19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.

Slides:



Advertisements
Similar presentations
Yasmine Amhis EPFL Yasmine Amhis EPFL Status of the LHC and LHCb Adrenaline.
Advertisements

1 st International Conference "Discoveries of Higgs and Supersymmetry to Pioneer Particle Physics in the 21st Century" Concluding Remarks (LHC Status)
Mo morning set up 228 bunch injection (36 bunch trains), ramp, squeeze, collisions h luminosity (depending on experiments) ATLAS length scale calibration.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Beam Test of TGC electronics in 2003 Introduction Electronics Setup Stand-alone Run Setup Data.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
5-Jan-2010 XEB Meeting at CERN 1 Debriefing from first data: CSC muons n Lessons learned u LHC is a quiet machine  CSC HV can remain on at all times,
October 1st th Workshop on Electronics for LHC Experiment at Amsterdam 1 Beam Test Result of the ATLAS End-cap Muon Level-1 Trigger Chikara Fukunaga.
PHENIX Status, 2/22/11 VTX commissioning on beam Local polarimeter in service 9.6% in blue, -16.6% Residual transverse component for longitudinal beam.
14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview.
ATLAS muon endcap 1 layer of tracking chambers (MDT) 3 layers of trigger chambers (TGC) which we are working on ATLAS TGC installation and commissioning.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Beam expected in the afternoon PM: – Establish first-turn – Establish closed orbit – Rough correction of machine parameters Evening: – RF capture Night:
1 The Operation of the LHC detectors LPCC student lectures CERN June 29 th 2010 Special thanks to T. Camporesi, C. Garabatos Cuadrado, T. Pauly, W. Kozanecki,
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
1 ATLAS Readiness for Run 2 C. Gemme (INFN Genova) ATLAS Collaboration CSN1 – venerdi’ 17 Aprile 2015.
Main priorities for the next years. Where do we stand Muon system in good shape (in my opinion) – Sub-systems hardware quite robust (see later for main.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.
TGC Timing Adjustment Chikara Fukunaga (TMU) ATLAS Timing Workshop 5 July ‘07.
Luca Spogli Università Roma Tre & INFN Roma Tre
Saturday 7ish – refill for RP set-up 9:15 Going for Roman pot alignment. Stefano is coming. 12:10 TOTEM: Alignment of horizontal RPs B2 finished, short.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
First CMS Results with LHC Beam
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
Zhen YAN, Muon Offline DQ meeting, 05/10/2015 Signed off runs(express stream) since last Friday meeting Default defects:  MS_RPC_BA_ROD_PROBLEM_1  MS_RPC_BC_ROD_PROBLEM_1.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
AEM, Sept Frank Chlebana (Fermilab) Status of the LHC and CMS Frank Chlebana (Fermilab) All Experimenter’s Meeting Sept
February 26 th 2013Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
C. Clement (Stockholms Universitet) Partikeldagarna 2008, Stockholm.
Preparation for Running Outline Present Schedule Detector Preparation Requests for dedicated runs –Cosmics, Splashes, Alignment Muon Shifts Experts A.
Atlas status report. LHC Cooldown Status LHC is proceeding with the cooldown and the hardware commissioning L.Evans is asking the experiments to close.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
ATLAS Plenary, Feb. 18th, 05Commissioning1 Report on the commissioning activities G. Mornacchi, P. Perrodo and Sub-Systems Collaborators.
Real data in the Muon Spectrometer Bernardo RESENDE and a lot of other people not named here NIKHEF Jamboree, December 2008.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Wednesday 8.9 External crossing angles:
LHC during week 45 LHC delivered ~0.837 fb-1 in week 45
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Saturday 21st April 00:33 Interlock during ramp on BLM HV
LHC Morning Meeting - G. Arduini
LHC Morning Meeting - G. Arduini
Monday – recovery from MKI flashover
Friday March 4th 08h32: Access for beam dump system.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Yesterday’s morning’s controls issues
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
Yesterday morning Held 1647 for a while – SPS kicker problem
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Run coordination Summary
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Summary for LPC (March 7th, Ralph Assmann)
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
Fri :52 Stable beams fill #2536
Weekend Summary Friday Saturday Sunday C. Gemme, INFN Genova,
Presentation transcript:

19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics Running –CSC, MDT, RPC, TGC Dedicated Runs, Weekly Operation, Planning etc. March 19 th 2012 A. Polini

19 March 2012Muon Week - Operations2 Status 3 months shutdown just over Running since 2 weeks with 24/7 shifts Many activities performed on Detector, Infrastructure, HW + SW –MDT EE side C fully installed –RPC power, HV, gas, etc. –TGC chamber replacement + conditioning –MDT gas leaks and general overhaul –CSC Rod Firmware –… and many more  detailed reports afterwards Priority: Readiness for Highest Luminosity Running Good and Stable Data Taking Conditions 2

19 March 2012Muon Week - Operations3 LHC Schedule Day LHC Tentative Planning: 1injection & closed orbit 3: ramp & squeeze probe 5: injection of nominal bunch at ref orbit (flat). 7start collimation setup at 450 GeV. 8aperture at 450 GeV. 12: setup first collisions 14ramp & squeeze with nominal bunch. 16: start collimation setup at 4 TeV 20: multi-bunch injection 23first stable beams 3x3.

19 March 2012Muon Week - Operations4 Agenda 4

19 March 2012Muon Week - Operations5 Cosmic Run (Solenoid ON Toroid OFF) Condition s: –Solenoid ON, Toroid OFF –MDT/CSC Ready (HV/LV OK), RPC Ready (but ~80% of HV channels ON), TGC Off Trigger: –RPC lower Sectors (10-16) Mu_4 mu_11, Calibration Stream on Minimum participating components: Muon ID (SCT+TRT) List of Runs: Mon Mar :04:06 − 09:43:57 Solenoid ramping down from 2:30 am Sun Mar :54:35 − Mon Mar 12, 01:29:07 Physics_Cosmic_Muon Stream ON Sun Mar :34:53 − 22:28: Sun Mar :51:58 − 09:18:17 NO CAL + NO PIX Sun Mar :34:37 − 01:33: Sat Mar :58:18 − Sun Mar 11, 00:24:14 No Calorimeter Sat Mar :33:50 − 22:02:16 PIX standby Sat Mar :54:32 − 19:14:34 HLT passthrough Sat Mar :52:03 − 11:31:18 Run Restarted Fri Mar :40:53 − Sat Mar 10, 08:31:11 LVL1 Prescales OK Fri Mar :53:19 − 11:50:44 1st run ON (CAL + PIX included) 5 All events available on the tier0 Many Thanks to Data Preparation

19 March 2012Muon Week - Operations6 Beam Splashes Beam 23:37, March 14 th –run , lb 200, event BCID 0 (1) –trigger 1 BC earlier Beam 00:15 March 15 th –LB 238 ev BCID 202 (200) –“Too many hits in events” for many SSW at BCID = 200 for TGC –Occupancy peak in all the MDT BCID = 200 –Larg – triggering 1 or 2 BC earlier Data available for Analysis EE status?  Improvements for next official ones? 6 MDT Occupancy RPC DCS (peaks)

19 March 2012Muon Week - Operations7 Last Week Operation and Planning No Muon planning Meeting tomorrow March 20 th Friday afternoon (Solenoid + Toroid slow dump) –DSS  TGC, CSC, MDT –Magnets up again from Sunday ~14:00 –TGC restart took longer (excluded) Access Requests: –RPC: Gas system (adjust exhaust bubblers) + HV checks –TGC: Investigate ROD A12 problem Open Issues from Atlas Run Meeting: –TGC: Problems with recovery/removal timeout Problems at initialization TTC partition restart –RPC: synchronization and killed trigger sectors –CSC: DQ Agent/Gnam Crash