Presentation is loading. Please wait.

Presentation is loading. Please wait.

E-Cal Readout Boards - 8 Boards total -Design & Fabrication at Jlab - Assembly at Orsay Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab.

Similar presentations


Presentation on theme: "E-Cal Readout Boards - 8 Boards total -Design & Fabrication at Jlab - Assembly at Orsay Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab."— Presentation transcript:

1 E-Cal Readout Boards - 8 Boards total -Design & Fabrication at Jlab - Assembly at Orsay Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab

2 MotherBoard Each Signal trace has Ground guard traces Signal trace 8mil space 8 mil Stackup verified in BoardSim Crosstalk simulated for longest traces **Board layers for Full Experiment. 4 Boards (2-Identical) 16- layers 6 signal layers 2 High Voltage 2 Low Voltage 6 Ground Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab

3 Amplifier Connections 1.GND (2 pins) 2.High Voltage (1 Pin) APD Connections (2 pins) 1.Anode 2.Cathode Connection Boards 4 Boards (2 similar)  2 Layers  2 Connectors (No traces) Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab

4 Ecal Grouping Each grouping requires its own High Voltage Connection Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab

5 SI - Simulation Characteristic Amplifier Output (DVCS 2005) Tested on Longest Trace ~ 22inches Equivalent to 4ns prop. delay. Longest Trace Highlighted for Signal Integrity Analysis Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab

6 Simulation Setup: CMOS Driver with 0.8V/ns slew rate. Termination: 50-ohm. Result: Less than 2% reflection (40mV on 2V scale) Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab

7 Crosstalk Threshold set to 15mV (only one trace affected) Crosstalk Threshold set to 20mV (Two traces affected) CROSSTALK SIMULATION Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab

8 Board Status (design) Connection Boards ~1.5 Days – Bottom Right ~0.5 days – Top Right ~ 0.5 days – Bottom Left, Top Left ~ 0.5-day MotherBoards ~2.5 Days – Bottom Right ~1 day – Top Right ~ 1 days – Bottom Left, Top Left ~ 0.5-days Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab


Download ppt "E-Cal Readout Boards - 8 Boards total -Design & Fabrication at Jlab - Assembly at Orsay Nick Nganga HPS Collaboration Oct 18-19 2011 - Jlab."

Similar presentations


Ads by Google