Beam Position Monitors: Front-End Components - BPM Acquisition Architecture - Components Selection - Irradiation Tests MOPOS Radiation Tests - JL Gonzalez.

Slides:



Advertisements
Similar presentations
LAPP electronics developments Jean Jacquemier, Yannis Karyotakis, Jean-Marc Nappa,, Jean Tassan, Sébastien Vilalte. CLIC WS 12-16/10/2009.
Advertisements

Follow-up meeting of the Administrative Agreement between FCT and CERN Vicente Leitão, Pedro (PH/ESE-ME, joined in May 2013) Supervisor: Moreira, Paulo.
A compact, low power digital CDS CCD readout system.
16 Sep 2008 Versatile Link Status Report F. Vasey on behalf of the project steering board With input from C. Issever J. Troska.
A Serializer ASIC for High Speed Data Transmission in Cryogenic and HiRel Environment Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group.
R&D on pixel sensors at ILC ILC Workshop - November 2006 – Valencia.
SPS Beam Position Monitors: MOPOS Front-End Electronics Jose Luis Gonzalez BE/BI 22/11/2013.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Huazhong Normal University (CCNU) Dong Wang.  Introduction to the Scalable Readout System  MRPC Readout Specification  Application of the SRS to CMB-MRPC.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Radiation test - PSI Date Equipment Owner Test groupDUT May 20th EN/STI OSL, TLD BE/BI Detector June 1stTE/EPCEN/STI Mosfet Voltage regulators Voltage.
BepiColombo/MMO/PWI/SORBET PWI meeting - Kanazawa 24/03/2006M.Dekkali MMO PWI Meeting Kanazawa University 24 th March 2006.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
G D Electronics Infrastructure for advanced LIGO LSC Meeting, Boston, July 25, 2007 Daniel Sigg, LIGO Hanford Observatory.
Font 4 Review Digital Feedback System BPM Analogue Processor Digital Processor Feather Kicker Power Amplifier Pick up StriplinesKicker StriplinesBeam.
Main Board Status MB2 v1 for FATALIC & QIE 10/06/2015Roméo BONNEFOY - LPC Clermont1 Roméo BONNEFOY François Vazeille LPC Clermont-Ferrand.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź LLRF review, DESY, 3-4 December 2007 Advanced.
CaRIBOu Hardware Design and Status
Data acquisition system for the Baikal-GVD neutrino telescope Denis Kuleshov Valday, February 3, 2015.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
Mircea Bogdan, NSS2007 Oct. 27-Nov.3, 2007 – Honolulu, Hawaii1 Custom 14-Bit, 125MHz ADC/Data Processing Module for the KL Experiment at J-Parc M. Bogdan,
Beam Secondary Shower Acquisition System: ICECAL Board design, Preliminary Pictures Student Meeting Jose Luis Sirvent PhD. Student 07/07/
Low Voltage Power Supplies I.Placement II.Size III.Power consumption IV.Cabling V.Regulators board blocs VI.Component selection VII.Schematics VIII.Firmware.
Alexei SemenovGeneric Digitizer Generic Digitizer 10MHZ 16 bit 6U VME Board.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Acquisition system for the CLIC Module. Sébastien Vilalte.
The GBT, a Proposed Architecture for Multi-Gb/s Data Transmission in High Energy Physics P. Moreira CERN – Geneva, Switzerland Topic Workshop on Electronics.
BI day /12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.
Digital CFEB (an Update) B. Bylsma, EMU at CMS Week, March 16, Ben Bylsma The Ohio State University.
Charge Measurement Using Commercial Devices Jinyuan Wu, Zonghan Shi For CKM Collaboration. Jan
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
LHC Beam Loss Monitors, B.Dehning 1/15 LHC Beam loss Monitors Loss monitor specifications Radiation tolerant Electronics Ionisation chamber development.
J. MEKKI (1/8) 06/03/12 – RadWG meeting CNRAD plan Beam schedule – 1 st Slot Overall beam schedule for 2012 Equipments to be installed o Higher flux locations.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
CHEF 2013 – 22-25th April 2013 – Paris LHCb Calorimeter Upgrade Electronics E. Picatoste (Universitat de Barcelona) On behalf of the LHCb group.
A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group Department of.
PSI - 11 Feb Status of the electronic systems of the MEG Experiment.
Wisdom stone Development of smart detectors system – generation B Final Presentation Presented by: Emanuel Dima, Elad Kadosh Supervisor: Boaz Mizrachi.
FED V1 Pulse Shape Issues System Meeting, CERN 14 th -16 th October 2003 M. Noy Imperial College London Pulse Shape Issues for the Tracker FED M. Noy Imperial.
BPM stripline acquisition in CLEX Sébastien Vilalte.
LAPP BI Read-out electronics Jean Jacquemier, Yannis Karyotakis, Jean-Marc Nappa,, Jean Tassan, Sébastien Vilalte. CLIC BI WS 02-03/06/2009.
Optical Readout Interface (ORI)
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
R2E Availability October 17 th 2014 ADC and Common development options G. Spiezia.
Standard electronics for CLIC module. Sébastien Vilalte CTC
Mircea Bogdan Chicago, Oct. 09, BIT, 500 MHz ADC Module for the KOTO Experiment The University of Chicago.
Mitglied der Helmholtz-Gemeinschaft Hardware characterization of ADC based DAQ-System for PANDA STT A. Erven, L. Jokhovets, P.Kulessa, H.Ohm,
BLM System R2E and Availability Workshop, B.Dehning 1 Bernd Dehning CERN BE-BI
Front-end Electronic for the CALICE ECAL Physic Prototype Christophe de La Taille Julien Fleury Gisèle Martin-Chassard Front-end Electronic for the CALICE.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
AMSAT-SA Digital Transponder, telemetry and command system.
Operational amplifier
PADME Front-End Electronics
SVD FADC SVD-PXD Göttingen, 25 September 2012
Beam Secondary Shower Acquisition System: TWEPP2013 Interesting news
Test Boards Design for LTDB
Calorimeter Mu2e Development electronics Front-end Review
DOR(OS) integration status and plans Jakub Olexa, Marek Gasior
New developments and inventory
DCH FEE 28 chs DCH prototype FEE &
Status of the MOPOS BI TB – 26th June 2014.
SPS Beam Position Monitors: Front-End Electronics
LHC BLM system: system overview
VELO readout On detector electronics Off detector electronics to DAQ
LHCb calorimeter main features
Combiner functionalities
Optical links in the 25ns test beam
The ATLAS LAr. Calibration board K. Jakobs, U. Schaefer, D. Schroff
sPHENIX DOE-SC CD-1/3a Review WBS 1.5.3: CalElec Digitizers
Presentation transcript:

Beam Position Monitors: Front-End Components - BPM Acquisition Architecture - Components Selection - Irradiation Tests MOPOS Radiation Tests - JL Gonzalez

Logarithmic Amplifier Principle MOPOS Radiation Tests - JL Gonzalez A B LogAmp Diff. Amp. Position = K * V out BP Filter LogAmp BP Filter ADC & Serializer Constraints on LogAmp ICs: Dual Channel and Integrated Difference Amp. Fast response: < 1%

MOPOS Architecture MOPOS Radiation Tests - JL Gonzalez Optical Fibres

Analogue Components The aim is to qualify the components on a test board during a single radiation period. LogAmps – AD8302: Analog Devices Gain and Phase Detector – ADL5519: Analog Devices Dual Log Detector – MAX2016: Maxim Dual Log Detector MOPOS Radiation Tests - JL Gonzalez

Analogue Components AD8302: Analog Devices Gain and Phase Detector MOPOS Radiation Tests - JL Gonzalez

Analogue Components ADL5519: Analog Devices Dual Log Detector MOPOS Radiation Tests - JL Gonzalez

Analogue Components MAX2016: Maxim Dual Log Detector MOPOS Radiation Tests - JL Gonzalez

Analogue Components Low Dropout Regulators – LT1963A: Linear Tech. Low Noise, LDO Regulator – LP3875: National Semi. Low Noise, LDO Regulator – TL1963A: Texas Inst. Low Noise, LDO Regulator – TPS7A4501: Texas Inst. Low Noise, LDO Regulator ADC Drivers – ADA4932: Analog Devices Differential ADC driver – THS4521: Texas Inst. Differential ADC driver MOPOS Radiation Tests - JL Gonzalez

Analogue Components Optical transceivers (T/R: 2 fibers) – AFCT-5705LZ: Avago SFP Transceiver, 1.25Gb/s – FTLF1318P2BTL: Finisar SFP Transceiver, 1.25Gb/s MOPOS Radiation Tests - JL Gonzalez

Analogue Components Bidirectional Gigabit Transceivers (single fiber) – DEM-330T/330R: D-Link – LTE3405/4305: Hisense – SPL-35-GB-BX: Source Photonics MOPOS Radiation Tests - JL Gonzalez

Radiation Tests for Belle II Takeo Higuchi (KEK); TWEPP2011 1‐year‐equivalent neutron dose = 10¹¹ neutrons 1‐year‐equivalent γ‐rays dose = 100 Gy 4Gbps optical transceivers (850nm) – AVAGO (AFBR‐57R5APZ): Killed by  300 Gy – FINISAR (FTLF8524P2BNV): Killed by  300 Gy Voltage Regulators – LT1963: Killed by  7 kGy MOPOS Radiation Tests - JL Gonzalez

Analogue/Digital Converters 40Msps - Parallel ADC – AD9269: Analog Devices Dual 16-bit ADC – LTC2181: Linear Tech. Dual 16-bit ADC 40Msps - Serial ADC – LTC2264: Linear Tech. Dual 14-bit ADC, serial LVDS – ADS6242: Texas Inst. Dual 14-bit ADC, serial LVDS MOPOS Radiation Tests - JL Gonzalez

Digital Components Low Voltage Buffers – 74VCX162244: Fairchild 16-bit Buffer/Line Driver – 74ALVCH162244: Texas 16-bit Buffer/Line Driver – 74VCX162827: Fairchild 20-bit Buffer/Line Driver LVDS Buffers – FIN1108: Fairchild 8-port LVDS Repeater MOPOS Radiation Tests - JL Gonzalez

Irradiation Tests Tests of analogue components (CNRAD) – Installation of a test board during next technical stop (Nov. 7, 2011) – Irradiation tests in 2011 and beginning 2012 Tests of A/D components (CNRAD) – Installation of a test board in March 2012 Tests of Functional Prototype (CNRAD) – Installation of a board in June 2012 MOPOS Radiation Tests - JL Gonzalez

Project Development Plan Hardware Production and Test – Final prototype tests (2012) – Series production (2013) – Qualification and test of the series ( ) Hardware Installation (end 2013 – mid 2014) MOPOS Radiation Tests - JL Gonzalez