Community Liaison Committee May 26, 2015 Bow Lake Wind Project.

Slides:



Advertisements
Similar presentations
Anntonette Alberti, JD Tetra Tech IPED Financing Wind Power
Advertisements

County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2012 to 2015 Board Transportation Committee November 29, 2011.
The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
TVI Resource Development (Phils), Inc. September Canatuan Tailings Management Completion of Stage 1 Tailings Management Facilties Gossan Dam and.
Partner for the Economic Development of Aboriginal People in Quebec Nature Trade and Industry Show #
May – August Highway 51 Parking Lot Project The Board of Regents approved replacing the asphalt parking lot by Highway 51 with a concrete.
Northumbrian Water Ouseburn Flooding - Brunton Park Meeting 17th January 2006.
Community Committee Woodfibre Liquefied Natural Gas (WLNG) Project Interim Report September 16, 2014.
The Christie NHS Foundation Trust Transport strategy Neighbourhood Forum - Update 28 th October 2014 Bob Higginbotham, Rosie Gill and Will Blair.
What services provide on Federal Lands? What are the challenges? Is there a need for our services?
1 Leon County Board of County Commissioners Killearn Lakes Sidewalk Construction and Traffic Calming Kinhega Drive and Deer Lake Road.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Michael Scharfenstein FAC October LCLS Environment, Safety & Health Michael Scharfenstein ES&H Coordinator.
Eligible Uses of Transportation Planning Funds SAFETEA-LU Training Webcast April 2006 SAFETEA-LU Training Webcast April 2006.
Lost Rivers Community Review September 23-25, 2014 Focus Areas Economic Development Community Design and Identity Civic Life & Community Involvement.
RECREATIONAL TRAILS PROGRAM MAUREEN NEIGHBORS, COMMUNITY SERVICES UNIT CHIEF CRYSTAL DAVIS, RECREATION AND CONSERVATION PROGRAMS MANAGER.
BLACKSPRING RIDGE PROJECT UPDATE Liaison Committee Presentation April 10th, 2013.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
Capacity Factor Summary 1. Note: Figure only includes the 20 countries with the most installed wind capacity at the end of 2007 Wind as a Percentage of.
Engineers Without Borders H&S Presentation
Britannia Village Flood Control System Information Meeting for Directly Affected Landowners February 5, 2009.
BLACKSPRING RIDGE PROJECT UPDATE Liaison Committee Presentation August 4, 2015.
Process and Lessons Learned. All content presented here, as well as supporting documentation may be found in a publicly accessible repository at the following:
Cycle Path Diversion Strategy Catford Stadium Barratt London Aldgate Author P.Willisr.
Session 131 A community profile provides a base for overlay analysis and for discussing a hazard’s impacts on a community.
SESSION 10 ASSET SEGMENT PRESENTED BY: NATIONAL TREASURY.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Low-Cost Safety Improvements Pooled Fund Study FUTURE DIRECTION Annual TAC Meeting,2007 Roya Amjadi FHWA, Turner-Fairbank Research Center.
1 Renewable Energy at Closed Landfills June 17, 2009 Jim Christo Massachusetts Renewable Energy Trust.
Alternative Energy on the Outer Continental Shelf Robert P. LaBelle Deputy Associate Director Offshore Energy and Minerals Management Minerals Management.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
TERRAMIN AUSTRALIA Limited Angas Zinc Project. Angas Zinc Project: traffic Raised as a concern through Stakeholder consultation process Dominant source.
BAXTER COMPREHENSIVE PLAN Joint Commission/City Council Meeting August 25, 2014.
Blackspring ridge project update
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
HIGHWAY DEPARTMENT Tim G. Schulte, P.E. Richland County Engineer.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Former DuPont Barksdale Works Project Update May 19, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Wisconsin Department of Transportation Emergency Transportation Operations (ETO) Plan October 16, 2008.
Protecting Communities Task Team Update Las Vegas January 14, 2009.
Working Smart for the Customer’s Benefit Pam Hutton AASHTO SHRP2 Implementation Manager June 11, 2013.
MATOC Trial Phase Dec 2008 to Jun 2009 Presentation to the Transportation Planning Board Richard W. Steeg, PE Chair MATOC Steering Committee VDOT Regional.
Gateways for Blaby Town Centre Liz Oakes Blaby Town Centre Manager Blaby District Council Sharon Wiggins Better Places Manager.
BLACKSPRING RIDGE PROJECT UPDATE Liaison Committee Presentation February 23, 2015.
April 8, 2014 Ontario Ministry of Transportation Rob Tardif Ontario Update on Border Traffic for FHWA Planning Initiative TBWG - Trade and Traffic Data.
1 PROPOSAL TO MERGE TACHOGRAPH CARD AND DRIVING LICENCE Alison Davies, DVLA, United Kingdom.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
United States/Mexico Cross-Border Long-Haul Pilot Program John Poole III, Texas 28 th Annual IFTA Business Meeting Virginia Beach, Virginia August 17,
BLACKSPRING RIDGE PROJECT UPDATE Liaison Committee Presentation July 14th, 2014.
Field Study: Cove Trail at the Home of Franklin D. Roosevelt, Hyde Park, NY Avery Cross Cove Trail is part of the Roosevelt Woods Trail (Hike F), which.
INCORPORATING INCOME INTO TRAVEL DEMAND MODELING Brent Spence Bridge Case Study October 13, 2015.
Core Strategy Dublin City Development Plan
VOWTAP Progress Report VOWDA December 2, DOE Grants VOWTAP Extension No Cost Time Extension until May 31, 2016 Conditional upon achievement of two.
I-225 Corridor Project Updates Citizens Advisory Committee June 20, 2012.
Navigation Guide Major Projects – Aboriginal Partnerships.
RCPS Transportation Department Overview Spring 2012.
Ad Hoc Fort Ward Management Plan Implementation Monitoring Group Meeting January 21, 2016.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Held on January 7, 2011 at the Indio Senior Center City of Indio Strategic Planning Retreat.
Stephanie Corley,
Board of Supervisors Quarterly Update July 2, 2014.
Planning and Realisation of Wind Farms
High Potential – Worker Injured While Resting Under the Vehicle
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
January 2016 December 2017 July 2015 June October 2014 Commencement of first contracts and site construction December 2017 Grand openning.
Lake Apopka North Shore Update
Pacific Power Seismic Preparedness Update
2040 Long Range Transportation Plan Update
Strategic Planning Timeline Overview
Presentation transcript:

Community Liaison Committee May 26, 2015 Bow Lake Wind Project

Project Update Schedule Update Project Location Project construction update Start of Operations for Phase 1 Community investment

Project Schedule DetailsSchedule Construction Surveying & Site Preparation January 2014 – April 2014 Access Road Construction & Foundation Installation May 2014 – May 2015 Wind Turbine InstallationOctober 2014 – July 2015 Commercial Operation Phase 1 – June 2015 Phase 2 - September 2015

Bow Lake Project Location

Construction Activities Phase 1 turbine installation complete Phase 1 roads and collector system complete Testing and commissioning of Phase 1 anticipated in Early June Phase 2 Road construction nearing completion Foundation work well underway Phase 2B tower installation started in mid May.

Project Activities

Foundation Construction

Turbine Transport

Phase 1 Turbine Install

Phase 1 Turbines

Road Safety Project specific construction roads are closed to the public until Project is completed Public multi-use roads on Crown Lands are open to the public - please use with caution Large construction, snow clearing equipment and logging trucks on the Crown Land public roads o MacKay Road, Hogg Dam Road, Rebecca’s Road, Trim Lake Road and Mile 67 Road Monitoring employee and contractor driving behaviour – follow posted speed limits Vehicles and ATVs should be driven on public roads with caution around project workers and equipment

Phase 1 Operations Phase 1 commercial operations anticipated to commence in June Operations staff hired and in place, one site supervisor and 4 wind turbine technicians. Operations and Maintenance building to be constructed onsite near transformer station Consultants retained to start post construction monitoring program Restoration and reclamation activities started on Phase 1 roads and construction area

Community Investment Community Investment Update Lake Superior Provincial Park Interpretive Programming and educational support. First meetings held with LSPP. Montreal River Harbour rest stop with interpretive boards o Consideration for parking area for recreational users of crown land o Consider feasibility for washrooms for highway travellers o Evaluating potential locations and feasibility Tourism enhancement – guided or self guided tours (i.e. road/trail maps and interpretive guide for ATV, Snowmobile, cross country skiing)

Contacts Bryan Tripp EMERGENCY Michael Kristiansen MasTec Renewables Construction

Questions?