of Reference The Project Team shall be responsible for implementing the WAPECS concept as appropriate in the context of MFCN and in frequency bands identified by ECC, including collaborating with WG FM on frequency management issues (e.g. cross-border coordination issues, sharing of bands with applications other than MFCN). ______________________________________________________________ 1 In recent ECC Decisions, spectrum has been designated to MFCN (mobile/fixed communications networks) which includes IMT and other communications networks in the mobile and fixed services" which would include fixed wireless access but not point-to- point links. 1 7 See full ECC PT1 Terms of Reference on the ECC PT1 webpage See full ECC PT1 Terms of Reference on the ECC PT1 webpage

ECC PT1 Officials Chairman Mr. Didier Chauveau, ANFR, DPSAI Tel: Vice-chairman Mr. Pasi Toivonen FICORA Tel: Secretary Mr. Arnaud Guerin, ANFR Tel: Vice-chairman Mr. Steve Green OFCOM Tel:

Place of ECC PT1 within ECC ECC WG FM Frequency Management WG SE Spectrum Engeneering WG NNA Numbering, Naming Addressing CPG Conference Preparatory Group ECO ECC PT1 IMT Matters Steering Group ETSI SRDoc FM49, FM50, FM51, FM52, FM55, EFIS/MG SE7, SE40, STG 3GPP WiMAX Forum GSM A Industry UMTS Forum 9

ECC PT1 co-operation with external entities ECC PT1 ECC APT Wireless Group (AWG) CITEL 10 European Commission

ECC PT1 input to the CEPT preparation to the WRCs (pre WRC -2015) ECC PT1 has contributed to the preparation of the European Common Proposals (ECPs) for the World Radiocommunication Conferences (WRCs) on the following Agenda Items: WRC-2000: WRC-2003: WRC-2007: review of spectrum and regulatory issues for advanced mobile applications in the context of IMT ‑ 2000, noting that there is an urgent need to provide more spectrum for the terrestrial component of such applications, and priority should be given to terrestrial mobile spectrum needs, and adjustments to the Table of Frequency Allocations as necessary identification of a global radio control channel to facilitate multimode terminal operation and worldwide roaming of IMT ‑ 2000 to consider progress of ITU ‑ R studies concerning future development of IMT ‑ 2000 and systems beyond IMT ‑ 2000, in accordance with Resolution 228 (WRC ‑ 2000) to review the results of studies in response to Resolution 539 (WRC ‑ 2000) concerning threshold values for non ‑ GSO BSS (sound) in the band ‑ MHz, and to take actions as required to review and revise technical, operational and regulatory provisions, including provisional limits in relation to the operation of high altitude platform stations within IMT ‑ 2000 in the bands referred to in No , in response to Resolution 221 (WRC ‑ 2000) to consider frequency-related matters for the future development of IMT ‑ 2000 and systems beyond IMT ‑ 2000 taking into account the results of ITU ‑ R studies in accordance with Resolution 228 (Rev.WRC ‑ 03) to review the technical, operational and regulatory provisions applicable to the use of the band MHz by space services in order to facilitate sharing with current and future terrestrial services without placing undue constraint on the services to which the band is allocated 11

WRC-2015: AI 1.1 and AI 1.2 WRC-2015: Support CPG_PTD on AI 1.1: to consider additional spectrum allocations to the mobile service on a primary basis and identification of additional frequency bands for International Mobile Telecommunications (IMT) and related regulatory provisions, to facilitate the development of terrestrial mobile broadband applications, in accordance with Resolution 233 (WRC 12); Support CPG_PTD on AI 1.2 to examine the results of ITU R studies, in accordance with Resolution 232 (WRC 12), on the use of the frequency band MHz by the mobile, except aeronautical mobile, service in Region 1 and take the appropriate measures; ECC PT1 is paving the way for the future of mobile ECC PT1/CPG PTD meetings were co-located ensuring efficient organization and cooperation for drafting CEPT position on AI 1.1 and AI 1.2 in synergy with harmonisation measures under development in ECC 12

ECC PT1 input to the WRC-2015 WRC-2015: Support CPG_PTA on AI 4 and 10 to further develop the working document on «Proposed action on Resolutions relating to Mobile Service» and the ECP elements When developing its response to CPG PTA, ECC PT1 addressed contributions from industry on future needs from mobile sectors on frequency ranges above 6 GHz, specific frequency bands to be considered for future IMT-systems, Initial characteristics of systems operating in the bands above 6 GHz, provide initial estimations for spectrum requirements for systems above 6 GHz 13

ECC PT1 is the CEPT entity contributing to ITU-R WP5D 14 Since the establishment of the ITU-R WP5D “IMT Systems” (successor of ITU-R WP8F) in January 2008, ECC PT1 has been contributing to its work by presenting the CEPT positions on the issues on the agenda of WP5D, including: Development and update of ITU-R Recommendations and Reports on IMT Digital Dividend ( MHz for Region 1) IMT-Advanced submission and evaluation process Cognitive Radio Systems (CRS) Femtocells (home base stations) 3,5 GHz 700 MHz ECC PT1 is brand recognized at the international level and in the industry

How is ECC PT1 organised? Sub Working Groups (SWGs) are active during the ECC PT1 plenary meetings Correspondence Groups (CGs) are active between ECC PT1 plenary meetings Opening plenary Closing plenary Sub working group A Sub working group C Plenary meeting n Plenary meeting n+1 Correspondence group X Correspondence group Y Correspondence group Z The number of CGs may vary 15

ECC PT1 and CPG-PTD (WRC 15) organisation ECC PT1 and CPG-PTD (WRC 15) meets on the same week and same location to account for the request of experts to attend similar topics Opening Plenary CPG PTD Closing Plenary CPG PTD Drafting groups ECC PT1 and CPG PTD Parallel configuration 16 Opening Plenary ECC PT1 Closing Plenary ECC PT1 Opening Plenary CPG PTD Closing Plenary CPG PTD Sequential configuration Opening Plenary ECC PT1 Closing Plenary ECC PT1 Week days Drafting groups ECC PT1 Drafting groups CPG PTD MondayFriday

Presentation of ECC PT1 SWGs SWG-A – “ Spectrum Issues ” Chairman: Mr. Michael Kraemer (E-Plus Mobilfunk GmbH) eplus-gruppe.de SWG-C – “ Compatibility and Sharing Issues ” Chairman: Mr. Sverker Magnusson, (Ericsson) ericsson.com 17

ECC PT1 current and recent activity The following presents a list of current and recent activity within ECC PT1: ECC DEC (15)CC on 700 MHz MFCN and CEPT report 53 (EC mandate 700 MHz) Developed cross border coordination REC for MFCN in MHz and in 3,4- 3,8 GHz Revised ECC/DEC(05)05 to improve the band plan 2,6 GHz and to add relevant technical conditions (BEM) Developed ECC report on “Coverage obligations” and on” Mobile Communication On- board Vessels” Managed the evolution of ECO Report 03 on licensing of mobile bands now available from EFIS Will soon start to review ECC/DEC(08)08 on MCV Will develop an ECC report on operational guidelines to support the implementation of the current ECC framework in the GHz range Will further work on Task 3 of the EC Mandate on 700 MHz 18

Response to EC mandate ECC PT1 elaborated CEPT Reports as responses to EC mandates (example of the last 3 years) GHz - CEPT Report 049 in response to the EC Mandate (development of new BEM for greater channel bandwidths and band plans) Mobile Communications onboard Aircraft (MCA) – CEPT 048 Report in response to the second EC Mandate 700 MHz – CEPT Report 053 in response to EC mandate and ECC/DEC(15)CC (development of harmonised technical conditions for the band MHz) 19

ECC PT1 webpage The most recent information: 20

For further information on ECC PT1 21 Please refer to the ECC PT1 contactsECC PT1 contacts