1 Demand Response Implementing Demand Response and AMR / AMI Systems used by the Electric Cooperatives of Arkansas by Forest Kessinger Manager, Rates and.

Slides:



Advertisements
Similar presentations
In the Post 06 Environment November 9, 2006 Jim Eber Demand Response.
Advertisements

© USCL Corporation - All Rights Reserved USCL Corporation 2737 Eastern Avenue Sacramento, California A managed approach to the successful.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
0 © 2011 Silver Spring Networks. All rights reserved. Building the Smart Grid.
Oklahoma Gas and Electric APSC Workshop on Electricity Demand Response and Advanced Metering for Integrated Utilities Demand Response & Automated Metering.
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
AMR/MMR And Tamper Detection Alan Chapman SCRPA/SURPA/IURPA Conference Atlanta, GA June 18 – 21, 2002.
What we found Benefits n Annual benefits = 9% to 16% of system cost n Most (60% - 70%) come from meter reader staff reductions. n Considerable stakeholder.
WAL-MART STORES, INC. DEMAND RESPONSE. Wal-Mart in New York Supercenters45 Discount Stores45 Neighborhood Markets 0 Sam’s Clubs17 Distribution Centers4.
E-Mon Energy™ Energy Monitoring Software
Electrical Engineering Fundamentals for Non-EEs; © B. Rauf
Smart Meters, Demand Response and Energy Efficiency GRIDSCHOOL 2010 MARCH 8-12, 2010  RICHMOND, VIRGINIA INSTITUTE OF PUBLIC UTILITIES ARGONNE NATIONAL.
Susan Covino Senior Consultant, Emerging Markets March 31, 2015
Katrina Pielli U.S. Environmental Protection Agency CHP Partnership
Overview – Non-coincident Peak Demand
Manaen Srigiri James Abhilash DEMAND RESPONSE ___________________________ OUR RESPONSE TO CRITICAL CHALLENGES.
WAL-MART STORES, INC. ENERGY EFFICIENCY AND DEMAND RESPONSE.
COMPETITIVE ELECTRICITY MARKETS March 15, PA Customer Choice Legislation  Distribution service remains regulated by PAPUC.  Transmission service.
Solar Metering and Performance Monitoring Exposition June 4, 2007.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
Smart Cities & Smart Utility
Getting ready for Advanced Metering Infrastructure Paper by : Rajesh Nimare Presented by : Prashant Sharma.
Demand Side Management The Natural Purview of Utilities The Customer Viewpoint Rates on the Rise in a Rough Economy - Responding to New Realities Marketing.
…While Investing To Achieve Excellence In Reliability 30% Transmission capital investment 03-06; $ millions Distribution capital investment 03-06; $ millions.
Future of Smart Metering Kansas Renewable Energy & Energy Efficiency Conference September 26, 2007.
Infrastructure & Cities Sector – Smart Grid Division © Siemens AG All rights reserved. October 2012Page 1 The Smart Grid by Siemens Constant energy.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
© 2006 San Diego Gas & Electric Company. All copyright and trademark rights reserved. SDG&E’s Sustainable Communities Program and Support for our Solar.
FERC Assessment of Demand Response & Advanced Metering 2006 APPA Business & Financial Conference September 18, 2006 – Session 11 (PMA) Presented by: Larry.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
Entergy Arkansas, Inc. Existing Demand Response Programs Kurt Castleberry Director, Operating Committee Support May 24, 2007.
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
Maureen Trumble Jack Hobbick AMI – Providing the Smart Grid Foundation.
OVERVIEW OF ISSUES DR AND AMI HELP SOLVE Dr. Eric Woychik Executive Consultant, Strategy Integration, LLC APSC Workshop on DR and AMI.
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
ERCOT MARKET EDUCATION
September 24, 2007Paying for Load Growth and New Large Loads APPA September 2007.ppt 1 Paying for Load Growth and New Large Loads David Daer Principal.
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
Advanced Metering Infrastructure (AMI) Project Update Mark Heintzelman June 2010.
Linking the Wholesale and Retail Markets through Dynamic Retail Pricing Presented by: Henry Yoshimura Manager, Demand Response ISO New England September.
Smart Grid Workforce Education Presentation Smart Grid – A Framework for Change Brad Gaskill, CEO - Poudre Valley REA May 29, 2009.
CEC 08-DR-1 Efficiency Committee Workshop 3/3/08.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
Chicago Advanced Energy Demand Response & CSP Evolution Kellen Bollettino Comverge Inc. 10/23/14.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
1 Demand Response A 28 Year History of Demand Response Programs for the Electric Cooperatives of Arkansas by Forest Kessinger Manager, Rates and Forecasting.
NARUC/FERC COLLABORATIVE: DEMAND RESPONSE Paul Suskie, Chairman, Arkansas Public Service Commission July 15, 2007.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
Presentation of Capabilities contact information Kevin Monte de Ramos (888)
Advanced Metering Rule Christine Wright Public Utility Commission of Texas June 6, 2007 Retail Market Workshop COMET WG Meeting.
LOAD RESEARCH Irrigation Load Study Utah Cost of Service Task Force August 25, 2005.
The AMI Advantage Presented by Keith Brooks. Located in North Idaho We serve 25,000 meters 2,000 miles of power lines 73 employees Service territory has.
Consumers Energy Advanced Metering Infrastructure Review and Feedback Utility AMI / Open HAN Meeting August 15, 2007.
CEC Public Workshop Order Instituting Informational and Rulemaking Proceeding (08-DR-01) March 3, 2008.
Metering Americas April 24, 2006 Advanced Metering.
S V.MOUNICA 09551A0294.  To increase the distribution rate of present electric supply which is 70% to 100%.  Improving the supply to house holds without.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Residential demand charges
SMECO Demand Response filing
Chairman of the Board and CEO,
Mass Market Demand Solutions in PJM
Narragansett Electric Rate Classes
Allegheny Power Residential Demand Response Program
Electricity Demand Response and Advanced Metering for Integrated Utilities Arkansas Public Service Commission Lonni Dieck AEP May 24, 2007.
Generation Expansion Daniel Kirschen
Advanced Metering Infrastructure Smart Meters
Wholesale Electricity Costs
Presentation transcript:

1 Demand Response Implementing Demand Response and AMR / AMI Systems used by the Electric Cooperatives of Arkansas by Forest Kessinger Manager, Rates and Forecasting

2 Three Requirements for the Cooperatives’ Demand Response Program to Succeed 1.An economic incentive for members. 2.An information system which provides current load data to load managers. 3.A means of either directly interrupting loads or to confirm that loads have elected to interrupt (voluntary interruption).

3 Requirement # 1 Economic Incentives

4 Economic Incentives to the Member Cooperatives Under Arkansas Electric Cooperative Corporation’s (“AECC”) wholesale rate design, the member cooperatives receive one of the following incentives to interrupt load: 1.By avoiding a portion of AECC’s peak, a reduced billing demand is charged to the member cooperative, thus reducing the member cooperative’s wholesale power bill from AECC. or 2. The member cooperative receives an interruptible credit for allowing AECC to interrupt certain industrial retail load. This credit is currently set at 52% of AECC’s demand charge.

5 Economic Incentives to the Retail Members Given AECC’s rate design, the member cooperative then designs retail rates which: 1.Offers the retail member a credit on his monthly bill for being interruptible. or 2.Provides the retail member with a retail rate which mirrors AECC’s demand charge, i.e. if the retail member is off during AECC’s peak the retail member avoids the member cooperative’s coincident demand charge. The member cooperative’s coincident demand charge is often coupled with a non-coincident demand charge to recover distribution costs.

6 Advantages to all Members 1.A reduced cooperative investment in peaking generation facilities. This translates into lower long term costs. 2.A quick and efficient means of curtailing load during system emergencies.

7 Requirement # 2 Information to Predict Peaks

8 Time-based Metering In 1978, AECC installed wholesale metering which recorded hourly kW demand by wholesale point of delivery. This hourly data could be processed into simultaneous hourly coincident totals for each member cooperative.

9 Time-based Metering - Continued - Data from the time based meters of that era were physically recovered at the end of each month. Because instantaneous load data was not immediately available to load managers, there were inherent inefficiencies in the cooperatives’ demand response programs.

10 Early SCADA AECC’s first System Control and Data Acquisition (“SCADA”) system dedicated to providing instantaneous load data became operational on 1 June SCADA information was initially provided to all member cooperatives. The data was eventually provided to any retail commercial and industrial loads willing to sign a confidentially statement.

11 Value of the SCADA System Load managers having actual instantaneous knowledge of AECC’s loads can do a more efficient job of forecasting peaks and calling for interruptions during periods when peaks are eminent.

12 Protecting Load Data This confidentiality prevents load information from being transferred to wholesale marketing entities.

13 Requirement # 3 A Means of Interrupting Loads or to Confirm that Loads have Elected to Interrupt

14 Loads Controlled Directly by the Member Cooperatives Currently approximately 107 MW of demand is directly controlled by the member cooperatives using radio tone load control switches.

15 Voluntary Load Control by Commercial and Industrial Retail Members As much as 80 MWs are voluntarily being shed by C&I retail members. While the metering technology will vary by member cooperative, it is necessary for the member cooperative to demand meter these loads on an hourly basis to determine the retail member’s demand at the time of AECC’s peak.

16 Approximately 550 MW of Industrial Load is Controlled Under AECC’s IC Rider A separate wholesale metering point is established for each retail load served under the IC Rider. Currently there are seven such loads constituting approximately 550 MWs. The requested interruption is confirmed using AECC’s SCADA system.

17 Member Cooperatives’ Automatic Meter Reading (“AMR”) & Automated Metering Infrastructure (“AMI”)

18 AMR Advantages Reduces estimated billing, enhances accuracy, and provides a better and more timely cash flow. Reduces field staff. Reduces customer premises problems.

19 TWACS, Turtle, and Cannon all use Power Line Carrier Technology Data or electrical signals are transformed into radio frequency or modified wave form data signals which are superimposed onto AC power lines by the sender and retrieved from the AC power lines by the receiver.

20 The Advantage of AMR Power Line Carrier Technology Best AMR technology for low customer density.

21 AMR Power Line Carrier Disadvantages Power line carriers are susceptible to electrical noise. Filtering this noise is expensive. Requires significant capital investment. A more complex technology.

22 Member Cooperatives’ AMR & AMI Systems Woodruff was the first electric cooperative to install an AMR system in Currently eleven of Arkansas’ seventeen electric cooperatives are using some form of Automatic Meter Reading (“AMR”) system. Using these systems, several Automated Metering Infrastructure (“AMI”) functions are also utilized.

23 Distribution Control System’s Inc. “TWACS” Two Way Automated Communications Systems Hunt Technologies Turtle System Cannon Power Line Communications System FirstWoodruffCraighead OzarksArkansas Valley Ouachita C&L Clay North Arkansas South Central Mississippi AMR Systems Currently in Place by Electric Cooperative

24 States with the Highest Percentage of Advanced Metering Penetration Pennsylvania52.5 % Wisconsin40.2 Connecticut21.4 Kansas20.0 Idaho16.2 Maine14.3 Missouri13.4 Arkansas12.9 Oklahoma 7.2 Nebraska 6.8

25 Cooperatives are using AMR / AMI for Additional Functions 1.To confirm that radio controlled load switches are operating (pinging). 2.For reliability – to better locate outages determine the size of an outage, and to confirm repairs.

26 Cooperatives are using AMR / AMI for Additional Functions - Continued - 3.To assist with high bill complaints and energy efficiency by using hourly data to track a retail member’s usage. 4.To perform remote reads so that power is never shut off when one member moves out and another member moves in.

27 Cooperatives are using AMR / AMI for Additional Functions - Continued - 5.To remotely shut off a service. 6.To detect theft of services.

28 Future AMI Possibilities The cooperatives continue to use reliable and economical radio control switches for demand response but AMR systems are ultimately transitioning to AMI systems with demand response capabilities.

29 Future AMI Possibilities - Continued - Currently, at least one member cooperative is evaluating the possibility of installing an AMR / AMI system with demand response capabilities for water heating and space conditioning loads. The AMR / AMI system might be in place as early as 2008.

30 Questions ?