Integrated Power, Cooling, and Rack Infrastructure for Critical Networks Increase Availability While Decreasing Your Total Cost of Ownership (TCO) REV.

Slides:



Advertisements
Similar presentations
Optimizing High Density Cooling Solutions for Data Centers
Advertisements

Improving Cooling efficiency in tomorrow's data centre
On-Demand Architecture for Network-Critical Physical Infrastructure
Static Transfer Switch
Model W Wall Mount Static Transfer Switch. Why choose a model W static transfer switch? Increases power availability. Integrated maintenance bypass. True.
G.E. UPS Productline.
Setup/Installation/Operation of an Environmental Control Unit (ECU)
Dave Bradley Rick Harper Steve Hunter 4/28/2003 CoolRunnings.
Delta Confidential Apr GAIA-series 5-11KVA Introduction.
Zycko’s data centre proposition The very best products and technologies Focus on what your customers need Turning products into solutions Wide range of.
Large Data Centers Small & Medium Data Centers Computer Rooms & Closets Network-Critical Physical Infrastructure Presented by Ian P. de la Rosa Enterprise.
Cooling Product Positioning
LP33 Series UPS kVA 400Vac/CE
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
InfraStruxure for Small IT Spaces Solution Introduction.
Data Centre World Expo 2009 Designing, building and operating high density data centres Kevin Sell Head of Technical Facilities, Telstra International.
Copyright 2009 FUJITSU TECHNOLOGY SOLUTIONS PRIMERGY Servers and Windows Server® 2008 R2 Benefit from an efficient, high performance and flexible platform.
Thermal Management Solutions from APW President Systems
Computer Room Experiences A medium sized tier-2 site view Pete Gronbech GridPP Project Manager HEPIX April 2012.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
All content in this presentation is protected – © 2010 American Power Conversion Corporation InfraStruxure ™ Management Software Eduard Bodor Senior System.
CHAPTER OVERVIEW SECTION 5.1 – MIS INFRASTRUCTURE
All content in this presentation is protected – © 2008 American Power Conversion Corporation Symmetra ® LX – redundant UPS High performance, redundant.
On-Demand Architecture for Network-Critical Physical Infrastructure Large Data Centers Small & Medium Data Centers Computer Rooms & Closets David Blumanis.
Effectively Explaining the Cloud to Your Colleagues.
Motorola Mobility Services Platform
Best Practices in HVAC Design/Retrofit
Optimising Data Centre Power Planning and Managing Change in Data Centres - 28th November Cirencester.
Emerson Network Power Datacenter Infrastructure Solutions for Business Critical Continuity Many Needs, One Answer. May 28 th 2010.
ACCESS CONTROL ExpansE - Distributed Access Control.
Smart Grid: Opportunities in the Data Center January 22, 2010 Charles O’Donnell, Vice President, Engineering Liebert AC Power Emerson Network Power.
Infrastructure Gina Dickson – Product Manager Kevin Jackson – Sales Manager.
Dealing with Hotspots in Datacenters Caused by High-Density Computing Peter Hannaford Director of Business Development EMEA.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
© Copyright 2011 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. HP Restricted Data Availability.
Power and Cooling at Texas Advanced Computing Center Tommy Minyard, Ph.D. Director of Advanced Computing Systems 42 nd HPC User Forum September 8, 2011.
Key Customer ChallengesCustomer Pain Points How You can Help the CustomerProductsSolutionsServices Increasing Density Difficult to maintain 300 cfm per.
3/12/2013Computer Engg, IIT(BHU)1 CLOUD COMPUTING-1.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Row Cooling.
© 2014 Eaton. All Rights Reserved.. Eaton 93PM: Value, Benefits, and Features.
1 Powerware kVA The modular, scalable, redundant UPS for midrange applications.
GRID INDUSTRY DAY Catania – October 2006 Alessio Nava IT Division Manager – RITTAL ITALY.
Ventilation & Airflow NetShelter CX 18U,24U,38U Ambient office air is drawn in to the soundproofed air-intake chambers on either side of the NetShelter.
© 2007 Eaton Corporation. All rights reserved. Powerware ® BladeUPS Highest efficiency power protection for today’s IT environment.
Top 10 Differentiators.
InfraStruXure Systems Alex Tavakalov
93E Eaton 93E kVA UPS Sales Presentation.
© 2011 Eaton Corporation. All rights reserved. Configuring BladeUPS™
© 2013 Eaton Corporation. All rights reserved. This is a photographic template – your photograph should fit precisely within this rectangle. Eaton Power.
West Cambridge Data Centre Ian Tasker Information Services.
Setting up the Zeroth level of a Computational Grid Vincenzo Spagnoletti District Manager
Dell EMC Modular Data Centers
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
Avaya VA Line-interactive UPS
IP-based 8-port Switched Power Manager
Emerson Network Power Datacenter Infrastructure
HIGH-PERFORMANCE COMPUTING SYSTEM FOR HIGH ENERGY PHYSICS
230 Yuma Street Denver, CO (800)
PowerValue 11 RT Sales Presentation
True modular UPS system for critical applications
Maximize your availability
PowerValue 11/31 T Sales Presentation
Best-in-class modular UPS ensuring business continuity
Eaton 93PM: Value, Benefits, and Features
The Greening of IT November 1, 2007.
Powering education for next-generation leaders
Liebert DSE High efficiency thermal management

Simple, accurate tenant sub-metering
Presentation transcript:

Integrated Power, Cooling, and Rack Infrastructure for Critical Networks Increase Availability While Decreasing Your Total Cost of Ownership (TCO) REV 5: 5/5/2003 3:38 PM ™

NCPI : Overview Foundation for “High Availability” Networks

What drives data center costs? The concept of $/sqft is routinely used to describe data center cost This suggests that area drives cost, which is false. Power Cooling Service Engineering Space Improvements Racks

Benefit of compaction is not present without corresponding reduction in power $/Watt costs dominate TCO The concept of $/sqft suggests unrealistic TCO improvements via compaction

Actual power draws in real data centers

Powering high density racks Voltage, power, and connector requirements strongly suggest the use of 3-phase power distribution to the rack A 3-phase 20A power whip can provide 7.2kW per whip, with both 120V and 208V available at the same time Two or more of these whips can support extreme density

Power and Cooling infrastructure limits the area savings available from compaction Total area does not decrease after about 5kW per rack

Conclusion It is challenging to cool isolated racks >6kW or groups >4kW in conventional data centers Compaction without corresponding reduction in power consumption is ineffective and expensive A practical approach to density is to establish density limits 7.2 and 14.4 kW are natural per-rack density limit values due to branch circuit limits Where ultra high density is required, fully ducted cooling systems provide highest performance and predictability More information on these subjects is available from APC White Papers at

Agility Fact: Traditional approaches to increasing power and cooling capacity can take up to a year or more to implement, slowing business response to market. “I need a server.” “I have a server.” 2 Days “I need more capacity.” 400 Days “I have more capacity.” The Speed of Business is the Speed of the IT Response!

Traditional Approach (400 day) Design Concept Construction Design Construction Commissioning Operation Custom Parts, Applications and Services “I need more capacity.” “I have more capacity.” Needs Assessment

The Design Concept is built on standardized parts that can be scaled to meet the need? Construction Design incorporates a “Lego Block” approach of pre-engineered components? Construction is mainly done in a factory instead of on-site? Commissioning tests pre-integrated infrastructure systems. What if……

A Quick Review: The Next Generation Data Center Design is… Modular Plug and Play Scalable Fault tolerant Portable Pre-engineered Module-based mistake-proof servicing Has Built-in management based on TCP IP standards Does not require raised floor

Solutions: System Level Challenges Live system can be expanded at will. Drastically reduces one-time engineering. Collapses the Design-Specify-Purchase-Commission Cycle. Standardized, off-the-shelf, cost effective components. No services or integration “surprises.” Much of the field installation replaced by pre-assembly. Standardized documentation and operations.and operation

Link to Movie

Scalable Data Center Architecture for Infrastructure On Demand ™

Power for Closets and Computer Rooms UPS Options Summary 1 Rack: Smart-UPS – 2 Racks:Smart-UPS 3000 (XL) 1 – 4 Racks:Smart-UPS 5000 (XL) 1 – 4 Racks:Symmetra RM 6kVA 1 – 10 Racks:Symmetra 12kVA

InfraStruXure Type A: 1-10

Data Center design

Type B

5 – 100 Racks 5 – 20 Racks: InfraStruXure 20kW frame 10 – 60 Racks: Symmetra PX 40kW frame 60 – 100 Racks:Symmetra PX 80kW frame

–208V Nominal Input / Output (4-wire) –Double Conversion –Power factor corrected input –UP to 15 min Runtime (0.8 pf) with internal batteries –20kVA/kW N+1 –Up to 4 XR Battery Frames may be connected for extended runtimes –Input voltage range: 166 – 240VAC –Input frequency range: 40 – 70 Hz –Efficiency: >91.5% –Overload capability 125% overload: continuous via static bypass 150% for 30 seconds 1000% 500ms: via static bypass –Heat Dissipation = 6489 BTU/Hr (1.9kW) InfraStruXure 20kW Specifications

10-60 Racks: SYPX40 40kVA/40kW capacity in 10kVA/10kW power module increments – power factor corrected input – fully rated inverter Power modules arranged in N+1 configuration Battery modules arranged in a parallel redundant configuration All modules are hot-swappable Housed in a 35.5 ” NetShelter VX enclosure – footprint = 5.67sq ft – rolls through 7 ’ door 125% continuous rated, user replaceable static switch XR frames available for longer runtime requirements

Racks: 80KW PDU w/Bypass Housed in the VX Wide Enclosure – just 36” deep, not 42” Manual Maintenance Bypass Capable of 208V, 480V, and 600V input Contains a single 400A, (42) Position Panel board –CTO option to include up to (4) 80A sub- feed breakers to rack mount Remote Distribution Panels (RDP) Additional CTO capabilities: –Dual Feed (separate mains and bypass feed – bypass feed must be 208V) –Load Test Port connection

Symmetra PX Product Design Benefits Power View Easy to read and navigate through menus and functions Power Module Provides the flexibility to scale power capacity and adds N+1 capability Built-in Static Bypass Switch Enables the UPS to transfer the load to utility power, without interruption, in case of heavy overload or faulty conditions Redundant Intelligence Module Acts as back-up for the Main Intelligence Module Battery Module Hot swappable for easy replacement by trained user Symmetra PX

–Same XR Frame as Symmetra PX 40kW –Holds 8 battery modules –A fully populated battery enclosure will provide an ISX-20kW with 45 minutes of runtime (0.8pf) –Weight: 2100 lbs fully loaded –Up to 4 XR Enclosures can be added XR Battery Frame

Changing the way the world designs data centers… On-Demand Architecture for Network-Critical Physical Infrastructure InfraStruXure TM for Data Centers

InfraStruXure ® Systems for Data Center Scalable Cooling Air removal solutions (shown) and in-row cooling solutions enhance scalability, and allow for quick deployment and adaptation for IT upgrades Management Integration Minimize implementation time by quickly integrating your new design into existing management system Monitor Environmental Conditions Enhance the system with environmental controls for earlier detection and faster problem resolution Available Options Additional “add-on’s available, including ATS/Generator, Security, Environmental, etc. Rack Design Vendor-neutral enclosure improves adaptability for diverse IT environment

Present the Solution Standard Components Allows you to customize solution, minimize human error, and lower Mean-Time-To-Repair Integrated Cooling Effectively capture the hot air where it is created and deliver cool air where it is required. Integrated Power and Cable Distribution Self contained power and data cable distribution eliminates the need for raised floor Automatic Transfer Switch with Distribution Panel Delivers redundant power by monitoring and controlling APC’s Standby Power Generator and ATS via the network Standby Power Generator Increase runtime requirements from minutes to days

Symmetra PX Options and Related Products External Battery Enclosure Rack-based, scalable design for extended runtimes PDU with System Bypass Configurable PDU in a rack- based design Environmental Monitoring Identifies thermal problems before damage occurs Remote Monitoring Monitoring and performance trending of enterprise power and environmental infrastructure APC Global Services A variety of product based and professional services Symmetra PX

The cooling dilemma 15kW of blade servers can be purchased today and installed into a single rack. 11kW of 1U servers can be purchased today and installed into a single rack People will attempt to install this equipment (600W/sqft) in data centers where the industry average load is 1.4kW per rack (45W/sqft).

Don’t forget about availability Redundancy of cooling becomes more complex and harder to predict at higher density The Air Conditioning System must be on UPS after approximately 120W / sq ft (4kW/rack) because the IT system will overheat during the generator startup delay These are difficult technical problems which make it very difficult to reliably cross the 150W/sq ft barrier

More Problems: Dynamic Power Variation Most IT equipment draws virtually constant power independent of its computational load Early 1U servers were based on desktop technology and exhibited power that varied with function. This was the first significant exposure of the data center to dynamic power variation P4 Xeon and near term processors do not support power management. Enlightened customers and possibly public policy will dictate that processors manage power. Consequence: The data center of the future will need improved management tools to manage dynamic power variations without overload or malfunction.

High density answers that do work Careful hot-isle-cold-isle design –Properly laid out racks –Properly located returns over hot isles –Eliminating raised floor bypass leakage Blanking panels –Can reduce hotspot server intake air by up to 15 degrees F (see APC white paper #44) Limit: 3-4 kW per rack

Cooling capability limitations of the raised floor Raised floor power capability Practical Limit: 3-4 kW per rack if one tile used Single tile per rack 10 degree C rise

High density answers that do work Hot air scavenging systems –Collect hot air at the point of generation –Route directly to CRAC –Snap-on retrofit –Variable speed: as needed –Dual Path Power and N+1 –Flexible, Movable Limit: 6-9 kW per rack

Wiring Closet Ventilation Unit Airflow Diagram Wiring Closet Ventilation Unit pulls warm air from the room Warm air is exhausted from IT equipment Conditioned air from outside the room enters via intake vent Warm, exhaust air Rises Conditioned air supplied to IT equipment Wiring Closet Ventilation Unit

InfraStruXure InRow SC Airflow InfraStruXure InRow SC Cool air from plenum space pulled into unit via fans Cool air is supplied to row or room Condenser air absorbs heat from coil Heat transferred to condenser coil Heat rejected from room to plenum space Evaporator coil absorbs heat from air Hot exhaust air from IT equipment pulled into unit via fans

InfraStruXure InRow RC In-row air conditioning for medium to large data centers including high density applications. Predictable cooling solution for an unpredictable environment

Rack Air Removal Unit Rack Air Containment Airflow Diagram Fans of InRow cooling unit(s) distribute cool air to front of IT equipment Air passes through servers and absorbs heat Server exhaust air is prevented from escaping by rear containment All exhaust air is returned to InRow cooling unit(s) Proper airflow through the enclosure is ensured Top Down View Front Rear InRow Cooling Unit NetShelter SX Rack Servers Rear Containment Front Containment

InRow RC Applications Hot Spots –Server consolidation –Compaction –Peak loads Up to 30 kW chilled water  Capacity Planning  Data center expansion  Rightsizing  High Density  Blade servers  NAS storage devices  1U servers InfraStruXure InRow RC Dynamic loads –Batch processing –Grid computing

InRow RC Product Design Benefits Air Filter Removes airborne particles, protects coil Top or Bottom Piping Connections Variable Speed Hot Swappable Fans Rightsizes cooling capacity, energy savings Cooling Coil Removes heat using chilled water Condensate Management Detects and removes condensation Field Configurable 2-Way or 3-Way Valve Operation Casters Allows unit to move easily InfraStruXure InRow RC Dual A-B Power Inputs Power redundancy and protection Flow Meter Measures water flow to facilitate determining unit kW output

InfraStruXure TM InRow RC Value Proposition Modular Solution that will adapt to the changing IT world. Availability –Predictable architecture –Mean Time To Recover Agility: – Standardized modules – Capacity on demand TCO: – Capacity per footprint – Rightsizing – Increase usable IT space Changing the way the world designs data centers... Predictable Cooling Solution for an Unpredictable environment

APC Solution Applied VoIP and IP Telephony InfraStruXure Solution for Data Centers

Agility Standardized Modules –Raised Floor not required for cooling, reduces build out and eliminates space constraints –Short lead time Capacity on Demand –Matches heat removal to the heat load –Enabling variable capacity without raised floor dependency (no requirement for constant pressure) High Density Capable –Able to cool up to 60 kW in a single rack

InRow RC Summary Modular design increases agility by providing scaleable solutions to add cooling as demand increases. Improved Energy Efficiency and Rightsizing reduces total cost of ownership. Placing the unit in the row of racks moves the source of cooling closer to the heat load and minimizes air mixing thus improves availability. Up to 30 kW Capacity Predictable cooling solution for an unpredictable environment In-row air conditioning for medium to large data centers including high density applications. InfraStruXure InRow RC

APC Management Solutions Environmental Management System Environmental Monitoring Unit UPS Environmental Monitoring Card Sensors Because when something changes, you need to know. Management Tools to remotely monitor and control, easily and economically. UPS Network Management Cards PowerChute Business Edition Building Management Interface Card Management Platform Integration UPS enhancement cards  Network-Critical Physical Infrastructure  UPS Management  Environmental Management  Server Access InfraStruXure Manager Appliance Analog KVM Switches Digital KVM Switches Fliptop Monitor

InfraStruXure Manager Applications Appliance with licenses for 25, 100 or 1000 nodes. Additional licenses available. InfraStruXure Manager Data Center –Manage your APC InfraStruXure –Manage other APC devices on the network  Remote Branch Office  Monitor remote locations  Give local personnel read-only access  Distributed Network  Monitor UPS & other devices dispersed throughout the network  Network Closets  Monitor locations infrequently accessed

Manageable Devices within the InfraStruXure Management Architecture InfraStruXure Manager HTTP (Web) SNMP Telnet ModBus* APC Network Manageable Device * UPS and cooling products only Use of Standards Manage APC networked devices via existing network infrastructure. Fault Notifications or SNMP notifications ensures crucial situations are dealt with in a timely manner.

Integrating InfraStruXure Management into Your Management Architecture InfraStruXure Manager Building Management System Integration Manage critical building infrastructure from single system via modbus Enterprise Management System Integration Forward SNMP traps to your preferred management system Manage Network- Critical Physical Infrastructure Similar to server, storage and networking equipment. Scalability Manage up to 1000 APC networked devices Building Management System Enterprise Management System Network Devices Storage Devices Server Devices Server Manager Storage Manager Network Manager Building Power Comfort Air Building Environment Power Devices Rack Devices Cooling Devices InfraStruXure Manager

 InfraStruXure Manager Centralized management of your APC network-critical physical infrastructure. Appliance with 25, 100 or 1000 nodes. Additional licenses available. Network-Critical Physical Infrastructure Management Management

Left-hand bar Quick link other functions Left-hand bar Quick link other functions Main Status Screen: Overview of key functions; UPS and card Main Status Screen: Overview of key functions; UPS and card Browser Accessible Saves installing software on the network management console. Browser Accessible Saves installing software on the network management console. InfraStruXure Management Design Benefits Network Management Card Screen Shot InfraStruXure Management Design Benefits Network Management Card Screen Shot