Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.

Slides:



Advertisements
Similar presentations
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Advertisements

LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions.
PIP Update Oct Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken Domann.
Chris Smith Booster RF Cavity Upgrade Contents: The Booster Existing RF Cavities Why Upgrade? New Cavities Prototype Plans University Involvement Prototype.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
Tom Kubicki.  Booster HLRF System to be upgraded using 1kW Solid State Driver (SSD) Amplifiers.  Used to drive the 200kW Power Amplifier  Eliminates.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Fermilab Cavity Refurbishment Status J. Reid M. Slabaugh November 19, 2014 J. Reid 1.
Plan For Tests of PA/tube at 2 nd Harmonic Frequencies Robyn Madrak C. Y. Tan.
PIP Update July Agenda Summary Update – Budget/RLS – Current Activities – Upcoming Activities/ Changes Update Slides High-Power Ferrite TestingDennis.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW April 2015.
Fermilab Booster Cavity Temperature Measurements – 15Hz Operation January 28, 2015 J. Reid 1.
Booster 15Hz Operation John Reid March 4, Fermilab March 4, 2014J. Reid 2 Scope Brief History of Booster RF systems RF system description Modifications.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
Linac Marx Modulator Update Trevor Butler 5/20/2015.
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Booster Bias Supply Upgrade March 13, Three New Ferrite Bias Supplies Two are working and installed. One in MI station #5, one in Booster station.
All Experimenters Meeting PIP Report William Pellico on behalf of PIP team 4/7/2013.
Proton Source Water Systems Proton Source Workshop December 8, 2010 Maurice Ball.
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
Klystron Modulator for Proton Driver
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Booster Bias Supply Upgrade November 30 th, 2011.
2015 Shutdown Joe Compton 3/11/2015. RIL PIP Work  Install operational laser notcher  5 days  Dave Johnson & Todd Johnson.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Refurbished Booster RF John Reid October 24, 2012.
Refurbished Booster RF John Reid December 12, 2012.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
PIP Update July 30 th Agenda Summary Update – Current Activities/Updates – Project Controls Update: K. Domann – Linac Lattice – Valeriy Kapin.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (V. Kapin: Booster Collimator) – Additional Meetings/Notes.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Booster Bias Supply and Cavity Upgrade November 16 th, 2011.
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Proton Improvement Plan Overview Bob Webber July 13, 2011.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Alexander Valishev - Simplified Modeling of Space Charge Losses in Booster.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
PIP Update April 3 rd Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
August 2007 Booster RF Upgrades J.Reid Booster RF Upgrades West Gallery LCW modifications: – Headers in select locations to be upgraded by.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
PIP Update May 28 th Agenda Summary Update – Current Activities/Updates – Ken Domann.
New MI Cavity Progress and Plans 2010 Joseph E. Dey Project X Collaboration Meeting September 8, 2010.
Booster High Power RF at PIP-II Era John Reid February 18, 2014.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 10/06/2014.
Designing a Continuous-Wave RF Cavity for Bunch Rotation in Support of Experiments Mu2e and g-2 Aaron Smith under the mentorship of Joseph Dey Accelerator.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
In House RF Power Option John Reid December 14, 2011.
S1G Experiment Schedule Plan
RF operation of REX-ISOLDE
SNS Fundamental Power Coupler History
Klystron Power Supplies for ILC
CEPC RF Power Sources System
Presentation transcript:

Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010

Fermilab December 8, 2010J. Reid 2 Scope RF system description Booster Solid State RF upgrade project. Modifications required to achieve 15 Hz beam operation. Booster RF Cavity tuner issues Other RF reliability and equipment aging concerns. Conclusion

Fermilab December 8, 2010J. Reid 3 Booster RF Station

Fermilab RF System Description 19 rf stations installed and operational 2 of the 19 stations are upgraded with SS Drivers, newer Modulators, new 150 kW Power Amplifiers (St 12 [in2001] & St 19 [in 2005]). Only run18 stations for normal Booster operation keeping one station as a hot spare. An rf station consists of Ferrite Bias Supply, Series tube modulator, 150 kW power amplifier, rf cavity, & local station controls. 10 stations in the West Gallery run off one anode supply and 9 stations run off another anode supply in the East Gallery. Booster cavity parameters –Frequency sweep – 30 to MHz, present sweep 37 to 52.8 MHz –Q at injection (37MHz) ~ 300, Q at extraction (52.8MHz) ~ 1250 –Peak accelerating voltage per cavity ~ 50 kv December 8, 2010J. Reid 4

Fermilab December 8, 2010J. Reid 5 Installed Pair of Booster RF Cavities

Fermilab December 8, 2010J. Reid 6 Booster St 12 Amplifier New 150 kW power amplifier on station 12’s cavity Solid State Driven Station installed in 2001

Fermilab December 8, 2010J. Reid 7 Booster Cavity with support girder

Fermilab December 8, 2010J. Reid 8 Booster RF Cavity

Fermilab December 8, 2010J. Reid 9 Standard Booster Cavity Bore ”

Fermilab December 8, 2010J. Reid 10 Booster RF Downtime

Fermilab December 8, 2010J. Reid 11 Equipment # Failures Modulators Bias Supplies Power Amplifiers RF Cavity Anode Supplies Booster RF Failures by Year

Fermilab December 8, 2010J. Reid 12 Brief History Booster rf cavities were modified in the mid to late 70’s with the following upgrades: –Spark detection system. –Monolithic rf coupling capacitor with metalized interface to copper spinnings. –Tuners rebuilt using new low loss ferrite Replaced 10 Toshiba M4c21 cores with 10 Toshiba M4D21a cores. 18 Stackpole C2285 cores remain unchanged. –Cavities Tuners removed for rebuilding All components thoroughly cleaned Electrical joints tin plated Mode damper mounts add

Fermilab December 8, 2010J. Reid 13 Brief History Modulators –Relics of the past, outdated from day one. Use technology from the 50’s. –Very few PC boards, mostly point to point wiring. –Use a number of glass vacuum tubes, some getting harder to find. Ferrite Bias Supplies –Replaced original Ling power supplies with FNAL design units in the early to mid 70’s due to Ling power supply poor pulsing performance. Power Amplifiers –Consist of three sections 6 water cooled 4CW800F tubes - distributed amplifier – last ~9-12 months 14 water cooled 4CW800F tubes - Cascode ampllifier – last ~9-12 months 1 water cooled Y-567B tube – Power module – last ~ 36 months –Typical repair time for Booster Power amplifier is ~ 60 man hours

Fermilab December 8, 2010J. Reid 14 Brief History

Fermilab December 8, 2010J. Reid 15 Brief History

Fermilab December 8, 2010J. Reid 16 Brief History

Fermilab December 8, 2010J. Reid 17 Solid State Driver Upgrade Upgrade Program Build 22 new Modulators (identical to Main Injector rf). Build 22 new 150 kW power amplifiers Build 22 4 kW Solid State rf amplifiers Present Status –Received 12 frames from vendor, concentrating on completing the first four modulators. –Five solid state driver racks assembled and waiting on the completion of 1 kW rf modules. –Parts in house to assemble kW power amplifiers. –Many support modules are complete for 22 stations.

Fermilab December 8, 2010J. Reid 18 1 kW SS Amplifier Module

Fermilab December 8, 2010J. Reid 19 1 kW SS Amplifier Module

Fermilab December 8, 2010J. Reid 20 Five SS Amplifier Racks

Fermilab December 8, 2010J. Reid 21 First 4 Production F0

Fermilab December 8, 2010J. Reid 22 First 4 Production F0

Fermilab Modifications to Achieve 15 Hz Booster RF presently running at ~ 7 Hz. To satisfy proposed future demands, need to run 15 Hz. Booster rf reliability has been a significant matter for discussion over the last 12 years. –RF system never designed to accelerate beam at the sustained rates now being contemplated. –Started with the beginning of MiniBooNE operations in 2002 – NuMI/MINOS demands have greatly increased the demands on Booster. –Existing equipment > 36 years old. –Need to maintain a minimum of 900Kvolts / turn –Spare Station 19 acts as hot spare to compensate for a down station. December 8, 2010J. Reid 23

Fermilab Modifications to Achieve 15 Hz Priority I Complete the Solid State Driver Upgrade project. Study and determine the limits for ferrite cone heating sans additional cooling. Will we need to connect and repair cooling lines for 15 Hz? –This requires removing cavities and cycling tuners through a rebuilding process. –All cavities would be run through the test station and tested at a 15 Hz rate. Study and determine the limits for Ferrite Bias supply main rectifier transformer heating in the West Gallery supplies. –Propose to upgrade transformers and SCR packages with what is used in the East Gallery Ferrite Bias supplies. This also eliminates the old PVC heat sinks that leak when an LCW pressure surge occurs. Check condition & operating temperature of high power AC distribution. Finish the LCW distribution system upgrade back to CUB. Priority II Replace the East and West Gallery Anode Supply Main Rectifier Transformer. Present transformers are 40 years old. Replace Step Start 13.8kV VCB for both Anode Supplies Update select internal components and install new controls. December 8, 2010J. Reid 24

Fermilab December 8, 2010J. Reid 25 Booster Cavity Ferrite Tuner housing with Ferrites only

Fermilab December 8, 2010J. Reid 26 Tuner Cones Bare copper Castings 5 mil Cu clad stainless skins

Fermilab December 8, 2010J. Reid 27 Booster Test Station at MI60

Fermilab Other RF Reliability Issues Update HV Choke in rf cavity. Increase mode damper power dissipation (load). We are replacing all Station cables (including HV) from upstairs to tunnel during the SS Driver upgrade. Replace old rf sum balancing circuit with new global amplitude & phase regulator circuits so amplitude and phase of “A” stations and “B” stations track the request. Rebuild prototype Booster rf cavity using spare production center castings (inner & outer) to achieve a good operational spare. Start Jan 1, December 8, 2010J. Reid 28

Fermilab Conclusion Implement Global Amplitude & Phase control. Need required funds to complete SS Driver Upgrade. Study heating in the West Gallery Ferrite Bias Supply Transformers. Rebuild Booster prototype cavity. Continue to build spare tuner cones Build additional spare tuners. Install diagnostic measuring devices on a couple of the existing rf cavities in the tunnel to track thermal heating. December 8, 2010J. Reid 29