Large Cell Scope Pictures, Part II HV Gnd 1nF Large Cell Tube Anode signal Phi Cathode signal scope S1 S2 S1 S2 This is a follow-up on Richard’s measurement.

Slides:



Advertisements
Similar presentations
1 Cable Assembly for CanSat. 2 Heat Shrink Tubing Battery Pack Connection Pin Connectors Radio Cables Mic & Speaker Plugs See close up connection page.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Assembling a Functional Multi-Wire Proportional Counter - Page 1 Work in pairs. One person will take the chamber apart, and the other will reassemble it.
E0’ setup at CERN, , lab 187-R-D06, via bat 70, tel Is there a sock over the umbilical - if so how connected to chassis. and how far does.
We begin by subtracting noise (run flash lamp without HV) from signal (run flash lamp with HV) In the above for the cathode, we subtract the brown noise.
E/π identification and position resolution of high granularity single sided TRD prototype M. Târzilă, V. Aprodu, D. Bartoş, A. Bercuci, V. Cătănescu, F.
SQUARE PAD PCB DESIGN Elizabeth Starling, Jerry Collins Florida Institute of Technology High Energy Physics Lab A January 26 th, 2015.
Flat-Panel Grid Antenna R Struzak. This antenna offers ~18 dBi gain, VSWR
Power supply cable Charge injection 3 channels readout (external cables to the scope) 3 channels readout (internal cables) Set up for reading two cards.
1Daya Bay RPC HV FDR 6/17/2008 RPC HV cable pick-up noise issue C. Lu, Princeton University (6/17/2008)
D. Peterson, “The Cornell/Purdue TPC”, LCWS05, Stanford, 21-March The Cornell/Purdue TPC Information available at the web site:
Lab #3.
60 Hz Variations in Pins Plugged probe into temperature controller output pins: pins 1, 2, 3, 4 all show 1V p-p variations Plugged probe into pins at other.
1 ME 234/2 HV noise investigation N.Bondar CMU. 12/18/02.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Chamber PCB s, FEB s, Cooling, HV/LV Distribution 1)PCB designs-track widths, track to track distances … 2) Double sided and Multi layer, modular approach.
Large Cell Scope Pictures HV Gnd 1nF Large Cell Tube Anode signal Cathode signal scope S1 S2 S1 S2 The following scope pictures were all taken with the.
DESIGN OF THE HATCH OF THE INSTRUMENT BOOTH OF EUSO-BALLOON version v1.2 Writer : SYLVIE DAGORET- CAMPAGNE Final tests and Health tests1
43.35” (LENGTH OF INNER LIQUID HE RESERVIOR)  CONNECTION CHAMBER: FF 4.75”  FF: FLANGE-TO-FLANGE DISTANCE 10.45” TO 12.45” 6.35” TO 8.35” (JACK -2” TO.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
Report 2013/04/15. FADC frequency study (cont.) Amplifier gain Problem.
1 Fulvio TESSAROTTO CERN, 23/04/ Contribution from Trieste UPDATE ON TRIESTE LAB. ACTIVITY The set-up to measure currents THGEM prototypes from ELTOS.
Electroplating. The electroplating of an object with metal is accomplished using an electrolytic cell. There are some basic rules for electroplating.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Simple EL84 Basic layout DIY Paradise 13 June 2003.
Detector R&D for Muon Chamber Anand K. Dubey For VECC group.
Update on the CDC GlueX Collaboration Meeting October 2006.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
HV Connector and Endcaps, Part II After the discussion at this week’s LST meeting we went back to the drawing board and tried to implement Mauro’s suggestion.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
E-Cal Readout Boards - 8 Boards total -Design & Fabrication at Jlab - Assembly at Orsay Nick Nganga HPS Collaboration Oct Jlab.
2003/Oct/19 version.Page 1 Aerogel HV cable assembling procedures (for W1-NORTH-side of 80 Aerogel Boxes) Phenix high-pt PID upgrade team Original version(Oct/11/’03):
1 Fulvio TESSAROTTO CERN, 20/03/ GDD Meeting - Contribution from Trieste FIRST LOOK AT THGEM IN TRIESTE LAB. The set-up to measure currents THGEM.
Step 1. Place IC on board. Leave one empty row below IC.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
2003/Nov/16 version #1.Page 1 Aerogel HV cable assembling procedures (for W1-SOUTH-side of 80 Aerogel Boxes) Phenix high-pt PID upgrade team Original version(Oct/11/’03):
Saverio MINUTOLIElectronics WG - 09 June AFEC cross-talk Plots illustrating Cross-talk effect AFEC pcb investigation.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
RD51 Group Saha Institute of Nuclear Physics 14 February, 2014
The fault occurred at the level of 400V-500V. Investigation of the fault to ground at the RCS.A34B2 circuit Between 3 and 12 September, 2014 we carried.
SEM SIC SEM SIC 2 SEMs & 2 SICs closed to the Dumps 1 SIC, 1 Faraday cup & 1 SEM SEM SIC F. cup 4 similar set-ups : Girder 6,7,11 and 13 4 th – 8 th October.
LSTs in the IFR gaps Workshop on IFR replacement SLAC November 14, 2002 L. Piemontese INFN Ferrara.
1 9 December 2002A.P.Kashchuk (LNF/INFN), Frascati) New approach to CPC design.
4/22/20131BEAST MEETING Reminder of BEAST TDR schedule (expected deliverables in red) April 19 th: – Draft specifications for each beast subsystem We need.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
Test Tube Activities at Ohio State (7/29/03) Amphenol/Spectra Strip will send two 10 m long samples of signal cable –With a (round) jacket, shielding –20.
A systematic study of cross-talk limitations in RPC timing
TDR Measurement of MCP Anode
Meeting on Services and Power Supplies
GRPC activity for EuDHCAL in IHEP-Protvino
HPS Motherboard Electronic Design
Study of Chinese oil-less chamber
LV Test Napoli feb 05 Noise ripple: EASY - + CRATE LV cable
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
Tutorial on the Ortec 935 Quad Constant Fraction Discriminator
LST Module Installation
Component Tracking Use computer based tracking system
Overview of T1 detector T1 is composed by 2 arms
Testing of the EMCO Prototype Boards
Perturbation of Focusing Field Profile due to HV Support Tube
350kV and 500kV Yan 9/8.
Single rate plateau curve with different gas mixture
Limited Streamer Tube Project Summary
2-D Representations of Solids
Connection between PC(host),502B and EZ USB(device)
Presentation transcript:

Large Cell Scope Pictures, Part II HV Gnd 1nF Large Cell Tube Anode signal Phi Cathode signal scope S1 S2 S1 S2 This is a follow-up on Richard’s measurement of large cell signals. In addition to his test I added a small, 7 cm z-strip under the LST. This z-strip is made out of copper tape, about 7x15 cm^2. It is connected via a BNC connector and a 50 Ohm coax cable to a scope (50 Ohm termination) If have updated the two drawings below taken from Richard’s presentation. Ground plane above cathode and below tube (see picture below) Please note that there is an asymmetry in the chamber endcap: the HV pins are not located at the symmetry line but closer the the bottom of the tube. According to the drawings of the large cell tubes that are available on the web, this is the closed side of the profile. If this is correct, our phi signals come from the open side of the profile, the z signals come from the closed side. gg g=gas fitting +=HV 0=ground Z cathode signal phi strip z strip

Example 1: Anode at 20 mV, z at 10 mV and phi at 5 mV per division

Example 2: Anode at 20 mV, z at 10 mV and phi at 5 mV per division

Example 3: Anode at 20 mV, z at 10 mV and phi at 5 mV per division

Conclusion: We see signal in coincidence at both cathodes and the anode Anode signals are the largest. Followed by the z strip signals (which we believe come from the closed side of the profile) which are about ½ the size of the anode signals. The phi signals (which we believe come from the open side of the profile) are about ¼ the size of the anode signals. Clearly this is not a complete test. The next step is to measure pulse height spectra for each signal source, check the HV dependency etc.