Tracker Refurbishment. What was done… Over the past 3-4 months Trackers 1 and 2 have been refurbished. What does this mean? The trackers were removed.

Slides:



Advertisements
Similar presentations
Levolors New Size-In-Store Blind Cutting Machine.
Advertisements

Assembly Manual Mike Fortney 04/09/2004 CricketSat Receiver.
Mice Beam Stop Geoff Barber 1 Mice Beam Stop (end of DSA) Details of the current Layout and how it was arrived at.
Service Technician Training
Optical Manufacturing Solutions 1 Probe Assembly.
Installation. Indoor Unit Installation Typical Installation.
Click on this image to open the full PDF document.
EMB PAR, 23 nov P. Perrodo, LAPP, Annecy1 ATLAS EMB SERIE MODULE CABLING Experience started with three successive prototype modules (module 0) in.
Inside-, Depth-, and Height-Measuring Instruments
Module 3: Marking out and Hand Tools
Procedures during Tracker Connection WPA meeting 3 rd December 2007, Michael Eppard, CERN Installation sequence Manpower needs for installation work.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
2035 Series. Common Components The design of the 2035 Series valve includes many proven components for assured reliability. These items include: –Same.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
Takashi Matsushita Imperial College T. Matsushita 1 Station 5.
Assembly Manual Mike Fortney 04/02/2006 CricketSat Receiver.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
G.Barber 28 Oct Construction/Refurbishment Of The Tracker Prototype Contents:- Welcome Back Plans Layout Things to be addressed New Schematic.
Takashi Matsushita Imperial College T. Matsushita 1 Engineering (Mechanical) Geoff Barber.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
G.Barber Mice Tracker Mechanical Progress Imperial Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment.
Installation. Indoor Unit Installation Typical Installation.
TP4-ENERSOL-TD/PV double function
1 Telecom Cabling Patch panels, cabinets and raised floors.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
18 June 20031Integration Review B. Schmidt Outline: Filter design and basic concept to ensure seismic stability Filter Installation and the required tooling.
Installation. Indoor Unit Installation Typical Installation.
Mars Reconnaissance Orbiter1:48 scale READ ALL THE INSTRUCTIONS AND INSPECT THE PARTS SHEETS FIRST. Score fold lines and cut out the parts. High Gain Antenna.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
4th Station Waveguide Test Roger Hare & Aron Fish.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
M. Takahashi, 21 January, 2016 Station Acceptance (SA)
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
Workshop Sponsored by: Home Grown Food Rain Barrel for Under $40.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Tracker 1. Status 2. Expected delivery date of system to RAL 3. Required support infrastructure needed for setup and initial debug. Things like vacuum,
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
G.Barber Mice Tracker Mechanical Progress Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment of Tracker.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
VIEW SERIES with Sliding Door
BM&N STS ladders assembly in VLHEP
Installation Walkthrough Image Guide
Planning for Proto-DUNE PD Installation and Cabling at CERN
Scorpion is a remote tester specifically designed for testing ASD systems. Scorpion is compatible with the FAAST aspirating smoke detector. It is particularly.
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
Aron Fish Imperial College Mice Video Conference 01/02/06
Step-by-step assembly instructions
Step-by-step assembly instructions
GLAST Large Area Telescope:
Cryomodule Assembly Plan
Presentation transcript:

Tracker Refurbishment

What was done… Over the past 3-4 months Trackers 1 and 2 have been refurbished. What does this mean? The trackers were removed from their sarcophagi (one at a time) and laid out on a table in the dark room. The waveguides were unfurled from the support mast and they were inspected. To inspect them a UV free light source was attached to the 128 way bulkhead connector and the light path was followed along the waveguides. We were looking for bright ‘starbursts’ along the fibre, this would indicate a fracture in the fibre. Small starbursts were ignored but in tracker 2 there were broken fibres and where this was the case the complete internal waveguide was replaced. 2 were replaced in total. 2

What was done… Pictures of the illuminated Light guides, courtesy of Adam Dobbs 3

What was done… The LED calibration system was installed on both detectors and we have Ed Overton to thank for that as he was given a very tight deadline in deed to ‘come up with the goods’. 4 Type II Modules: When viewed from side (right image) light cone indent is much smaller (from 15mm to 26mm). Also the cone from above looks squashed or 'pointy'. Type I: When viewed from the side (right image) have a large dip from the light cone which goes from ~7mm to 27mm.

What was done… Finally the lightguides and the LED fibres were re-attached to the support mast, the whole assembly wrapped in UV film and restored to its sarcophagi. Many thanks to Adam, Craig, Eamonn, Ed and Kevin, Mark and Simon Plus anyone I've forgotten. 5

Installation of the Mice Trackers into the Spectrometer Solenoids Geoff Barber 7 Nov2013 Mice CM37

Pre-amble It has been decided that the tracker installation will take place in R9. Whilst this will give a pleasant working environment it does not come without problems. All of the work will need to be co-ordinated with work on the AFC’s, we will not be allowed to work when the AFC’s are powered for example. All tools will need to be registered into and out of the area. There will need to be a named person who will be responsible for all work carried out and no work will be allowed if that person is not there. We will not have control over the lighting so this means all work will need to be carried out inside a light tight enclosure (again). In the next few slides you will see that this gives limited space to work but we are getting use to this now as people working on the tracker refurbishment will know. What that taught us is that you try to work with the minimum equipment and the minimum number of people in the area at any given time (and I need to DIET). All that said the following is an outline of the procedures and things still to be discussed. 7

Sequence Of Operations 1 We have Made a start in R9 (both AFC’s are now installed but a safety procedure needs to be written and agreed ) the first job was to install the working platform. This consists of a series of concrete blocks that will supports the Spectrometer Solenoid. The layout uses 750 x 750 x 2250mm concrete blocks as this is a standard size. Main Door 5 gauss line

The next operation was to place the SS onto the concrete blocks. This was be carried out by an outside company (King Lifting) due to the weight limit of the R9 crane Sequence Of Operations 2 Now in position the the bore will need to be cleaned and may require surveying as there appears to be ‘high spots’ in the region of the weld and score marks along its length. What are the implications for the leak testing? 9

Sequence Of Operations 3 Once the SS is ready the Patch Panel can be fitted and sealed. 10

Sequence Of Operations 4 X - Y Alignment When patch panel installation is completed the survey of the bore is carried out and using the x – y Alignment tool at both tracker/bore support positions the tracker feet adjustment can be ascertained and replicated on the tracker before installation. This ensures that the tracker will be on the best x-y axis possible. It is achieved by fitting a survey ball at the position of the center of station. The two other balls may or may not be required to set the tool horizontal (will discuss with John Palin next week). Measurement to Replicate Adjustment Cams sit on Bore Wall 3 rd Steady Ø6mm reamed Hole (Center of Station) for survey cup 11

Sequence Of Operations 5 Φ and Z Alignment The φ and z alignment relies on a hemispherical bracket on the tracker being pulled into a Vee block that is mounted and fixed from the patch panel. This block needs to be aligned then doweled (this procedure is carried out when the patch panel is fitted so that the drilling for the dowels is done whilst the tracker is not present). Z is just a straight measurement but φ will need to be surveyed. To do this a survey ball is held in the Vee block as the diagram shows. 12

Sequence Of Operations 6 Assembly of the light tight enclosure As stated the work will need to be carried out in a UV excluded environment, this means in this instance a tent. The tent consists of a sub base to get the height required, The tent itself and then there are two entrance chambers (to stop light ingress). Two are required as there will not be enough room inside to allow people to easily get from one side to the other whilst the installation platform is in place. Filtered lighting is now installed inside. 13

Sequence Of Operations 7 Preparation for the installation Once we have a secure working environment the tracker can be bought into the area and secured at the side of the SS on a support (to be made) and then the installation platform is installed and levelled. Once this has been done the tracker can be removed carefully from its tube and placed on the installation platform. The tracker still has its fibres and LED waveguides attached to the support mast (exists but not yet modelled, see photos on slide 9). This is the time to adjust the four cam support feet to replicate the dimensions given by the x – y alignment jig and the last chance to fit the Hall probes if they are available and to check that the LED system is behaving itself. Once all of this has been done the tracker is slid into the SS. 14

Sequence Of Operations 8 Fitting the Waveguides With the tracker inside the SS the φ Z bracket is fitted using dowels. The tracker is now in its final position. In the case of Tracker one the diffuser support crown will need to be installed. The internal waveguides are removed from the support mast one at a time and routed to there position in the patch panel perimeter. Craig has raised the issue of the orientation of the connector in the patch panel, as there is only one possible rotational position that the internal/external waveguides can connect and the external waveguides do not wish to accommodate any twist it will be essential to fit the internal waveguide bulkhead connectors with the correct position. I don’t think that we can accommodate the cryo-coolers in the tent so some form of orientation plate will need to be made. We need a meeting of all the interested parties to thrash this out. 15

Sequence Of Operations 9 Closing Up With the tracker inside the SS, all of the bulkhead connectors fitted and secure patch panel cover is fitted. Before the final fitting it is the final check to ensure that the connector numbering on the patch panel corresponds to the correct connector. Once reassured it is simply a matter of fitting the patch panel cover, all of the light tight caps to the connectors (if not already done) and fitting the gas inlet and outlet. 16