Www.eia.gov U.S. Energy Information Administration Independent Statistics & Analysis ERUS 2014 ERUS Management Team May 10, 2012 | Washington, DC Power.

Slides:



Advertisements
Similar presentations
Financial Planning 1 Introduction and Budgeting. Learning Objectives Understand the importance of linking planning and budgeting Understand the importance.
Advertisements

U.S. Energy Information Administration Independent Statistics & Analysis 2014 Electricity Forms Re-clearance Vlad Dorjets, Form EIA-860 Project.
Steve Moorman Mgr Business Development, Advanced Technologies Babcock & Wilcox CO2 Emission Reduction from Coal Fired Plants FutureGen 2.0 CO2 Capture.
CPUC CSI Workshop CPUC CSI Stakeholder Workshop San Francisco, CA February 15, 2012.
CAIR & MATS 2012 Southern Sectional AWMA Annual Meeting & Technical Conference September 12, 2012 Chris Goodman, P.E. Environmental Strategy.
Concentrating Solar Deployment Systems (CSDS) A New Model for Estimating U.S. Concentrating Solar Power Market Potential Nate Blair, Walter Short, Mark.
Exam 1 Coverage 1.Planning definitions, goals, horizons, policy developments, categories 2.Economics: expenditures, cost of capital, time value of money,
Meeting with Rep. _______________ Solar Industry Representatives May 5, 2010.
The Economics of Renewable Energy Figures and Tables By Jonathan M. Harris, Brian Roach, and David Timmons Copyright © 2014 Jonathan M. Harris.
Toward a Sustainable Future Name of Conference, Event, or Audience Date Presenter’s Name | ©2011 Synapse Energy Economics Inc. All.
E&CS Overview & Major Construction Update Eddie Clayton.
Recent EPA Regulation Development Presented by Bill Luthans to the 56 th Meeting of the Joint Advisory Committee Meeting for the Improvement of Air Quality.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Regional Emission-free Technology Implementation (RETI): Diversifying the U.S. Electricity Portfolio Marc Santos 2008 ASME WISE Intern University of Massachusetts.
Identification of needed competences Socio-economic development in the era of renewable energies: Towards the creation of a research institution for the.
Buying Electricity and Natural Gas for a BIG User Joan Kowal Energy Manager, UMCP March 6, 2012 Sustainable Tuesdays Speaker Series.
Energy, Society, and the Environment Unit 3 Energy Economics.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
LEVELIZED COST OF ENERGY. Summary Levelized costs are calculated as a proxy for the PPA price between a third-party developer and a utility LCOEs amortize.
Cost and Supply of Geothermal Power Susan Petty Black Mountain Technology.
Wind energy in NZ 20% wind by 2030 Eric Pyle, Chief Executive, NZ Wind Energy Association.
California Energy Commission Crude Oil and Transportation Fuel Price Cases For the 2015 IEPR Joint Lead Commissioner Workshop on Transportation Energy.
U.S. Energy Information Administration Independent Statistics & Analysis Electric Power Data Clearance Power Plant Operations Team:
US Renewable Energy Markets: Financial Perspective By Michael D. Ware Advance Capital Markets, Inc. Washington Council of Governments Washington, DC June.
Rory McIlmoil, Downstream Strategies. Introduction to distributed energy The case for distributed renewable energy Opportunities for developing distributed.
Replacing Coal Fired Power Plants With Solar Roofs NSM6020 Current Topics In Earth and Space Science.
Steve Paulone Facilitator Financial Management Decisions The financial manager is concerned with three primary categories of financial decisions:  1.Capital.
Small Scale Wind Energy. Capacity factor The net capacity factor of a power plant is the ratio of the actual output of a power plant over a period of.
1 Atmospheric Vortex Engine Development and Economic.
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
RES/CHP Support Scheme in Slovenia Conference: Sustainable Energy Development in SE Europe Irena Praček, Director, Energy Agency of the Republic of Slovenia.
Renewable Energy Project Economics, Policy and Incentives NARUC Staff Subcommittee on Accounting and Finance October 8, 2007 Dr. Lola Infante Manager,
U.S. Energy Information Administration Independent Statistics & Analysis ERUS 2014 Bulk Power and Reliability Proposed Changes to Form EIA-411.
15.3 Energy Resources Pg Notebook page 117.
IPM Overview Elliot Lieberman U.S. Environmental Protection Agency Washington, D.C
NW Regional -- Washington n n Washington’s residents, businesses and industries spend $10 billion on their energy costs each year. n n Washington’s long-term.
Opting for “Long Term Operations” Technical, economic and regulatory considerations MARC Conference June 8, 2010 Sean Bushart, EPRI Sr. Program Manager.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
Natural Resource Partners L.P. SMH Capital Investor Growth Conference New York, NY November 8-9, 2007.
Taking the Lead: State Innovations to Reduce Greenhouse Gases Bill Becker STAPPA/ALAPCO February 28, 2002.
1  The IPM model projects increases in electricity prices as a result of the RGGI policy scenarios which, by themselves, would increase the household.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Power Stations Introduction. References  S. W. Blume: Electric Power System Basics  F. Janíček et al.: Renewable Energy Sources.
Energy Resources A natural resource that can be converted by humans into other forms of energy in order to do useful work.
U.S. Energy Information Administration Independent Statistics & Analysis 2014 Electricity Forms Reclearance Vlad Dorjets, Form EIA-860 Project.
HYDROPOWER. Objective: The student will be become familiar with the Corps policy for hydropower development. The student will be have a basic understanding.
U.S. Energy Information Administration Independent Statistics & Analysis Natural Gas Markets: Recent Changes and Key Drivers for LDC Gas Forum.
Richard Newell, SAIS, December 14, The Paul H. Nitze School of Advanced International Studies December 14, 2009 Washington, DC Richard Newell, Administrator.
Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012.
Oregon State Bar Association Environmental & Natural Resources Annual Conference October 8, 2010 Athena M. Kennedy Renewable Energy Law Update 2010.
U.S. Energy Information Administration Independent Statistics & Analysis Key Drivers Affecting the Outlook for Renewables For US Power & Renewable.
Historical Context of Energy Regulation: What is energy? How have humans harnessed energy for their own use? How and why do governments intervene in the.
The Future Electricity Fuels Mix: Key Drivers
1  Power plant costs are key factors in energy market policy decisions Key assumptions in the EIA NEMS model Input factors to all energy economic models.
Energy! Your World and You. Renewable Resources Renewable resources are naturally _________ Some examples of renewable resources are: –________ (sun)
U.S. Energy Information Administration Independent Statistics & Analysis Outlook for coal and electricity for National Coal Council November.
1 Basic Concepts on Power Supply Agreement (PSA) Francis Saturnino C. Juan Executive Director Energy Regulatory Commission.
Proposed Carbon Pollution Standard For New Power Plants Presented by Kevin Culligan Office of Air Quality Planning And Standards Office of Air and Radiation.
HIGH LEVEL FORUM “SECURITY OF ELECTRICITY SUPPLY IN KOSOVO” ENERGY POLICY FRAMEWORK IN KOSOVO LUAN MORINA, HEAD OF DEPARTMENT FOR ENERGY PRISHTINA, MARCH,01,2016.
Renewable Energy Perspective Byard Wood Emeritus Professor Mechanical &Aerospace Engineering RENEWABLE TECH – ECONOMIC & ENVIRNMENTAL VIABILITY Green Futures.
Types of Power. Performance Objectives: Performance Objectives: 1. List the types of power generated from renewable resources. 2. List the types of power.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
Nuclear Energy in 2013: Status and Outlook Paul Genoa Senior Director, Policy Development Nuclear Energy Institute Florida Senate Committee on Communications,
Electricity Basket Price & 2013 Power Policy Hammad Hashmi Advisor Technical (USAID) MWP.
Solar Economics (Assessment and Financing) February 10, 2016.
04/16/ Planning New Generation APPA Operations & Engineering Conference April 10, 2006 Jay Hudson, PE Manager, Environmental Management.
“Other” Cost Estimates
Process Economics Factors that affect profitability
Exam 1 Coverage Planning definitions, goals, horizons, policy developments, categories Economics: expenditures, cost of capital, time value of money, evaluation.
Electric Power Generation: What’s Going On? & What’s New?
Presentation transcript:

U.S. Energy Information Administration Independent Statistics & Analysis ERUS 2014 ERUS Management Team May 10, 2012 | Washington, DC Power Plant Cost Subject Area Review Team: Jim Hewlett, Michael Leff, Nancy Slater Thompson, Carrie Milton, Kevin Lillis, Chris Namovicz Power Plant Costs Subject Area Review Team: Proposals for Data Collection

Overview: The need for power plant cost data Michael Leff and Jim Hewlett, Washington, DC, May 10, Power plant costs are key factors in energy market policy decisions –Key assumptions in the EIA NEMS model –Input factors to all energy economic models used by government, industry, & NGOs –Important considerations for energy market financial analysts, consultants, and academics EIA already collects some power plant related costs –Fuel –Certain environmental control equipment EIA does not collect power plant cost data for –Construction –Operations & maintenance –Major refurbishments, modifications, or upgrades expenditures

Overview: What type of cost data are needed? 3 Consider collecting plant costs at all 3 levels of a plant’s life cycle Plant Construction Plant Operation (non-fuel) Plant Decommissioning Michael Leff and Jim Hewlett, Washington, DC, May 10, 2012

What type of data do we want to collect? Michael Leff and Jim Hewlett, Washington, DC, May 10, Plant Costs Overnight Capital Cost (2010 $/kW) Fixed O&M Cost (2010$/kW) Variable O&M Cost ($/MWh) Coal $2,844$29.67$4.25 Advanced PC Dual Unit Advanced PC with CCS$4,579$63.21$9.05 Single Unit IGCC with CCS$5,348$69.30$8.04 Natural Gas Advanced NGCC$1,003$14.62$3.11 Advanced NGCC with CCS$2,060$30.25$6.45 Conventional CT$974$6.98$14.70 Advanced CT$665$6.70$9.87 Fuel Cells$6,835$350$0.00 Uranium Dual Unit Nuclear$5,335$88.75$2.04 Biomass Biomass BFB$3,860$100.50$5.00 Wind Onshore Wind$2,438$28.07$0.00 Offshore Wind$5,975$53.33$0.00 Solar Solar Thermal$4,692$64.00$0.00 Small Photovoltaic$6,050$26.04$0.00 Large Photovoltaic$4,755$16.70$0.00 Geothermal Geothermal – Dual Flash$5,578$84.27$9.64 Hydro Hydro-electric$3,076$13.44$0.00 Source: Updated Capital Cost Estimates for Electricity Generation Plants

5 Plant Construction Michael Leff and Jim Hewlett, Washington, DC, May 10, 2012

Construction costs: Why is it valuable to collect? Michael Leff and Jim Hewlett, Washington, DC, May 10, EIA –Costs are a key driver for new capacity additions in the NEMS model projections. –The NEMS model uses “overnight” capital costs as an input. This represents the cost of building a power plant independent of time and financing. –The inflated expenditures and financing costs are calculated endogenously in NEMS. Public –Input for other energy models –Of interest to other government entities (e.g., the DOE Office of Nuclear Energy) –Universities

Construction costs: What types of data are available today Michael Leff and Jim Hewlett, Washington, DC, May 10, EIA uses construction costs derived from a 2010 study completed by the engineering consulting firm, RW Beck –The RW Beck study allows EIA to compare construction cost estimates for new technologies across a consistent basis –Construction cost data from actual projects would be very valuable as a means to update and validate the RW Beck estimates Public utility commission filings Other government organizations Industry associations Company reports Press

Construction Costs: What we propose collecting Michael Leff and Jim Hewlett, Washington, DC, May 10, For the large planned power plant projects, EIA wants the costs data broken down in the same manner as is shown in Table 1 in the next slide. This detail is needed to determine the reasons for the differences between extended and realized costs –Direct –Indirect –Owners –Contingency (for estimates only) –Total overnight costs (for estimates only) –Total project cost without financial charges –Total project cost with financing charges Note that for units early in the planning process, in all probability the estimates will be in a form similar to the one shown in the first column in Table 1. –However, once construction of the unit is completed, the data will be in the form shown in the second column in Table 1 Broken down for large projects only

Table 1: An Example of the Estimated and Realized Cost of Building a 2,200 megawatt Nuclear Power Plant from RW Beck Michael Leff and Jim Hewlett, Washington, DC, May 10, Item Number Project CostsEstimated CostRealized Cost 1Direct Cost$5,762,000$8,338,536 2Indirect Cost$2,722,500$3,939,893 3Total$8,484,500$12,278,429 4Owners Cost$1,866,590$2,701,254 5Contingency$1,552,664NA 6Total overnight$11,903,754NA Costs 7 Escalation during construction $3,096,247 NA 8Total project Costs$15,000,000 Without Financing Charges 9Financing Costs$3,000,000 10Total project Costs$18,000,000 including financing costs Note: Estimated costs for items 1 to 6 are in thousands of 2010 $s. All other items are in the dollars of the year the funds were expended.

Construction Costs: Types of projects to be included in the data Michael Leff and Jim Hewlett, Washington, DC, May 10, All units that entered commercial operation as of 2014 All coal and nuclear units under construction as of December 31, 2014 –This will capture the ongoing Vogtle and Summer projects, plus any coal units currently under construction –Short lead time renewable and natural gas plants will be surveyed when they enter commercial operation Estimates for planned nuclear power plants –With the exception of Vogtle and Summer, all of the other recently announced nuclear projects are on hold and are not expected to start construction until the later part of this decade –For the later group, EIA will track estimates for these units as their planning strategies evolve over time. That will aid in projections of unit operational dates. –To keep this process simple, respondents need not report estimates if they have not changed by some reasonable threshold (e.g., 20 percent)

11 Plant Operation (non-fuel) Michael Leff and Jim Hewlett, Washington, DC, May 10, 2012

Operating Costs: What exactly are operating costs Michael Leff and Jim Hewlett, Washington, DC, May 10, Operations & Maintenance. Capital Specific large capital expenditures for individual technologies Why are these so important? –Significant costs, in some cases, can exceed a billion dollars –Aging nuclear fleet and life extensions –Environmental requirements for coal and nuclear

Operating Costs: What data are currently available Michael Leff and Jim Hewlett, Washington, DC, May 10, –The FERC Form 1 Collects financial data from power plants owned by regulated utilities. Does not collect cost data from merchant power plants Operations & maintenance costs reported annually Capital additions are estimated by tracking the year by year changes in capacity –FERC Form 1 limitations FERC does not require utilities operating in states with retail competition to file Form 1 –Approximately 50 percent of the units in operation are not covered General and administrative expenses reported by utilities are not allocated to the plant level –These represent percent of O&M costs Expensing versus capitalizing costs No accounting for major capital projects No breakdown of fixed and variable costs –.

Operating Costs: What information do we want Michael Leff and Jim Hewlett, Washington, DC, May 10, The operations and maintenance costs for power plants currently operating Capital expenditures for power plants currently operating Specific large capital expenditures for individual technologies –Nuclear Power uprates Life extension programs Steam generator replacement Cooling towers –Coal Pollution control equipment Cooling towers –Renewables Technology specific, for example blade/gear box replacement (wind), drilling costs (geothermal), inverter replacement (solar), turbine replacement (hydro)

Operating Costs: What are we proposing? Michael Leff and Jim Hewlett, Washington, DC, May 10, EIA collect non-fuel operations and maintenance costs and capital expenditures from all power plants in the U.S. in a new cost schedule that would be part of the EIA form 923 EIA collect the costs of large capital projects that drive capacity planning decisions Nuclear – Power uprates, life extension programs, steam generator replacements, and cooling towers Coal – FGD scrubbers, fabric filters, selective catalytic converters, dry sorbent injection systems, electrostatic precipitators, cooling towers Hydro – Power uprates, life extension, major equipment replacement Exact definitions of O&M & capital expenditures will be defined with input arising the stakeholder process All new cost data collected would be treated as confidential

Operating Costs: What do we already collect? How would we revise these fields? Michael Leff and Jim Hewlett, Washington, DC, May 10, Pollution control capital costs (Form 860 Schedule 6, Part G & H) –Requires the installed cost of existing and anticipated FGD and FGP unit costs be reported –These fields would be moved to a new cost schedule on the Form 923 as a major plant capital expense –Definitions revised to fit EIA’s definitions of major capital expenditures for coal units Pollution control equipment O&M Costs (Form 923 Schedule 8, Part B) –Requires O&M and capital expenditures for combustion byproducts from coal plants –EIA proposes replacing these O&M costs with general costs from each technology. For coal plants, EIA would collected both fixed and variable O&M costs These costs would be collected on the new cost schedule of the Form 923 For most coal plants, variable costs are associated with environmental control equipment & waste production. This would capture a summary of what is being lost by aggregating the information already collected

17 Plant Decommissioning Michael Leff and Jim Hewlett, Washington, DC, May 10, 2012

Decommissioning Costs: Michael Leff and Jim Hewlett, Washington, DC, May 10, Costs associated with taking a unit out of service Potentially most significant for nuclear plants Information already collected at the PUC level and by the NRC NEMS model is relatively insensitive to changes in nuclear decommissioning costs EIA recommends not collecting these costs for this survey cycle. If need be, these costs can be collected directly from the PUCs

Summary 19 Plant Construction Plant Operation (non-fuel) Plant Decommissioning Michael Leff and Jim Hewlett, Washington, DC, May 10, 2012