R. Ball September 27 th 2012.  Criteria Re-use existing readout systems where possible High density Build inexpensive adapters to existing systems Save.

Slides:



Advertisements
Similar presentations
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
Advertisements

EXL/R3B Calorimeters- Readout from ASIC to DAQ Ian Lazarus STFC Daresbury Laboratory.
Developing the Timepix Telescope Planning a Future Timepix Telescope Richard Plackett – VELO Testbeam Meeting CERN, 7th October 09.
RADIO FREQUENCY MODULE. Introduction  An RF module is a small electronic circuit used to transmit and receive radio signals.  As the name suggests,
PPS telescope – main idea Have 10 layers of PPS in one test-bench The entire construction is between scintillators (top and bottom) for external trigger.
A Gigabit Ethernet Link Source Card Robert E. Blair, John W. Dawson, Gary Drake, David J. Francis*, William N. Haberichter, James L. Schlereth Argonne.
DOE/NSF Review of ATLAS, 1 Mar 2000, BNL Muon MDT Front End Electronics (WBS 1.5.9) James Shank DOE/NSF Review of U.S. ATLAS Detector (with help from:
Dec 11, 2001E. Hazen -- ATLAS Muon Electronics1 ATLAS MDT Electronics On-Chamber CSM Adapter Proposed Features: –Mounts on CSM Motherboard just like the.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
L1 Meeting 11/4/2004 – Mario Camuyrano BLS-to-ADF Transition System 230 ns 100 mV/div 200 ns/div Existing and proposed calorimeter trigger rack layouts.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
ATLAS MDT Electronics Status ● ASD Chip Design (with Harvard) and Production – Full Rad-Hard test campaign completed – Production order for 67,400 parts.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
ENGIN112 L26: Shift Registers November 3, 2003 ENGIN 112 Intro to Electrical and Computer Engineering Lecture 26 Shift Registers.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
The GANDALF Multi-Channel Time-to-Digital Converter (TDC)  GANDALF module  TDC concepts  TDC implementation in the FPGA  measurements.
LECC 2004 – Boston – September 13 th L.Guiducci – INFN Bologna 1 The Muon Sorter in the CMS Drift Tubes Regional Trigger G.M. Dallavalle, Luigi Guiducci,
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
NEDA collaboration meeting at IFIC Valencia, 3rd-5th November 2010 M. Tripon EXOGAM2 project Digital instrumentation of the EXOGAM detector EXOGAM2 - Overview.
SRS DIGITAL C-CARD. TEST AND APPLICATIONS Mihai Cuciuc.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
Phase-1 Design. i PHC Phase /04/2008 System Overview Clock, JTAG, sync marker and power supply connections Digital output.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
A.A. Grillo SCIPP-UCSC ATLAS 10-Nov Thoughts on Data Transmission US-ATLAS Upgrade R&D Meeting UCSC 10-Nov-2005 A. A. Grillo SCIPP – UCSC.
27 th September 2007AIDA design meeting. 27 th September 2007AIDA design meeting.
11th March 2008AIDA FEE Report1 AIDA Front end electronics Report February 2008.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
21-Aug-06DoE Site Review / Harvard(1) Front End Electronics for the NOvA Neutrino Detector John Oliver Long baseline neutrino experiment Fermilab (Chicago)
Performance of the AMT-3 Based TDC System at Belle S.Y.Suzuki, T.Higuchi, Y.Arai, K.Tauchi, M.Nakao, R.Itoh (KEK) H.Nakayama (University of Tokyo)
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
Abdullah Said Alkalbani University of Buraimi
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
December 14, 2006Anuj K. Purwar1 Design proposal for Read Out Card (ROC) Anuj K. Purwar December 14, 2006 Nevis Meeting.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
Domino Ring Sampler (DRS) Readout Shift Register
Kraków4FutureDaQ Institute of Physics & Nowoczesna Elektronika P.Salabura,A.Misiak,S.Kistryn,R.Tębacz,K.Korcyl & M.Kajetanowicz Discrete event simulations.
KLM Trigger Status Barrel KLM RPC Front-End Brandon Kunkler, Gerard Visser Belle II Trigger and Data Acquistion Workshop January 17, 2012.
Digital Electronics and Computer Interfacing Tim Mewes 5. Computer Interfacing – DAQ cards.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
CERN LECC 2006, September, Valencia, Spain Acknowledgements: Eva Calvo Giraldo, AB/BI Rhodri Jones, AB/BI Greg Kasprowicz, AB/BI Thilo Pauly, ATLAS.
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
BPM stripline acquisition in CLEX Sébastien Vilalte.
Pisa - Apr. 28th, The Trigger System Marco Grassi INFN - Pisa.
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
CLAS12 Central Detector Meeting, Saclay, 3 Dec MVT Read-Out Architecture & MVT / SVT Integration Issues Irakli MANDJAVIDZE.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
The trigger-less readout for the Mu3e experiment Dirk Wiedner On behalf of the Mu3e collaboration 31 March 20161Dirk Wiedner.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
Setup for automated measurements (parametrization) of ASD2 chip
AHCAL Beam Interface (BIF)
Status of the Merlin Readout System
FIT Front End Electronics & Readout
ALCT Production, Cable Tests, and TMB Status
VELO readout On detector electronics Off detector electronics to DAQ
RPC Front End Electronics
RPC Electronics Overall system diagram Current status At detector
ASD-TDC joint test with MDT-CSM
Presentation transcript:

R. Ball September 27 th 2012

 Criteria Re-use existing readout systems where possible High density Build inexpensive adapters to existing systems Save funds for detector work  Multi-channel candidate is from the ATLAS MDT High density Proven usage in ATLAS detector at CERN Data acquisition to computer files readily available Existing analysis programs Overview 9/27/2012 2

 Mezzanine cards 24 input channels each Amplifier/Shaper/Discriminator for signals from detector TDC (AMT-3) to digitize signal timing and amplitude LVDS signaling for output data transmission  Chamber Service Module (CSM-4) Attaches to as many as 18 Mezzanine cards Serial to Parallel conversion of input LVDS signals. Suppression of empty data cycles Time-division multiplexing of 16-bit output data via fiber  Data Acquisition Computers Windows PC for direct control of hardware Linux WS for assembly of fiber data into disk files  Statistics accumulated for data integrity assurance Components 9/27/2012 3

Readout Electronics on an ATLAS MDT Chamber 9/27/2012 4

 Least time count is 0.78ns  80MHz internal and serial output clock to CSM  50MHz 16-bit data stream from CSM to computers  1kHz sustained trigger rate to computer  Input signal amplitude ~150mV Relevant Mezzanine/CSM Data 9/27/2012 5

 Mezzanine cards are designed to plug into ATLAS “Hedgehog” cards.  The HH cards, in turn, plug into the chamber ends  The PPS test detectors come in several varieties “Standard” panels with 0.1” pitch card edges Our own detectors with TBD connections Two connectors chosen, depending on the situation  Standardized on Tyco, 40-pin connectors,  And on Samtec TFML S-D  Ultimately adapted to same Tyco connector  Build PPS Hedgehog card Adapt Tyco connector to Mezzanine connectors Provide resistive attenuation network to match signal size Required Adapter PCBs 9/27/2012 6

PPS Hedgehog Card 9/27/2012 7

 All panels must provide appropriately sized signals to the Mezzanine cards  Pickoff cards (eg, Pikov-4) for work in air Provide resistive attenuation network Provide the Tyco connectors  Prototype panels High density cabling connected via Samtec connector Intermediate adapter cards from Samtec to Tyco Designed to work in vacuum if necessary More Adapter PCBs 9/27/2012 8

Pikov-4 and Pikov-3 Cards 9/27/2012 9

 HEP Experiment quality electronics have been assembled for PPS development work  Minimal expenditures to adapt the hardware for our use.  Highly flexible adapter cards allow examination of a wide variety of situations and resultant signal sizes without adverse impact on the data quality. Summary 9/27/