OPEX FOR NETWORK OPERATORS Questionnaire Sofie Verbrugge Didier Colle Ilse Lievens.

Slides:



Advertisements
Similar presentations
Available & Effective charging solution for electric cars Advanced mobile charging systems.
Advertisements

HIPSSA Cost model training workshop: Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA.
B Topological Network Design: Link Locations Dr. Greg Bernstein Grotto Networking
OVERVIEW ON THE MUNICIPAL GUIDELINE,BENCHMARKS
COR2557: Revisions to the Metering Charges Pricing Module on Unique Sites UK Link Committee – January 2014.
Media | Telecom | Smart transfer | Satellite Introduction 1/2 ARCHIVE | PRODUCTION POST PRODUCTION |PLAYOUT MONITORING.
Transposition of Consumer Rights ERGEG Monitoring Report Christina Veigl-Guthann, ERGEG Task Force Chair.
FEAST The TERENA Compendium of NRENs & Data Collection from African NRENs & NRENs in Construction Ubuntunet Connect 2008 Lilongwe, Malawi Tuesday 11 November.
Towards an ‘easy office’ : ICT and Telecom : a Lovestory ! Michel De Maeyer Marketing Manager Small Business Customers.
Multi-Level Marketing aka Network Marketing Not so simple with ”non physical” product In our case more like promoting and recommending than actual selling.
Health Informatics Series
Our Business Phone System Stepping Back & Looking Forward Add your logo here [Delete this text box.] Add your logo here [Delete this text box.]
Intelligent Placement of Datacenters for Internet Services Íñigo Goiri, Kien Le, Jordi Guitart, Jordi Torres, and Ricardo Bianchini 1.
January 28, 2014 Miami New generation integrated narrow-band M2M telecom platform.
Real Estate Principles and Practices Chapter 15 Property Management © 2014 OnCourse Learning.
BC Yukon Technical Support Network BC & Yukon Technical Support Network Welcome.
Request For Proposal Barbara Antuna Ronald Healy Chad Hodge Andrew James Mel Ocampo.
Quality Property Management of Columbia’s Best Rental Homes!
”Cost analysis of Mobile Charging and Billing” Arturo Basaure November 2005.
Contribution since August,2008 National MSME Conclave 19 November, 2014 Use of ICT to make MSME more competitive and sustainable Tapan K. Patra Director.
Using technology to increase the value of Real Estate
Presentation by AER’s Consumer Challenge Panel (CCP) sub-panel 7 David Prins and Robyn Robinson.
Virtual Packet Core Cloud solution for LTE. if you need to construct LTE network for 1mln users... How will it work for operator?
United Telecommunication Services Michael Gaari Manager Network Provisioning UTS
Internet Policy Day 1 - Workshop Session No. 2 Market structure Prepared for CTO by Link Centre, Witwatersrand University, South Africa.
WP2 TEA1 Feasibility of Bandwidth on-Demand Case study approach, models and issues Stuttgart meeting th of September 2005 WP2.3/2.5 Håkon.
Systems Development Lifecycle Project Identification & Selection Project Initiation & Planning Analysis Logical Design Physical Design Implementation Maintenance.
Copyright © Allyn & Bacon 2008 POWER PRACTICE Chapter 7 The Internet and the World Wide Web START This multimedia product and its contents are protected.
InterQuality WP4 workshop findings Anna Zawada, WP4 reporter.
One Step At A Time Retaining Traditional PBXs While Benefiting from IP Telephony.
The Marketing Research Project. Purposes of the Project 1.Give you practical experience at conducting a marketing research project. 2.Examine some factors.
Toolbox Helping You Define Value and Close Business Defining the Value of Desktops-as-a-Service.
- 1 - Networking costs Estimation of costs for campuses Jean-Paul Le Guigner
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
Davos® Telecom Server All-In-One Solution (IVR,ACD,Billing) Architecture> Voice servers, database, disk array, redundancy, administration.
Intelligent Water Metering The Industry View Phillip Mills Water UK 27 April 2006.
Who Direct Energy is… Canada’s Largest energy solutions provider Over 3 million customers in Ontario and business customers across North America.
1 NGN Evolution & its Overview Desire for a new platform: User requirements increased — MORE BANDWIDTH Technology growth — INTELLIGENT NODES, SWITCHES.
Increasing Productivity and Efficiency in your Field and Office.
Fresh from Us to You.  Young families  Middle to high income  Long distance between markets  Families always too busy.
Frankfurt (Germany), 6-9 June 2011 SmartLife Guillaume & SmartLife Core Group – France – S1 – Paper SmartLife initiative in Focus.
Franchise Fees, what are they all about?. What is a franchise fee?
SMART GRIDS & SMART CITY ENERGY EFFICIENCY BIG DATA INTERNET OF
1 Team Skill 1 - Analyzing the Problem Continued and Product Features and Challenges Sriram Mohan.
Consult 21 Interconnect Working Group 7 Nov 2005 Ian Self Virtual Interconnect Capacity Product Outline The information in this presentation relates to.
Managing Costs Strategically - A Road to Success By Manoj Misra Head of Regulatory(SP) Vodafone-India.
“ASC-HS” - The official hosting services for ARCHIBUS, the number one Software Solution for Real Estate, Infrastructure, and Facilities Management in the.
Requirements Engineering Processes. Syllabus l Definition of Requirement engineering process (REP) l Phases of Requirements Engineering Process: Requirements.
VeExpress Cloud Service Products currently supported in VeExpress TX300s (300sm, 320sm, 100G, OTDR) RXT (3000, 6000, OSA) MTTplus (320, OTDR)
-1- WE CARE ABOUT OUR CITY - HOUSTON’S CITY COUNCIL.
Real Estate Principles and Practices Chapter 15 Property Management © 2010 by South-Western, Cengage Learning.
Hosted vs. Premises-based VOIP: There is No One Right Answer Wendy Moore-Bayley Solutions Marketing, UCaaS, Mitel
A clear and balanced view on FTTH deployment costs K. Casier, S. Verbrugge, R. Meersman, D. Colle, M. Pickavet, P. Demeester.
DSL Business Services ITU/BDT Arab Regional Workshop on “DSL Technologies and Services” Cairo - Egypt, 4-6 March 2003 ITU/BDT Arab Regional Workshop on.
The Marketing Research Project. Purposes of the Project 1.Give you practical experience at conducting a marketing research project. 2.Develop a systematic.
ENERGY, PERFORMANCE & VALUE Dr Neil Blake, Head of EMEA Research & Rebecca Pearce, EMEA Head of Sustainability 30 th June 2015.
Software development techniques in Albanian private software companies Arbora Dalaci, Esmeralda Kapcari
Project Life Cycle and Organization Unit 2. Project Life Cycle Defines the phases that connect the beginning of a project to its end What technical work.
Q results April Management commentary to Stock Exchange about Q results The Group’s sales revenues in the first quarter were primarily.
Requirements Determination
Liberalisation and regulation in the telecommunication sector: Theory and empirical evidence Week 3 The European Regulatory Framework for the Telecommunication.
Feasibility.
Enterprise Systems Management – ESM821S
Enterprise vCPE use case requirement
Networking for Home and Small Businesses – Chapter 2
ENCLAVE POWER COMPANY LIMITED
Internet access in Uzbekistan:
Joint Application Development (JAD)
QoS based pricing in IP Networks
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Presentation transcript:

OPEX FOR NETWORK OPERATORS Questionnaire Sofie Verbrugge Didier Colle Ilse Lievens

2Outline Objectives OpEx model: matrix description First questionnaire results Future work

3Outline Objectives OpEx model: matrix description First questionnaire results Future work

4Goal Examine OpEx cost for network operator Distinguish several OpEx subparts Identify relative importance Compare CapEx - OpEx

5Scope Backbone networks Incumbent European operator

6Outline Objectives OpEx model: matrix description First questionnaire results Future work

7 OpEx partitioning OPEX condition bound reparation and installation administration supply management and planning provisioning maintenance salesgeneral charging and billing periodic preventive network planning general Comments: - Important parts: administration (customer care), provisioning (NOC?) - Maintenance subparts: periodic maintenance includes upgrades, preventive maintenance not too common - Additional subpart: marketing?

8 Actual expenses Personnel Energy Rental and licenses (including material) Problem: distinguishing between CapEx and OpEx Our proposal: Real estate: CapEx Network equipment: bought -> CapEx, leased -> OpEx Comments Is it that simple? Intermediate solutions?

9 Matrix description

10 Cost drivers = OpEx influencing network characteristics –network dimension –average link length –number of users –number of connections –number of boxes –availability –used network technology

11Outline Objectives OpEx model: matrix description First questionnaire results Future work

12 Importance of OpEx subparts Relative importance of subparts in total OpEx cost maintenancereparationadministrationsupplymanagement and planning provisioning No consensus concerning importance of subparts of maintenance, administration, …

13 Importance of actual expenses Relative importance of actual expenses in total OpEx cost personnelenergyrental and licences material actual expenses relative importance in total OpEx (%) Improvement to the model: take rental & licenses and material together

14 OpEx subparts vs actual expenses maintenance reparation and installation administration supplies management and planning provisioning material rental and licences energy personnel Strong dependencies

15 OpEx subparts vs cost drivers

16 OpEx / CapEx ratio opex capex OpEx/Capex = 1.66 OpEx/Capex = 4 Belgacom opex 69% capex 9% rest 22% France Telecom opex 65% capex 14% rest 21% year report (website) OpEx/Capex = 7.71 OpEx/Capex = 4.82

17Outline Objectives OpEx model: matrix description First questionnaire results Future work

18 Future work Collect more answers on questionnaire Try to come up with formulae: OpEx subparts = f (cost driver) All suggestions welcome! First results to be presented on NOC workshop

Questions??