Turn-key project Key-Personnel Organisation chart

Slides:



Advertisements
Similar presentations
ThinkEnergyGroup Energy.Personnel.Fast!. Weve engineered a professional approach to energy staffing. ThinkEnergyGroup.
Advertisements

Ozone Level ppb (parts per billion)
Half Life. The half-life of a quantity whose value decreases with time is the interval required for the quantity to decay to half of its initial value.
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
PROJECT MANAGEMENT PROJECT MANAGER ENGINEERING MANAGER PROCUREMENT MANAGER CONSTRUCTION MANAGER.
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Commissioning Approach Integrated Service Solutions
The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
10- M3200 STD PSA – 250 PSIG Daesung Korea - Job # 8297 Kamal Hatami, Product Engineer Feb 20 th, 2009.
Program Controls Systems & Processes Board of Trustees Workshop October 11, 2005.
MAINTENANCE MANAGEMENT Module 9
NH PTAC Presentation Congratulations, Youve been awarded a contract. Now what? DCMA is here to help you! Sandee Murray, Administrative Contracting Officer.
Best Value For Money adjudications for Industrial Services C. Lara/CERN 14 November 2013.
COTES Group. Our Company>>>> Our Team and Resources>>>> References>>>> Engineering of the 21st Century>>>>
TabWare Overview for NetSuite
SITEMANAGER Frances J. Hood, P.E. Design/Materials/Construction Engineer Idaho Transportation Department.
IDEAL PHARMACEUTICAL FACILITY PRESENTED BY: IHSAN ULLAH KHAN KHATTAK Chief Manager Production Highnoon Laboratories Limited 17.5 K.M. Multan Road, Lahore,
Orion Energy Solutions AWEA WINDPOWER About Orion International The Nation’s largest military recruiting firm, with over 22,000 veterans placed.
Food Retail Career Paths District Manager or Director of Field Operations Store Manager Assistant Manager or Front End Manager Bakery Manager Assistant.
COMPANY PROFILE PYRAMID ENGINEERING PRIVATE LTD. THE COMPANY The Company was established in 2007, with a small group to provide Plant Maintenance, Small.
Racco industrial consulting working according to investment law to prepare Engineering, Economic, Technology, Environmental Studies for industrial projects.
Project Phases of an EPIC Contract Pre Project Basic EngDetailed Eng Procurement Long Lead Items MC Prep Installation PC Execute PC and Commissioning Preparation.
INDUSTRIAL & SYSTEMS ENGINEERING
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
MC and Commissioning Preparation
Company Profile.
Module 6/7: DPR (Detailed Project Report) & EPC (Engineering Procurement Construction)
Process Engineer’s Role in Project Management Dr Abdullah Malik.
CAPITAL COST ESTIMATES INSTALLED EQUIPMENT COSTS.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
การออกแบบ โรงงานทาง วิศวกรรมเคมี (Chemical Engineering Plant Design) 3(3-0-6)
Date: 24 Feb Labab Report2 Content 01- Introduction 02- Organization Chart 03- Company resources 06- Future vision 04-Labab Enterprise Resource.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
© 2010 Chevron A Day in the Life of a Project Manager Presented by Nancy Grossman, Project Manager Presented to Chabot College Engineering Class September.
From Research Prototype to Production
H&S Consultants Consulting Services and Project Management.
Welcome to Address : Sr. No. 227/1, Sahakar Nagar, Dighi Road, Bhosari, Pune Phone Number:
1-7 Contract Financing Don Shannon. What is Contract Financing … “the means of obtaining the funds necessary to perform the contract including – Payment.
Project Development Decision Tree PermittingIn-house Reqmts.Energy SalesFuel Consumption Plant Configuration Risk AssessmentCapital Costs Schedule Constraints.
Development and Construction of On- Shore Windfarms Andrew Aveyard Green Cat Renewables Jim Wilkinson CA Blackwells.
Michael deLamare Requirements Management Program Functions R-9.
Session 3: Project Development Agenda The Voice of a Technologist Utility Project Development Reliability Concepts Residential Project Development Homework.
Intuit Master Builder 2003 System Tour Intuit Master Builder 2003 We need that estimate today! It takes me 2 days to get out that billing. Where’s our.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
Mechanical Integrity Training. Lesson Objectives  Describe MI Training Required  Describe How to Conduct Training  Describe Requirements for Maintaining.
About Us  We are a group of Mechanical Engineers specialized in Construction & Engineering Services.  Our mission is to provide highest quality of construction.
Produced by: Towards a Rational Cost Model Presenter: Tom Lenahan Tom Lenahan Limited.
The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation.
Section 01 Executive Summary Section 02 Organization Chart Section 03 Telecom Division Activities Section 04 Construction & Test Equipment Section 05.
MEASURING AND FORECASTING COMPLETION. PROGRESS BY DISCIPLINE.
WMATA Project Implementation Manual (PIM) Stage 3, Construction Chapter 200, Authority Representative, Responsibilities and Functions Presenters: David.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
“QASHQADARYO PARMALASH ISHLARI” JOINT-STOCK COMPANY.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Enterprise Resources Planning (ERP) Definition 1 Enterprise Resource Planning A method for the effective planning and controlling of ALL these sources.
Arkom Engineering Consultants
Western Michigan University Central Power Plant
BUSINESS PROCESSES MAP
2018 Staffing Recommendation
New Construction Management Program at ITI Technical College Presentation by Sally Stuart Morgan August 22, 2017 to Be as sincere in your delivery as.
ChE 473K Plant Design R. Bruce Eldridge.
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
Project Cost Control.
L&V Manpower Development Prepared by: HR department Mar, 2013
Workshop commissioning Installation Coordination at ESS
Progress on Standardization
City of Lake Butler, Florida
SAP Fulfillment EIN 5346, Logistics Engineering Spring 2010
Presentation transcript:

Turn-key project Key-Personnel Organisation chart Director, Projects Danieli Engineering (DE) Project Manager Client Project Manager & Project Management Staff Sales Manager Export Finance & L/C Manager Project Planning & Control Contract Administr. Legal Dept. Manager Procurement Manager P.M. DE P.C. WTP process P.E. Civil & structural des. P.E. Interconnecting piping P.E. Instrumentation P.E. HVAC P.E. Firefighting system P.E. Compressed air system P.C. Workshop laboratory eq. P.C. Cranes P.M. DA Process Coordinator P.E. Substation, HV - LV power distrib. P.E. Interconnecting cabling P.C. Automation system level 1 P.C. Automation system level 2 P.M. DCM P.E. Meltshop process P.E. Mech. Equipment engin. P.E. Hydraulics lubrication P.E. Piping utilities P.E. Instrumentation Danieli Construction & Commissioning (UMAC) Client Site manager & Staff Quality Manager P.M. Construct Erection & Commiss. Safety Officier P.M. DMH P.E. Rolling process P.E. Mech. Equipment eng. P.E. Hydraulics Lubrication P.E. Piping Utilities P.E. Instrumentation P.M. DCC P.E. Combustion process P.E. L.V. Distribution P.E. Automation Site Manager Planning & quantity Survey Deputy Site Manager Material Man Quality Assurance Eng. Accounting & Cost control Site Technical Office Field Engineers Civil and infrastructure construction Supervisor Erection Supervisors Startup and commissioning Team Building erection Mechanical Mechanical equipment Electrical Reheating furnace Piping P.C. Procurement cc P.C. Manufacturing & expediting Piping and aux. Systems Aux. Systems Automation HV / LV power distribution & Automation system P.C. Packing & Shipping P.C. Spare parts P.C. Training P.C. Operation, maintenance & safety manuals P.C. Expediting / testing (E LE) P.C. Quality Control

General Management Flow Chart (part 1) CONTRACT & FINANCING TOOLS REQUIREMENTS CONTRACT SCHEDULE TECHNICAL SPECIFICATION PAYMENT METHOD/FORMALITIES PICS (PROJECT INTEGRATED CONTROL SYSTEM) MASTER PLANT LIST WORK BREAKDOWN RESPONSIBILITY PRICE BREAKDOWN SCHEDULE (LEV. III) CASH FLOW JOB POSITION (TPC/JET) INSPECTION TEST SCHEDULE (ITS) (PART 2) (PART 3)

General management Flow Chart (part 2) JOB POSITION (TPC / JET) from part 1 ENGINEERING (DOCUMENT MANAGEMENT SYSTEM - DMS) MATERIAL REQUIR. TECHN. DOCUMENTS PROCUREMENT PURCHASE & ORDERS MANUFACTURING OUTSIDE (E/LE) INSIDE (I) (PART 3)

General management Flow Chart (part 3) MANUFACTURING (FROM PART 2) INSPECTION TEST SCHEDULE (ITS) (FROM PART 1) OUTSIDE (E) INSIDE (I/LE) INSPECTION & TESTING (NOI/IRE/LOC/QCTM) INSPECTION PLANNING NOTICE OF INSPECTION (NOI) CERTIFICATIONS (IRE) RELEASE CERTIFICATE (RC) PACKING CERTIFICATION (IRP) PACKING LIST INSPECTION PLANNING NOTICE OF SURVEILLANCE (NOS) JOB POSITION (TPC/JET) (FROM PART 1) PRICE BREAKDOWN (FROM PART 1) SHIPPING & INVOICING CONSTRUCTION & ERECTION WORKS SITE PROGRESS MANAGEMENT (SPM) COMMISSIONING

Master Plant List (esempio)

Estratto Livello 3: Plant Unit 31 (Typical)

Programmazione di Livello 3 (Typical)

Programmazione di Livello 4 (Typical)

Cut-off date: Progress (Typical)

Valide per tutte le discipline e attività Curve pianificate di avanzamento (typical) % 100 90 80 70 60 50 40 30 20 10 N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A 2001 2002 2003 2004 planned progress Valide per tutte le discipline e attività