TE-MPE-TM 02/08/2012, TE-MPE-MS section RENOVATION OF SPS MAGNET INTERLOCK SYSTEM 1 CURRENT SITUATION CONSOLIDATION PROPOSALS Y.Bastian, P.Dahlen, R.Mompo,

Slides:



Advertisements
Similar presentations
André Augustinus 16 June 2003 DCS Workshop Safety.
Advertisements

PLC DEVELOPMENTS FOR NEW VACUUM DEVICES IN THE LHC AND NA62
FUNDAÇÃO PARA A CIÊNCIA E TECNOLOGIA FCT Trainee Program Follow Up João Rodrigo Alvelos Ferreira | Started March 2013 October 2014 TE-VSC-ICM.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
UNICOS-like system for interlocks II Workshop on PLC-based interlocks systems ITER, Dec 2014 Jeronimo ORTOLA VIDAL CERN Engineering Department, Industrial.
Consolidation program SPS Main Power Converters (Dipole & Quadrupole) K. Kahle / Q. King / G. Le Godec (TE-EPC) IEFC Workshop, 9 March 2012.
CERN Ivan Romera MPE-Technical meeting Status on CERN-ITER collaboration for Machine Protection Acknowledgments: J.Burdalo, R.Schmidt, S.Wagner, M.Zaera.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
TE-MPE-TM 09/08/2012, TE-MPE-MS section WIC: Overview of on-going projects + Outlook to LS1 activities: - Short introduction to WIC systems - Booster renovation.
Software Evolution Planning CIS 376 Bruce R. Maxim UM-Dearborn.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Ethernet IP solution for ATLAS IBL and CMS Pixel detectors CO 2 cooling plants Lukasz Zwalinski PH/DT/DI.
Safe-Room Status Intermediate ‘Conclusions’ M. Brugger (based on HSE discussion)
Interlock System Equipments for Conventional Magnets PP a-ABT_interlock conv mag.ppt October 22, 2015 Anthony Beaumont Interlock System Equipments.
Workshop on the Use of Ethernet as a Fieldbus CERN, 28 September 2001 Use of Ethernet in the control systems of the cooling and ventilation infrastructure.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
SPS RESTARTING AFTER LS1 05/03/2015 Stéphane Cettour Cavé.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
Vacuum Control System AdV architecture similar to the existing one one autonomous station per “pumping unit” (about 30 units : tower, tube station, cryopumps.
ALICE-TRD gas system 1/4/2015R. Guida PH-DT-DI1. TRD gas system Few numbers:  Total number of modules/racks: 20 (max leak rate certified at construction.
Chiller control system Lukasz Zwalinski – PH/DT.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
BA6 Cooling Towers Test Day Process Control Functionality and Performance Tests TCR – PCR Monitoring.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
MS Activities during TS#3 Courtesy of JC, Kajetan, Arek, Jacek, Yan, Richard and Pierre.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
60kW Thermosiphon control system
Electronics issues for MTE Etienne CARLIER TE/ABT Outline: o CAMAC eradication o PPM limitations o Electronics & Controls for MTE only CT only CT-MTE hybrid.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
TE-MPE- Post LS1 Review: 02 & 03/06/2015, Richard Mompo Upgrade, IST and Powering tests of the WIC systems Richard Mompo for the WIC team 1.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
TE-CRG Interfaces Fair S-FRS magnets - CERN cryogenics Control interface CERN-GSI for B.180 cryogenics Control interface CERN-GSI for B.180 cryogenics.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January ARCON – RAMSES Bridge ATC/ABOC Days CERN – 21 to 23.
TE-MPE-TM 27/06/2012, TE-MPE-MS section SPS RENOVATION Final design and status 1 R.Mompo, P.Dahlen, Y.Bastian, I.Romera, M.Zerlauth.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
B.Puccio MPE Workshop for LS1 / 22 & 23 Nov Logistics for DYPB activities Bruno PUCCIO (TE/MPE)
LHC Cryogenics Schneider PLCs: Radiation tests at H4IRRAD Mitigation measures M. Calviani, M. Brugger, G. Spiezia (EN/STI) E. Blanco, J.M. Beckers, D.
LS1 Mid-Point Status Report of the PSB Low Level RF, Transverse Feedback & High Level RF. Autumn 2013 A. Akroh, M.E. Angoletta, A. Blas, L. Arnaudon, A.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
Status And Plans For Consolidation Of Magnet Protection Systems And Interlocks TE-MPE A. Siemko 12/09/2013 Accelerator Consolidation Workshop2.
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
PLCs at CERN for machine protection and access interlocks Session: Machine Protection and interlock systems at different labs I. Romera Ramírez (CERN /
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
Miguel Angel Quero Corrales
CONS and HL-LHC day Analysis of needs from BE-CO
TE-MSC activities in SPS during LS2
The HL-LHC Circuits: Global View and Open Questions
PLC-based control systems at SOLEIL - ICALEPCS 2017
Injectors BLM system: PS Ring installation at EYETS
Collimator Control (SEUs & R2E Outlook)
Yannick Dietrich François Bouvet SOLEIL
Interlocking of CNGS (and other high intensity beams) at the SPS
Safety, reliability and maintainability
SPS Injection BIS - Draft requirements
Presentation transcript:

TE-MPE-TM 02/08/2012, TE-MPE-MS section RENOVATION OF SPS MAGNET INTERLOCK SYSTEM 1 CURRENT SITUATION CONSOLIDATION PROPOSALS Y.Bastian, P.Dahlen, R.Mompo, I.Romera, M.Zerlauth

TE-MPE-TM 02/08/2012, TE-MPE-MS section SPS LAYOUT and Magnet Powering SPS composed of 6 sextants Main dipole and quad magnets powered in series per (demi-) sextant, power converter located in respective BA Auxiliary (corrector) magnets powered individually from respective BA Ring-line magnets (octupoles, sextupoles) powered in series in whole SPS ring from BB3 Current interlock system built in 1974 (mains)  1980 (Aux)

TE-MPE-TM 02/08/2012, TE-MPE-MS section 3 Main Dipole and Quadrupole Magnets (1123 in whole ring) Ring-Line Magnet (232 in whole ring) Auxiliary Magnet (290 in Total) SPS MAGNET POWERING

TE-MPE-TM 02/08/2012, TE-MPE-MS section SPS MAGNET INTERLOCK SYSTEM Each magnet has an interlock box to collect signals from thermo-switches and for visual indication («trefle»)

TE-MPE-TM 02/08/2012, TE-MPE-MS section SPS MAGNET INTERLOCK SYSTEM - MAINS 1 interlock crate per BA 2 interlock cards, 1 for main dipole, 1 for QF/QD Signals for dipoles and quadrupole chains are treated by demi-sextant (up to 60 magnets in series) No spare crate for SPS main interlocks! 1 single spare card (obsolete relay types!)

TE-MPE-TM 02/08/2012, TE-MPE-MS section SPS MAGNET INTERLOCK SYSTEM – AUXILIARY MAGNETS

TE-MPE-TM 02/08/2012, TE-MPE-MS section SPS MAGNET INTERLOCK SYSTEM – AUXILIARY MAGNETS 1 interlock crate per BA 4-5 interlock cards/crate, each managing up to 3 auxiliary magnets Individual powering of auxiliary magnets (1 magnet – 1 power converter) Sufficient spare crates and spare cards available

TE-MPE-TM 02/08/2012, TE-MPE-MS section SPS MAGNET INTERLOCK SYSTEM – RING LINE MAGNETS

TE-MPE-TM 02/08/2012, TE-MPE-MS section SPS MAGNET INTERLOCK SYSTEM – RING LINE MAGNETS Single crate located in BB3 4 magnet families connected in series in whole ring, powered by converters in BB3 (focusing/defocusing sextupoles, octupoles and skew correctors) Sufficient spare crates and spare cards available Sophisticated reflectometry measurement to determine fault location (more or less precisely…) Considerable impedance in ring line, impacting threshold determination for interlock Issue with tighter thermal limits (see next slide) + ageing thermo-switches

TE-MPE-TM 02/08/2012, TE-MPE-MS section Main magnets: dipoles & quadrupoles -Only problems encountered appear during the restart of the SPS due to water valves which had been forgotten to be opened. Auxiliary magnets: -Very stable as well, 2-3 interlock modules were replaced due to electro- mechanical failures (in the shadow of normal operation). Ring-Line magnets: -Due to continuous optimization of SPS performance, corrector strengths pushed close to the limits -> More overheating of magnets -Last problem needed 16 hours of downtime due to increase of impedance of some thermo-switches (radiation and age). Other aspects to take into account: -Very time demanding re-commissioning -It can take 2 weeks for 2 people to test all interlock signals OPERATIONAL EXPERIENCE DURING PAST 10 YEARS

TE-MPE-TM 02/08/2012, TE-MPE-MS section 2012 CONSOLIDATION 11 New spare cards and racks for main magnet interlocks have been built (fully compatible with existing HW) to assure operation until LS1 (and beyond?) Lab tests completed, awaiting final validation in situ (during next TS) 8 cards are ready 2 racks available in stock

TE-MPE-TM 02/08/2012, TE-MPE-MS section Renovation of SPS magnet interlocks In long term a renovation/alignment to standard interlock system probably inevitable (adding diagnostics, archiving, …) The current (electromechanic) system works (very) well, but is very tricky to debug in case of more complex failures Ring line + magnet interlock boxes (+ trefle) are the major source of worries What are our technical options for a renovation…? To renovate or not to renovate?!

TE-MPE-TM 02/08/2012, TE-MPE-MS section PROPOSALS FOR RENOVATION OPTION #1 : Do nothing and rely on ongoing consolidation  Estimated cost : negligible  Ressources : negligible  PRO: The system works well according to SPS OP, no ressource conflict with other MS renovation projects in LS1  CON: Risk of major problem and lengthy repair, resulting in costly LHC downtime

TE-MPE-TM 02/08/2012, TE-MPE-MS section OPTION #2 : Replacement of existing electromechanic chassis with Standard safety PLCs and boolean I/Os in each BA  Estimated cost : 30kCHF / BA = 180kCHF  Ressources: ~ 0.5 FTE from MS, 3 weeks from EN-ICE (SCADA + PLC)  PRO: Simple, standard WIC solution (safety), no change of cabling in SPS tunnel, diagnostic per demi-sextant (apart from ring-line)  CON: Ring-line remains, no precise localization of fault, no easy solution to replace ‘reflectometry’ for fault finding, no remote test PROPOSALS FOR RENOVATION

TE-MPE-TM 02/08/2012, TE-MPE-MS section OPTION #3 : Idem as #2 + for the ringline: 2 cables pulled around the SPS to split ring-lines and collect information by (demi) sextant in PLC installed in BB3  Estimated cost : Idem as #2 + ~ 115kCHF for additional cables + patches = 300kCHF  Ressources : ~0.75 FTE from MS, 3 weeks from EN-ICE (SCADA + PLC)  PRO: Simple, standard WIC solution (safety), no change of cabling in SPS tunnel, diagnostic per sextant, no need for reflectometry  CON: No precise localization of fault, no remote test, more costly, additional HW patches in tunnel PROPOSALS FOR RENOVATION

TE-MPE-TM 02/08/2012, TE-MPE-MS section OPTION #4 : Idem as #2 but split ringline in sextants, with conventional cables bringing the ring lines to the PLC in each BA + PLC-PLC communication with BB3 for auxiliaries  Estimated cost : Idem to #2 + ~ 110 kCHF for cables between tunnel/BAs = 300kCHF  Ressources : ~0.75 FTE from MS, 3 weeks from EN-ICE (SCADA + PLC)  PRO: Simple, standard WIC solution (safety), small (but feasible) change of cabling in SPS tunnel, diagnostic per sextant, no need for reflectometry  CON: No precise localization of fault, no remote test, somewhat more costly, new special part of PLC program for PLC-PLC comm PROPOSALS FOR RENOVATION

TE-MPE-TM 02/08/2012, TE-MPE-MS section OPTION #5 : Replacement of existing chassis with PLCs and analogue I/Os (more complex SW implementation as non standard, maintain cabling, remove trefle, diagnostic for each magnet, no remote test...)  Estimated cost : slightly more expensive to # 2+ ~110kCHF for cables between tunel/BAs + new magnet boxes = 400kCHF  Ressources : ~1.5 FTE from MS, 4 months from EN-ICE (SCADA + PLC)  PRO: Safety implementation possible, diagnostic per magnet (no need for reflectometry), on-line surveillance of impedance in each line, no need for ‘trefle’  CON: Non-standard WIC solution (both HW and SW), need new magnet interlock boxes (unique!), no remote test, more costly, long-term stability? PROPOSALS FOR RENOVATION

TE-MPE-TM 02/08/2012, TE-MPE-MS section Power supply 24VDC CPU Ethernet interface Analog inputs Resistors instead of «trefle» PROPOSALS FOR RENOVATION

TE-MPE-TM 02/08/2012, TE-MPE-MS section OPTION #6 : Remote I/Os with Profibus link (complex cabling) Constraints for decision: Radiation levels + validation time for remote I/Os + repeaters, cabling costs, cabling restrictions imposed by EN/EL  Estimated cost : Idem as # 2 + remote I/Os ~ >800kCHF for tunnel cabling = Total 1.2 MCHF  Ressources : ~2 FTE from MS, 3 weeks from EN-ICE (SCADA + PLC)  PRO: The full Monty (remote test, diagnostic per magnet, …)  CON: Huge investment, considerable re-cabling, radiation constraints,… PROPOSALS FOR RENOVATION

TE-MPE-TM 02/08/2012, TE-MPE-MS section PROPOSALS FOR RENOVATION

TE-MPE-TM 02/08/2012, TE-MPE-MS section Potentiel «Rad-Tol» Profibus DP slave modules? We know that SIEMENS hardware does not cope very well with radiation! Digital I/O modules (“Profi-XXXX” series) from ICP DAS were identified as potential candidates to be «Rad-Tol» due to their simple design & architecture! It is based on a «VPCSL2» ASIC ship that provide a complete PROFIBUS DP solution without the need of an additional microcontroller or software. This module must be qualified to radiation (needs time!!!) and could provide a solution for “hot” areas in the future... like the PS? Shift register

TE-MPE-TM 02/08/2012, TE-MPE-MS section Cabling constraints From discussions with Jean-Claude Guillaume… -Re-cabling interlocks in the tunnel (progressive integration…) o Point 1 and 5: Big campaign foreseen during LS1 => Ok for any modification o Point 2: A campaign was done in 2009 => Next big campaign during LS3 o Point 3: Next campaign LS2 o Point 4 and 6: “hottest” places, depending on radiation levels but a major re-cabling in tunnel practically excluded for LS1… -Pulling 2/3rds of cables of SPS: -From BB3 up to BA1 => Feasible -From BB3 up to BA6 => Feasible -Pulling cables from the surface buildings (BAs) to the tunnel = > Feasible

TE-MPE-TM 02/08/2012, TE-MPE-MS section MS Ressources - Tentative planning of other WIC renovation projects - NOT taken into account: Re-commissioning and maintenance of existing systems, other responsibilities and activities other than WIC,…

TE-MPE-TM 02/08/2012, TE-MPE-MS section SUMMARY DescriptionCostManpowerPROCON Consolidation Option #1 ---Risk of lengthy failure Option #2 (Boolean PLC) 180kCHF0.5 FTE (MS) FTE (ICE) Simple + standard, no cabling, diagnostic Ring line remains, no remote test, info only by sextants/ring Option #3 (Boolean PLC + cable) 300kCHF0.75 FTE (MS) FTE (ICE) Simple + standard, diagnostic per demi-sextant Additional cabling + patches, no remote test Option #4 (Boolean PLC + PLC comms) 300kCHF0.75 FTE (MS) FTE (ICE) Simple + standard, diagnostic per demi-sextant Special (non-safety part in PLC, no remote test Option #5 (Analogue I/Os) 400kCHF1.5 FTE (MS) FTE (ICE) Diagnostic per magnet without major Completely new SW projects, no remote test Option #6 (Profibus) >1.2MCHF2 FTE (MS) FTE (ICE) Full MontyConsiderable investment, validation time for rad tolerant I/Os, feasibility?

TE-MPE-TM 02/08/2012, TE-MPE-MS section MS Proposal for LS1 and post LS1 In view of the discussed technical and resource constraints a renovation of the SPS interlock system is considered feasible along the following lines: -Implementation of option 3 or 4 (depending on decision of EN/EL), options 5 and 6 are too resource and cost intensive to justify their benefits -Exchange of thermo-switches with ELMWOOD type, at least for all ring line magnets (in collaboration with MSC and SPS OP) during LS1 -Progressive replacement of magnet interlock boxes (new ‘trefle’) during LS1 and post LS1