Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.

Slides:



Advertisements
Similar presentations
LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions.
Advertisements

Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
PIP Update July Agenda Summary Update – Budget/RLS – Current Activities – Upcoming Activities/ Changes Update Slides High-Power Ferrite TestingDennis.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Proton Improvement Plan (FY13 PMG Q4). William Pellico, Fermilab PMG, Nov PIP FY13 Q4 Summary Task Highlights Budget and Labor Review Summary.
Proton Source Vacuum Plan By David B. Augustine Ben Ogert Jr. August 30, 2011.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Proton Source Water Systems Proton Source Workshop December 8, 2010 Maurice Ball.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
2015 Shutdown Joe Compton 3/11/2015. RIL PIP Work  Install operational laser notcher  5 days  Dave Johnson & Todd Johnson.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Refurbished Booster RF John Reid October 24, 2012.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
The Operation of the Tevatron Vacuum system Authors David Augustine Alex Chen Scott McCormick 1.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Proton Improvement Plan Overview Bob Webber July 13, 2011.
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
Automotive Heating and Air Conditioning, Fifth Edition By Tom Birch © 2010 Pearson Higher Education, Inc. Pearson Prentice Hall - Upper Saddle River, NJ.
PIP Update Aug. 21 st Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
2/17/2016 Recycler -Gattuso Recycler Shut Down Status  Flying Wire Status  Wire Vacuum Certified  Tunnel Bake Prep status Disconnection of BPM, Correctors,
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
Machine Status  Proton Source Commissioning and Studies 8/13-8/14: Linac & Booster Maintenance Period  Main Injector MI30 vacuum ○ Work continues to.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Summary Director’s Review August 2006 Eric Prebys.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
1 Recent Updates Stony Brook Crew. 2 Maintenance Week Cryo Gate Valve –Dirt-like black substance on Valve—cleaned –Repair Successful; no more leaks. Rebuilt.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Answers to Questions Director’s Review August 2006 Eric Prebys.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Proton Source Meeting, August 8, 2003 – E. Prebys 1 Major Projects in Linac/Booster  New Linac Lambertson  (4) New EDWA magnets in MI-8 line  (3) New.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
March 7 th Shutdown Shutdown Begins: Monday morning, March 7 th :00 Beam OFF Safety System Testing 08:00 Rack out KRSS, switch MI house power to.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
PIP Shutdown Status 9/17/2014. RIL/Linac Jobs L1 Transformer ◦Rigging complete ◦Electrical work started ◦Turn on this coming weekend Laser notcher flange.
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
Friday 5/1/ meeting. I wish to lock in the power outage onTuesday 5/5/09 at the end of the 0930 lab scheduling meeting speak now or :
EBS-1 # COOLANT FLUID EXCHANGE QUICK REFERENCE ATTENTION: Using the Coolant Fluid Exchange requires the FILL and VAC Valves on the SERVICE.
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 10/06/2014.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.
S A Griffiths CM42 June 2015 Electrical & Control.
Preparation Phase of the FAIR Project
Long Shutdown for the LHC: Vacuum Beam Pipes
XFEL Vacuum System Commissioning
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
Presentation transcript:

Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement RIL and Linac General Maintenance Booster Turbo Pump Replacement Booster Vacuum Gate Valve Replacement Booster General Maintenance 8/18/2014David B. Augustine Benjamin Ogert Jr.

RFQ Injection Line Install isolation valve between RIL and Tank 1 Install Laser Notcher Replace turbo pump Replace Einzel Lens Re-locate Einsel Lens Switch We think this is 1 week of work but it will be ultimately driven by shop time. 8/18/2014David B. Augustine Benjamin Ogert Jr.

NTF Beam Line A video was recently taken of the NTF Beam Line. It looks as if we understand how to dis- assemble the Beam Line and remove it. Every thing up to the 58⁰ magnet will have to be removed. Once the vacuum is disconnected at each end the beam line can be slide out of place in sections. The cables and hoses will be replaced on the way in. We think this is a 1.5 week task. 8/18/2014David B. Augustine Benjamin Ogert Jr.

400 MeV Turbo Stations The parts are in the manufacturing or delivery process. We anticipate having all parts in hand by the end of August. We think this is a week long task. 8/18/2014David B. Augustine Benjamin Ogert Jr.

Linac General Maintenance Replace Stem box cover pumps from oil sealed to Scroll type. Change oil other oil sealed vacuum pumps. This is fill in work 8/18/2014David B. Augustine Benjamin Ogert Jr.

Booster Turbo Stations The goal is to replace turbo pumps in quadrants of the machine. The turbo pump replacement is a couple hour task. The cable pull is two days. In each case the cable penetration has to be emptied and then re- filled. Priority should be given to turbo pump replacement in the RF sections. The cables for one quadrant, 6 turbo pumps, is 12 days. The turbo pump replacement is 3 days. 8/18/2014David B. Augustine Benjamin Ogert Jr.

Booster Vacuum Valves Four out of seven vacuum valves are replaced. We will continue this process until finished. Approximatey 1 day to replace and leak check each valve and vacuum system. About a week. 8/18/2014David B. Augustine Benjamin Ogert Jr.

Booster Correctors Replace leaking corrector Long 1. Involves cutting and welding. Replace Short 12 corrector and beam tube. Best guess 3 days 8/18/2014David B. Augustine Benjamin Ogert Jr.

Booster General Maintenance Leak check periods 3, 4, 5 and 6. Support RF work as needed. Higher priority. May have ion pumps to change. 8/18/2014David B. Augustine Benjamin Ogert Jr.

Time Concerns Too much work for the time alloted 3.5 weeks in RIL and Linac 2.5 weeks in Booster Any slippage will end up in week 7 8/18/2014David B. Augustine Benjamin Ogert Jr.

Thank you for your attention 8/18/2014David B. Augustine Benjamin Ogert Jr.