Lesson 8 Offshore Drilling

Slides:



Advertisements
Similar presentations
Dual Casing Running for deep water spud in
Advertisements

Well Design PE 413 Surface Equipments and Placement Techniques
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Comparison between the Characteristics of Jack-Up and Semi-Submersible Rigs Welaya, Y. M. and Elhewy, A. H. Department of Naval Architecture and Marine.
The first floating wind turbines Martin Jakubowski Technology Architect Blue H Technologies BV, The Netherlands Brindisi, Italia 23rd of May
PETE 411 Well Drilling Lesson 17 Casing Design.
Chapter 3 Casing design.
Present Procedure for cutting stuck casing on Drilling PLATFORM
Marine Construction SCM 330 Tyler Mason Pratt Tyler Mason Pratt
Petroleum Engineering 406
Trouble in the Gulf Deepwater Horizon
2012 AAPL ANNUAL MEETING SPONSORS PLATINUM GOLD SILVER SAN FRANCISCO SEMINAR GOLF A wholly owned subsidiary of ExxonMobil BRONZE.
PETROLEUM ENGINEERING 411
GEOTHERMAL DRILLING James C. Witcher Witcher and Associates
Removing 36 hours from a workover Optimising rig time using LWIV & eRED technology Presented by: Andy Skinner Date: 9 th March 2011 Slide 1.
OFFSHORE MISHAPS AND ACCIDENTS
BASIC MUD LOGGING.
ISO Wellhead Integrity
PART SIX Systems Model and Offshore Oil Offshore Oil: Decision to Recover The determination must be made whether cost of inputs and processing will be.
Chapter I. Introduction. Naval Architecture: the science and engineering of designing ships and other kinds of waterborne crafts. Kinds of ships Sub systems.
Unit 4: Primary Resources Energy from the Oceans.
Offshore Oil Formation The formation of oil takes a tremendously long time. Millions of years ago plants and animals of the oceans died & settled on the.
SHELL ALASKA Program Update March 2015.
QUALITY ENERGY SERVICES Liftboat & Marine Services Your Well Productivity is Our Priority Global Lift 2.
Unit 3: Natural Resources Oil and Gas Canadian Geography 1202.
Confidential to SMD JIP
Lesson 30 Cementing - cont’d
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
Trouble in the Gulf Deepwater Horizon
Deepwater drilling challenges Gm, Drilling – murphy malaysia
Offshore Drilling Operations Jeff Bugden Canada-Newfoundland Offshore Petroleum Board.
Canadian Geography 1202 Chapter 11: Energy. Background ► Canadians are among the highest energy consumers in the world. ► Why is this so?  Cold Climate.
DRILLING.
Drilling Efficiency Veritas Associates, Inc For Conoco Indonesia By Paul Baumgardner.
Offshore Natural Resource Extraction. Overview History History Exploration Exploration  Seismic surveys  Drill ships Platform models Platform models.
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
Lesson 6 Drilling Structures
Risk in Well Plugging & Abandonment by Twachtman Snyder & Byrd, Inc
Petroleum Engineering 406 Lesson 9b Station Keeping.
Topic 2 Off-shore Oil Sedimentary Basins of Canada (Locations of Oil and Gas) 1. Western Canada Sedimentary Basin 2.Hudson Bay Basin 3. Mackenzie and.
Systems Model and Offshore Oil Offshore Oil: Decision to Recover The determination must be made whether cost of inputs and processing will be offset.
Ship Types II Special Purpose Carriers Passenger Ships.
Petroleum Engineering 406 Floating Drilling
TMR4225 MARINE OPERATIONS SPRING 2007 Introduction.
PHASE 7 FACILITIES ENGINEERING
Confidential to Subsea Mudlift Drilling JIP11/6/00DGD Template 1 of 64 Dual Gradient Drilling Basic Technology Lesson 1 Introduction to DGD Jerome J. Schubert.
Protective Coatings Specified for the Upstream and Downstream of the Oil and Gas Industry Presented by: Kristin Leonard, Bechtel.
Petroleum Engineering 411 Well Drilling
Lecture 6 Well Drilling Fall Drilling can be at Every Corner of the Earth!
Introduction to Well Completions
Mike Winstanley Sales Director Bowtech Products Ltd A brief overview of Bowtech Products and areas of activity New Technologies released Visual Monitoring.
oil Housing Drilling Floor Derrick Conductor 30” (or 36”) (Jet Cleaning.
IMPROVED SEABED ANCHORING TECHNOLOGY Innovation Opportunity Identified at PROTTEC Retreat 26/28 October 2010 Jonathan Williams, Marine South East.
OIL WELL DRILLING GUIDED BY Miss. SUMA K Lecturer PRESENTED BY SHALIN P M NO : 48 S7 CHEMICAL.
Chapter 6.  Moveable rigs include drilling barges, drill ships, jack-up rigs, and semisubmersible rigs.  Offshore rigs use a device called a top drive,
The SPE Foundation through member donations
Cementing How it is Done
SUSTAINABLE DRILLING OF OIL & GAS WELLS
OFFSHORE CONSTRUCTION
Petro Data Mgt II- Drilling and Production
Systems Model and Offshore Oil
Scope / History Well 25/11-G-18 was drilled nov The well has 7” Bakerweld 140 Screens and swell packers. The well is producing gas from the “heal”
By George Shard & Ray Pickens
Petro Data Mgt II- Drilling and Production
Harbors and Ports Engineering Geology – CE31FB2.
Index Line – the only accurate measuring technique
Lesson 6C - Motion Compensation
Parts Wellhead All casing strings, except for liners, are suspended from a wellhead. On a land well or offshore platform the wellhead is just below.
Unit 4 Primary Resource Activities
Petro Data Mgt III- Facilities
Presentation transcript:

Lesson 8 Offshore Drilling PETE 406 Lesson 8 Offshore Drilling

Content Inland barges (submersible) Jackup rigs Platform rigs Wildcats Shallow water templates Cantilevered over platform Platform rigs Floaters - semi’s and drillships

Inland barge Used in swamps, bays, inland water, shallow offshore. Floated and towed to location On location these rigs are submerged Well is drilled Personnel and supplies are brought in by boat.

Noble Drilling’s Cecil Forbes A Jack-Up Rig Jackup rigs Noble Drilling’s Cecil Forbes A Jack-Up Rig

Jackup rigs Independent legs or mat supported Some are self propelled to location, but most moved by tugs On location survey boat surveys location

Jackup rigs Legs jacked down to sea floor Hull picked up above water Rig “pre-loaded” Seawater pumped out Jacked up to working “air gap” Well drilled

Jackup rigs Used for both wildcat and development Shallow water up to 350-400’ WD Derrick may be fixed or cantilevered

Platform rigs Tendered

Platform Rig Self contained

Platform Rig Operations similar to land except: Limited storage space Crew lives on location Cementing operations simpler

Floating rigs Semi-submersible Drill ships

Sonat’s George Washington A Semi-Submersible Rig

Zapata’s Trader A Drillship

Semi-submersible Marine Riser Subsea BOP stack

Drilling from Floating Vessel Rig move Hole opener pulled from storage and prepared for use Structural casing is measured and brought on deck Inspect and test riser and BOP system

Drilling from Floating Vessel Water depth at new location verified Tide tables obtained Choke manifold inspected and tested Site surveyed and marked with buoys

Drilling from Floating Vessel Anchor boats on location Heading adjusted and anchor setting begins

Drilling from Floating Vessel

Drilling from Floating Vessel Anchor lines tensioned

Drilling from Floating Vessel Well prepared for spudding Temporary guide base (A) set 36” Structural hole drilled to 80’ to 200’ BML 30” Structural casing (B) run and cemented with permanent guide base (C) attached C B A

k 26” Conductor hole drilled to approx. 1000’ BML Can be drilled with or without riser 20” conductor casing run and cemented. k

lling Wellhead installed with conductor casing

While WOC riser and stack are N/U and latched onto the wellhead Control pods

Surface hole drilled to 3000’ to 5000’ BML Surface casing is run and cemented through riser and BOP’s

Floating Drilling Float collar drilled out and casing tested Float shoe drilled out and 5’ to 15 feet of new formation drilled Hole is circulated and conditioned Casing seat is tested

Intermediate hole drilled to just above target zone and logged Intermediate casing set, cemented and tested Intermediate casing drilled out Hole circulated and conditioned Casing seat tested

Production hole drilled to TD and logged Production casing or liner run and cemented Well completed and tested

Floating Drilling After testing, hole prepared for abandonment P&A, PNA TA, T&A, TNA Perfs squeezed, and cement plugs set according to regulatore rules and regulations

Floating Drilling Riser and BOP retreived Casing cut approx. 10’ BML if PNA Temporary and permanent guide base retrieved Anchors pulled Vessel under way to next location