1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.

Slides:



Advertisements
Similar presentations
NRC Consensus Standards Program
Advertisements

Update on NRC Low-Level Waste Program – Major Activities Large Scale blending of LLRW -Issued guidance to agreement states for reviewing proposals for.
1 RIC 2009 Construction Inspection Program Glenn M. Tracy, Director Division of Construction Inspection and Operational Programs March 11, 2009.
American Institute of Steel Construction Charlie Carter Vice President and Chief Structural Engineer.
Engineering Perspectives on First Year of New Reactor Construction Mohamed Shams, Ph.D., PE Structural Engineering BC US NRC, Office of New Reactors July.
10 CFR Part 26, Subpart I Managing Fatigue 10 CFR Part 26, Subpart I Managing Fatigue Kamishan O. Martin, Human Factors Engineer Office of Nuclear Reactor.
1 Current Reviews of Standards by NRC Tom Boyce, NRC/RES/RGDB Nuclear Energy Standards Coordination Collaborative (NESCC) November 7, 2013.
Albert Coons April 21, 2009 Emergency Preparedness and New Reactor Licensing Process: An Update on Where We Are Now Federal Emergency Management Agency.
Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
“Regulatory Risk-Informed Activities and Supporting PRA Technical Acceptability” Presented to Nuclear Energy Standards Coordination Collaborative (NESCC)
1 NRC Regulatory Initiatives National Radiological Emergency Preparedness Conference 2009 April 21, 2009 Bill Dean Deputy Director, Office of Nuclear Security.
Release of Patients Treated with I-131: An Update Michael Fuller Team Leader Medical Radiation Safety Team U.S. NRC.
Dr. Jose Pires Structural, Geotechnical and Seismic Engineering Branch
NREP 2009 Emergency Preparedness and the New Reactor Licensing Process: An Update on Where We Are Now Dan Barss Division of Preparedness & Response Office.
NRC LICENSE APPLICATION PROCESS
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
NRC Cyber Security Regulatory Program Development Background ANSI Nuclear Energy Standards Coordination Collaborative (NESCC) Meeting November 3, 2014November.
Cumulative Impacts James Slider November 7, 2013.
1 10 CFR Part 26 Subpart I Managing Fatigue Kamishan Martin Human Factors Engineering June 23, 2010 HPRCT conference.
Concrete Codes and Standards for Nuclear Power Plants (CTG) Chiara Ferraris, NIST Chairperson.
Seismic Instrumentation and Monitoring Needs of US Nuclear Power Plants Dr. Annie Kammerer Seismic Instrumentation Technology Symposium November 2009.
1 NRC Follow-up Actions on NESCC Task Group Reports (Concrete Repair, Cabling and Welding) NESCC Meeting November 7, 2013 Richard Jervey USNRC Office of.
JK August, ANS/Chair ANSI Washington DC March 28, /28/2013 NESCC Standards Meeting ANSI Washington, DC1.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative Larry Burkhart, Chief, AP1000 Projects Branch (LB4) Division of New Reactor Licensing NRC’s.
NESCC Meeting March 28, Topics Accomplishments Since Last Meeting Program Management for NESCC Support to the NESCC Sponsor Committee Review and.
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
Current Air-Operated Valve Regulatory Activities Steven Unikewicz US Nuclear Regulatory Commission Office of Nuclear Reactor Regulation January 2006.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
NRC Endorsement of Standards
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
November 7, Status * Concrete Repair Report was published in August * Included 40 recommendations for: * Revisions to standards. * New standards.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) March.
ACADs (08-006) Covered Keywords CFR policy, CFR violation, CFR enforcement Description Supporting Material
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
Configuration Management in New Reactor Construction Tom Kozak, NRO/DCIP/CAEB
RIC 2009 Rulemaking Process: “NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a “A New Approach” Jacob Zimmerman.
1 Emerging Issues: Materials and Mechanical Michele G. Evans, Session Chair 2009 RIC.
1 Control Room Habitability Program James A. Carlson, Omaha Public Power District, Author Deep Ghosh, Southern Nuclear Operating Greg Holbrooks, PE, Duke.
Regulatory Framework for Uranium Production Facilities in the U.S.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative David Matthews, Director, Division of New Reactor Licensing Larry Burkhart, Chief, AP1000.
1 NEI Process Discussion. 2 Topics for Discussion Relationship to NFPA 805 Relationship to Regulatory Guide Technical Process currently in NEI
ABNORMAL OCCURENCE REPORTING: PURPOSE, USES, and PROCESS Angela R. McIntosh Abnormal Occurrences Coordinator Office of Federal and State Materials and.
1 RIC 2009 NFPA 805 Regulatory Infrastructure Development Steven A. Laur, PE Sr. Tech Adv. Risk-Informed Initiatives NRC Office of Nuclear Reactor Regulation.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) March.
NESCC Meeting November 7, 2013 Advanced Nuclear Technology (ANT) Construction Speed and Quality Task Group.
Update on NRC Low-Level Waste (LLW) Program Activities.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Section 24 Pipeline Safety Standards Incorporated Into the Federal.
Technology Services – National Institute of Standards and Technology Implementing the National Technology Transfer and Advancement Act in the Federal Government.
1 RIC 2009 Fire Protection: Organizational Readiness for NFPA 805 (Technical Session 5) Alexander Klein, P.E. Chief, Fire Protection Branch Office of Nuclear.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
Proposed Update of Appendix I to Part 50 RIC 2009 Radiation Protection Proposed Update of Appendix I to Part 50 Jean-Claude Dehmel NRO/DCIP/CHPB March.
Status Update on the NRC Proposed Rule to Amend 10 CFR Part 61
NRC Update of Low Level Waste Emerging Issues
NRC’s LLW Regulatory Program: Update of Emerging Issues
10 CFR Part 61 Low Level Waste Disposal Rulemaking Update
Flooding Walkdown Guidance
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
NRC’s LLW Regulatory Program: Update of Emerging Issues
Regulatory Cooperation Forum (RCF) - Plenary 2018
Adding Nuclear Power to the Grid
USNRC IRRS TRAINING Lecture18
Overview of NRC Low-Level Radioactive Waste Activities and Initiatives
NRC Update of LLW Emerging Issues
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
TRTR Briefing September 2013
Presentation transcript:

1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory Research, Department of Engineering, Regulatory Guide Branch

2 NRC’s Policies on Consensus Codes and Standards Consensus codes and standards have been integral to the regulatory process for 3 decades Codes and standards promote safe operation of nuclear power plants, improve effectiveness and efficiency of regulatory oversight Federal law requires Government staff to use consensus standards where possible

NRC ‘Endorsement’ Processes Supported with a Legal basis Rules / Regulations (10 CFR) Regulatory Guides (RGs) Indeterminate legal standing (other than precedent) Licenses (FSARs and DCDs)- licensee specific Safety Evaluation Reports (SERs)- licensee specific Inspection Procedures – NRC use Standard Review Plans (SRPs) – NRC use Generic Communications, RIS, IN, etc. Technical Reports (NUREGs) Letters & Memoranda 3

Regulatory Guides & SRPs Regulatory Guides –Guidance to applicants - describes methods that the staff considers acceptable for use in implementing regulations –Large percentage of standards cited by NRC in RGs –Best repository of the current staff positions & standards SRPs –Guidance to NRC staff (not an endorsement, per se) –Only updated intermittently, as determined by NRC offices needs 4

How to get NRC to review your SCS? One process –Send a letter to the NRC Standards Executive (Mike Case); Reg Guide branch coordinates response across NRC offices –Issues: Reviewing is separate from endorsing; based on review, need NRC technical lead to initiate RG update; SRP only updated intermittently Better process –Get an NRC representative to participate in developing the standard –Get an informal commitment from the NRC representative to consider the standard in a RG or SRP –Send a letter to the NRC Standards Executive –Issue: More likely to get NRC tech lead to initiate RG update 5

Generic Plan for Guidance Development 6 No Further Action Receive SCS for Review Identify Regulatory Issue Determine appropriate Guidance and develop Identify and Review Current Guidance Gaps found? YesNo

NRC SCS Review Priorities NRC believes the NESCC recommendations are worthy of support for each SDO. American Concrete Institute- ACI American Society of Mechanical Engineers-ASME American Institute of Steel Construction- AISC American National Standards Institute –ANSI National Fire Protection Association – NFPA American Society of Civil Engineers –ASCE NESCC Concrete / NRC alignment -NRC Top ‘4’ ACI Code Requirements for Nuclear Safety-related Structures ACI Code for Concrete Containments ANSI/AISC N Specification for Safety-Related Steel Structures for Nuclear Facilities ASCE 4.xx - Seismic Analysis of Safety Related Structures 7

NRC Work to support NESCC - Concrete SCS related to Concrete is the first area NRC looked at for potential collaboration within NESCC project Staff from the Reg. Guide Branch reviewed NIST/ANSI Concrete report recommendations –Reviewed the Identified Documents and where they stand in NRC plans –Discussed with NRC/RES management Identified key reviews and schedule 8

Planned Reviews of Concrete SCS Goal is to consider needs as identified in the NESCC report for collaborative opportunities Timeline for ACI review, – (includes 51 ASTM Docs) AISC N X with draft Appendix N9 review, –(includes 84 SCS) and Specifications, codes and standards referenced within each 9

American Concrete Institute ACI 349 ACI 349, Code Requirements for Nuclear Safety-Related Concrete Structures NRC currently endorses ACI (with exceptions) in RG 1.142, R2, dated 11/2001 Current ACI 349 is 2006 issue with commentary including significant changes worthy of review. Plan is to review/endorse the proposed ACI and ASTM standards in RG: R3 10

RG Plans 11 NRC participating in development –Currently in process DG to go through internal NRC review –Following publishing. (1QFY14?) Publish DG with 60 day comment period –Likely 6 months following publishing Incorporation of comments and ACRS review – Typically 2-6 months following end of public comment period Issue final RG –Total time approximately 1 year following publishing the guide

AISC N and Appendix N9 12 NUREG-0800 is the SRP for Nuclear Power Plants, DCD for the AP1000 as well, currently refers to: N including Supplement 2 (2004), Current N (and 2011) has ANSI/AISC , Specification for Structural Steel Buildings, as the baseline document (instead of standalone document) Use of LRFD approach (with ASD as an alternative) which is consistent with the code for concrete structures (ACI-349) Planned Standard for Modular Composite Construction (SC) (Appendix N9) –A concurrent review of Appendix N9, Standard for Modular Composite Construction (SC) is ongoing –Also comparing with International standards –Plan to issue a new RG “Safety-Related Steel and Steel- Concrete Composite Structures (Other than reactor vessels and containments)” would like it to include App. N9

RG Rev. 0 Plans Ongoing NRC participation in development, and concurrent review 3 rd party review complete by –4QFY13 DG-1304 to go through internal NRC review – (incorporate draft App. N9) –1QFY14 Publish DG-1304 with day comment period –1QFY14 Incorporation of comments and ACRS review –(variable) Issue final RG –2Q-3QFY14 13

NRC SCS Review Normal Review Process NRC reviews the Reg. Guide library in a 5 year cycle. 3 outcomes: –Acceptable-As-Is –Revise, or –Withdraw Upcoming reviews include guides which reference numerous SRS 14

Related Seismic Regulatory Guides and SCS Development of Floor Design Response Spectra for Seismic Design of Floor-Supported Equipment or Components (1978) 10CFR50, App. A Criteria 2; Peak response spectra analysis Site Investigation for Foundations of Nuclear Power Plants (2003) 10CFR100, Subpart B Reactor Site Criteria; RG covers Detailed site investigations; borings; rocks and soils etc. RG references ASTM, ASCE US Army COE Procedures and Criteria for Assessing Seismic Soil Liquefaction at Nuclear Power Plant Sites (2003) 10CFR Analysis of soli liquefaction Anchoring Components and Structural Supports in Concrete (2003) ASCE Army COE, Etc. 15

Questions? ??? Contact Rick , or, Regulatory Guide Comment Portal collections/reg-guides/contactus.html 16