1 Run coordination Summary
C. Gemme – INFN Genova on behalf of Run Coordination August 16th, 2016

2 LHC Cardiogram 1. Dipole A31L2 investigations and mitigations
2172 b 2076 2173b Slow Dump of ATLAS Toroid due to electrical glitch during work on the network. 7h recovery in the interfill. 1. Dipole A31L2 investigations and mitigations 2. PS vacuum leak 2. 1.

3 LHC Cardiogram 3x3 2172b 2220 b 2220b should be the maximum this year

4 A31L2 The problem: Two “quenches” while ramping down RB.A12 from 6 kA with -10 A/s 10 June 547 A 3 Aug 295 A  The second event triggered detailed investigations. Could be explained with inter-turn short in dipole A31L2 Follow-up (Wednesday) Additional instrumentation Measurement campaign Various types of cycles evening and overnight. Thursday: analysis of measurements No sign of changes in short High current quenches and Fast Power Abort must be avoided: would destroy the magnet Mitigations: Remove global protection mechanism: implemented on Thursday and validated Reduce BLM thresholds: changed on Thursday/ Friday Increase QPS thresholds on A31L2: new board installed on Thursday and successfully validated.

5 LHC plans Plan: In discussion Continue physics with 2220 bunches
Slowly increase bunch intensity up to 1.2e11 bunch intensity Targeting restricted range for bunch flattening for LHCb (from current fill: ns  ns) In discussion Decrease crossing angle from 375 to urad  10% more luminosity, z-length of luminous region, pile-up Special fill request by CMS: low-mu running Remove week 43 for pp running to have one more week for training 2 sectors to 7TeV Luminosity levelling test already this year

6 ATLAS Week 5197 2172b 5181 2076b 5183 2173b 5187 2172b 5198 2172b 5199 2220b 5194 3b Cosmis Data taking Slow Dump ATLAS Toroid

7 Silvia Fressard-Batraneanu,
Jeremy Love TDAQ Smooth running. Patch for HLTSV available to fix occasional resource starvation. Patch pending installation, needs at least one run with high rates before putting in production Problematic Tile ROL fibres In collaboration with Tile, organizing the installation of new spares Weekly physics efficiency : 94.03% Trigger held by system

8 Pixel IBL timing IBL calibration
Marcello Bindi Pixel IBL timing IBL timing not optimal since TIM replacement after MD. Since then, running with 2BC. Special fill 5183 on Monday with Individual bunch and a timing scan of -10ns/+10ns performed. Timing constants in the TIM have been applied: we recovered most of the hits but we still seem to have a fraction of clusters on tracks from the neighboring bins. 1 BC on-time hit efficiency > 99%  1 BC in the next fill. IBL calibration IBL calibration was finally recovered after the sw upgrade during MD re-tuning needed to compensate from TID effects New version of fw for IBL and Layer2 with debugging capabilities to analyze the TTC-TIM stream Best week of the year for Pixel in term of data taking efficiency  dead-time = 0.41%

9 SCT/TRT SCT TRT In general Very quiet running.
Chiara Debenedetti, A. Bocci, D. Derendarz, A. Romaniouk SCT/TRT SCT In general Very quiet running. In Fill 5183, one problematic link not shown as removable by the shifter and not automatically recoverable. Set ROD formatter overflow limit to 1600 (>max number of hits per link to protect against non-physical patterns). deployed on Few RODs in Stable beam, ok. TRT Stable data taking DAQ: Needs also replacement of one TTC board that works correctly during data taking but fails in test pulses FastOR: Observed lower rate than expected. Caused by the change of the readout mode for high threshold bits (from Mar 2016), for three bit readout to single middle bit. May be reverted in future cosmics run.

10 L1 Calo/ L1Topo L1Calo: L1Topo Generally a quiet week for L1Calo!
Kate Whalen L1 Calo/ L1Topo L1Calo: Generally a quiet week for L1Calo! Monitoring improvements. L1Topo Test of complex deadtime with random triggers: bucket 3 changed from 7/260 -> 14/260 -> 15/260 (not deployed yet, need more testing) Muon items enabled since Saturday morning, Fill 5197 Total rate ~ 15 kHz (L1), 60 Hz (HLT) Timing checks: all algorithms are well-timed

11 Jose Benitez LAr HW An HV module (EMEC A) exchanged on Sunday due to 4 problematic channels. To be followed up if readings were correct. M167.C3 (HEC C) HV decreased due to new short HECA cell 0x3b1a5200 (tower 0x ) disabled at each run, consider if permanently disable this shaper switch Reprocessing to consider it DQ/Monitoring under test: online flagging of Mini Noise Bursts (prev. offline) added DQMD checks for PU removal: turning yellow if 1-2 PU’s are disabled, red if >2 - to complement information in Shifter Assistant

12 TILE link failure Silvia Fracchia
Repeated stopless removals of ROL ROD5 EBC33-36 (4 neighbouring modules, intolerable defect for DQ) Starting from Sunday from during stable beam, with consequent HLT problems Caused >3 hours interruption in data taking Several tests and attempts to recover it (power cycles, TTC restarts, turning off affected modules) Finally turned out to be a problem with ROD-ROS link , similar to what occurred on 13th July in LBA The fiber was eventually replaced with a working one out of two spares the substitute fiber has low optical power due to fiber end misaligned in the connector. Reflectometry measurement on Monday spot problem in the same location for the downstream links. Emergency plan: restore a spare fiber from two bad ones Short term plan: install few additional spare fibers (2 per ROD crate)

13 TILE link failure Rafał Bielski
With the Tile ROL disabled any chain trying to read data from Tile sending events to debug stream at L1 rate. 21:25 Switched to standby keys to mitigate the HLT backpressure for 40 22:00 Disabled all jet/met chains Recovery completed at 01:00

14 Muons CSC MDT RPC TGC Claudio Luci
CSC latency is now set using ATLAS latency (Instead of setting it manually and comparing it to Atlas latency) MDT RCD crash has been fixed. This was also the cause for some failed recovery. The fake chamber drop reported to CHIP by RCD is under study. RPC Access to cavern to disconnect a module from HV channel Few other cases under close monitoring and investigation. TGC new Sector Logic firmware was deployed to reduce L1_MU4 rate.

15 Other subsystems Trigger New sw release deployed on Tuesday  fine
Multiple keys deployed during the week, following LHC programs, including overnight Cosmics run decrease in TRT rate wrt earlier cosmic runs due to change in readout (March), which can be reverted for the next cosmic run Data preparation Everything is working fine on the data processing side GM infrastructure is working smoothly too Main point now is to update references: Lucid Running smoothly. Only pending issue is the automatic recovery from all SEU occurences – ongoing. BCM/BLM/DBM BCM/BLM/: Some minor hw intervention done or in progress DBM: debug and commissioning when there was no LHC running.

16 Conclusions In general smooth data-taking with increasing efficiency.
Only serious problem Tile link on Sunday evening. Next week MD2 and 2.5 km commissioning. 6/7 weeks of pp running left