M. Scharfenstein - ES&H Coordinator 8 June 2009

Slides:



Advertisements
Similar presentations
(Project Name) Site Safety Orientation. Family of Companies.
Advertisements

Program Management Office (PMO) Design
Gulf Petrochemical Industries Co. Turnaround Contractors – Ensuring the safety of our Manpower GPIC Bader Al-Mansoori Planning Superintendent.
Job Loss Analysis Overview
Richard Hislop Construction April 7, CONSTRUCTION SAFETY Richard Hislop.
MOL GROUP CONTRACTOR HSE MANAGEMENT New Elements of Contractor Safety BÉLA CSEH – MOL Group HSE Director Supplier Forum - Budapest, 14 th November 2007.
Contractor Safety Management
Contractor Management and ISO 14001:2004
Jess Albino Session 5 Conventional November 11, Facility Advisory Committee LINAC Coherent Light Source Project.
Michael Scharfenstein FAC June 17, ES&H Status of Construction and Technical System Installations Michael Scharfenstein.
David Saenz Facility Advisory October 30, 2007 CONVENTIONAL FACILITES MANAGEMENT.
Richard Hislop FAC April 20-21, 2006 CONSTRUCTION SAFETY Richard Hislop LCLS Construction Safety Coordinator.
1 Michael Scharfenstein 1 Environment, Safety and Health CXI Final Instrument Design Review, June Mike Scharfenstein ES&H.
Michael Scharfenstein FAC October LCLS Environment, Safety & Health Michael Scharfenstein ES&H Coordinator.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
1 Jess Albino 1 Conventional Facilities Status FAC Review – Breakout Session CONVENTIONAL FACILITIES STATUS Jess Albino – Associate.
Jess Albino Facility Advisory October 30, 2007 FACILITY ADVISORY COMMITTEE BREAKOUT SESSION 5 TURNER CONTRACT OVERVIEW.
Michael Scharfenstein FAC April 7, 2005 LCLS ES&H Process and Documentation.
Mike Scharfenstein FAC Review - November 11, 2008 SLAC National Accelerator Laboratory 1 Environment Safety & Health Status.
Michael Scharfenstein FAC April 16, 2007 LCLS CONSTRUCTION SAFETY Michael Scharfenstein.
Michael Scharfenstein FAC October 30, LCLS CONSTRUCTION SAFETY Michael Scharfenstein.
Mike Scharfenstein CF Breakout - 12 November 2008 SLAC National Accelerator Laboratory 1 ES&H Status of Construction and Technical.
M. Scharfenstein FAC April 20-21, PROJECT SAFETY Michael Scharfenstein LCLS ES&H Coordinator.
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Mr. Bill Garrett C.S.P. NAVFAC Atlantic Safety Program Manager Creating Awareness for NAVFAC Safety Program Innovations with Contractor Partners 1.
Richard Hislop FAC October Construction Safety Richard Hislop.
David McGiven FAC: Construction April 2006 Facility Advisory Committee (FAC) Construction Procurement David.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
WORKPLACE HAZARD MANAGEMENT PLATFORM UPGRADE KEY ELEMENTS IDENTIFY PLAN AND DOCUMENT COMMUNICATEMANAGEMONITOR.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
FHWA Perspective on Risk and Other Highlights. GROW AMERICA Proposal Administration’s Proposal 6 Years in length $317 billion for highways and bridges.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
Environmental Restoration Projects Methods for Safety Culture Realization November 30, 2007.
Health and Safety Policy
Javier A. Sevilla Interface & Configuration FAC Review October 12, Interface and Configuration Management Outline.
SacProNet An Overview of Project Management Techniques.
Elements of Effective Behavior Based Safety Programs
Hazards Identification and Risk Assessment
Construction Safety at the UW Ron Fouty, Safety Director Capital Projects Office University of Washington.
ISM Annual Review and Declaration Lessons Learned CH2M HILL Hanford Group John McDonald.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
ISO Current status of development ​ ​ ISO development process ​1​1.
1 ISO/PC 283/N 197 ISO Current status of development November 2015.
MTA New York City Transit 2011 Safety Initiatives Transit Riders Council Meeting December 22, 2011.
HSE Plan meeting - November – Health, Safety & Environmental Plan 2015.
U N C L A S S I F I E D Operated by the Los Alamos National Security, LLC for the DOE/NNSA Improvement of Integrated Work Management and ISM Presented.
Monitoring the Long-Term Effectiveness of Integrated Safety Management System (ISMS) Implementation Through Use of a Performance Dash Board Process Mike.
OSHA Safety and Health Program Management Guidelines
Mike Scharfenstein LUSI DOE Review August 19, 2008 ES&H Overview p. 1 LCLS Ultrafast Science Instruments (LUSI) M. Scharfenstein.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
OHSAS Occupational health and safety management system.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
LCLS-II ES&H Requirements: Subcontractors
Safety Accountabilities
Program Review June 2004 Good Morning
Meeting of the LCLS Facilities Advisory Committee
Breakout Session Summary Construction
CONVENTIONAL FACILITIES STATUS
M. Scharfenstein - ES&H Coordinator 14 May 2009
Ian Evans SSRL Safety Office
Project Status Review May 13-15, 2008.
Integrated Safety and Environmental Management
Michael Scharfenstein Project ES&H Coordinator
Environment, Safety and Health
CONVENTIONAL FACILITIES
Installation Status & Operational Readiness Process
Richard Hislop Construction Safety Coordinator
DOE Review of the LCLS Project October 2006
Department Of Energy Review Linac Coherent Light Source Project
PROJECT SAFETY Richard Hislop.
Presentation transcript:

M. Scharfenstein - ES&H Coordinator 8 June 2009 Construction Safety M. Scharfenstein - ES&H Coordinator 8 June 2009

Project ISM Process & Implementation Civil Construction Technical Systems Installations Lab shops, subcontractors and collaborators Commissioning w/ transition to Operations = ARR’s Safety Assessment Document Accelerator Safety Envelope Experience Overall and detail statistics Construction and Installation experience Lessons Learned Direct subcontractor management Detailed work planning Previous Review Recommendations Discussion of overall Project ISM, including ARR’s and preparations for Users. Talk will focus on civil construction. The GC managed work has resulted in recordable injuries (TRCs) that have for the most part become DARTs. This is where our cause of concern lies and will be discussed in this presentation. On a positive note all CF and Technical Systems managed work has been performed w/o injury. Yes, there have been issues – but when immediately addressed positive outcome is achieved. We are working diligently to preserve this record.

Project-specific ISEMS Implementation SLAC Integrated Safety Management Plan SLAC Work Planning and Control Formerly LCLS Work Authorization Procedure Scope / Hazard & Control documentation / Authorization & Release SLAC ES&H Manual Formerly LCLS Project ES&H Plan GC/sub Site Specific Safety Plan Job Safety Analysis Daily Tailgate Safety Meetings PM/UTR manages each subcontract CF-5 / Continuous Improvement / Lessons Learned Management Walkthrough Process Formerly LCLS Safe Performance Observation Process Focused walkthru to note & promote safe behavior ISMS Plan provides overarching direction with regard to safety expectations. Work Authorization Procedure – Provides specific direction regarding work planning PO driven / similar to other Lab processes Goal is to ensure that CF1 thru CF5 incorporated into work planning LCLS Project ES&H Plan Sub produces site safety plan which we review to assure they recognize the hazards (CF1 & 2) JSA & Tailgate are further refinements of the analysis process (CF3 & 4) PM/UTRs monitor the entire process (CF4 & 5) TCCo Supposed to follow the same management model used by LCLS

PROJECT SAFETY EXPERIENCE Through April 2009 DART Rate Total Project Hours 2.19 M Hours worked DART Rate 1.03 SubContractors 599 K Hours worked DART Rate 3.01 (9 Incidents) TRC Rate 4.01 (3 Incidents) LCLS Collaboration 1,589 K Hours worked DART Rate 0.25 (2 Incidents) Injury rates based on 200 K hours (100 man years) of effort. DOE/SC Goal is a Reportable Case (TRC) rate of < 0.25 and a Days Away, Restricted, or Transferred (DART) rate < 0.65 per 100 FTEs.

CF & Technical Systems Stewardship Excellent Safety Record 120K+ hours w/o injury (TRC or DART) S20, MMF, Injector, Linac TSI, S522, LTU Project Managers / UTRs / Installation Managers Direct management of subcontractors Communicate ES&H Expectations Guide them to success Enforcement when needed Thorough Work Planning and Control Aggressive ISM management Issues identified and addressed immediately Positive Results Ownership of safety Our challenge to ourselves is to maintain Zero!

CF CMGC Stewardship October ’06 thru April ’07 Ramp Up to Full Production : Procedural Violations Stand Down of Construction Activities : All Hands Meeting Review of Work Planning Process for field work – JSA process inadequate PMT changes Deficiency Notices May ’07 thru November ’07 Full Production : DARTs Multi-day Stand Down of Construction Activities : Corrective Action Plan Paperwork ineffectively utilized by CM/GC and trade contractors Deficiency Notices & Fines Communication with Corporate TCCo Safety Stewardship Committee Established Full time on-site medic (+30hr OSHA) UTRs added December ’07 thru April ’08 : Some progress, then… Two DARTs associated with one sub PM removed Work stopped May ’08 thru December ’08 : No DARTs Effective work planning & execution sought Plan for joint observation developed Attendance at daily morning work planning meetings JSA review with workers throughout the day Identification / monitoring of specific trades or tasks for safe work practices Must communicate with the worker

Lessons Learned CM/GC and/or subcontractor selection criteria Assessment of EMR and competencies of the PMT DOE Environment Help the contractor understand how OSHA is enforced A CM/GC must closely monitor subcontractor means and methods Project Safety Standards Clearly define standards that will apply Contract clause re most recent standard rev Initial Work Execution Evaluation Initial work packages are owner reviewed and executed with owner ‘participation’ Partnering and committees Partnering process at onset of project Safety Stewardship Conflict Resolution Forum

Previous Review Recommendations Continue to support Turner with LCLS resources to reduce the risk of additional safety violations and personnel injuries through the completion of the Turner construction scope. Done – 270 days w/o DART, 184 days w/o TRC LCLS should take the lead in establishing the safety culture the Laboratory Director has targeted for the Laboratory as a whole. Done – Developed Construction ES&H Plan, Work Planning & Control Process, Management Walkthrough Process SLAC safety violations identified during LCLS reviews should be addressed and promptly corrected whether specific to the LCLS project, or SLAC generic. Done – Three specific issues and process in general Track and report the precursors to lost time injuries in order to take corrective actions in time to prevent them. DART statistics are not sufficient if zero lost time injuries is the goal, and it is. Done – had been happening all along project but not communicated The DOE Lessons Learned database should be utilized as a tool to improve JSA preparation. Further, do not underestimate the time required to prepare safety related documentation and the time it takes for the approval process. Agreed, still a challenge

Integrated Safety and Environmental Management Conclusion Integrated Safety and Environmental Management Following SLAC ISEMS Process SLAC ES&H Manual Work Planning and Control Following LCLS ES&H management practices LCLS Requirement, Specification and Interface Documents Reviews, Authorizations, Continuous Improvement Experience and Lessons Learned Understanding the National Laboratory Environment Partnering for Success Recommendations valued & all adopted…almost Reversing the order from slide 2 Goal is Zero!