TMB and RAT Status Report Endcap Muon OSU June 6, 2004 Martin von der Mey University of California, Los Angeles  Previous Status (OSU, April)

Slides:



Advertisements
Similar presentations
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Advertisements

TMB-RAT Software Update USCMS Slice Test Rice University August 16, 2004 Martin Von der Mey / Yangheng Zheng* University of California, Los.
Endcap Muon meeting: Florida, January 9-10, 2004 J. Hauser UCLA 1 TMB, RAT, and ALCT Status Report Jay Hauser University of California Los Angeles ALCT/Mezzanine.
TMB and RAT Status Report Endcap Muon OSU April 16, 2004 Yangheng Zheng University of California, Los Angeles  TMB Status  RAT Status.
Endcap Muon meeting: UC Davis, Feb , 2005 J. Hauser UCLA 1 TMB and RAT Status Report Outline: Current status of TMB and RAT boards Noise measurements.
Martin von der Mey, EMU at CMU, October ALCT and TMB Status Martin von der Mey University of California Los Angeles ALCT production statusALCT production.
Endcap Muon meeting: FNAL, Oct , 2004 J. Hauser UCLA 1 TMB and RAT Status Report Jay Hauser University of California Los Angeles.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
Status of the CSC Track-Finder Darin Acosta University of Florida.
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
March 2005, USCMS Trigger video meetingD. Acosta1 Revised Schedule for SP Pre-Production Continued testing of first two pre-production boards over next.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
SP04 Production Lev Uvarov RICE Muon Trigger Meeting August 27, 2004.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
CSC Muon Sorter M. Matveev Rice University January 7, 2003.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
S. Durkin, Software Review, March 16, 2006 FED Library S. Durkin The Ohio State University CSC Online Software Review, March 16,2005.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
University of Wisconsin
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
University of California Los Angeles
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
University of California Los Angeles
University of California, Los Angeles Endcap Muon Purdue
CCB to OH Tests at Rice M.Matveev Rice University May 12, 2016.
CMS EMU TRIGGER ELECTRONICS
University of California Los Angeles
ALCT Production, Cable Tests, and TMB Status
University of California Los Angeles
University of California Los Angeles
CSC Trigger Update Specific issues:
Darin Acosta University of Florida
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
TMB, RAT, and ALCT Status Report
Regional Cal. Trigger Milestone: Production & Testing Complete
Analysis of Oct. 04 Test Beam RPC Data
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
University of California Los Angeles
TMB and RAT Status Report
CSC Trigger Meeting Summary
University of California Los Angeles
Sector Processor Status Report
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Plans for the 2004 CSC Beam Test
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

TMB and RAT Status Report Endcap Muon OSU June 6, 2004 Martin von der Mey University of California, Los Angeles  Previous Status (OSU, April)  Update  Future Plans

6/6/2004 CMS Endcap Muon 2 TMB2004A and RAT2004A  Last meeting’s status:  TMB boards (32) were debugged.  RAT boards (32) were assembled, 1 debugged.  10 XC2V3000 mezzanine cards were produced for test beam.

6/6/2004 CMS Endcap Muon 3 TMB/RAT Hardware Update (April-May)  All 32 RAT boards were debugged.  Full-crate tests at OSU and Rice have been pretty successful.  Possible small firmware bug in TMB fake muon sequence to MPC (32 frames OK, 256 not)  Full Virtex-II order (XC2V4000) placed, 100/540 chips received.  New TMB Virtex-II mezz. card layout (PNPI).  Currently reviewing mezzanine card bids for production and assembly.

6/6/2004 CMS Endcap Muon 4 TMB/RAT Firmware Update (April-May)  RPC data readout simulated, debugged.  New RPC-related control and data registers.  Firmware updated for new FPGA pin-out.  Compiles without errors.  This fixes all previous problems.

6/6/2004 CMS Endcap Muon 5 TMB/RAT Testing Update (April-May)  Successful tests at UC FAST site:  New TMB firmware.  New feed-through backplane.  RAT module ALCT interface (timing changes).  Debugging updates to PCC software.  4 TMBs currently in use at X5A.  Parts shipped for RPC tests:  Rear card cage (from Wiener) arrived.  Shipped backplane that connects to RAT.  Shipped RPC Link Board-to-RAT cables (5x2m and 4x8m variants).

6/6/2004 CMS Endcap Muon 6 Future Plans I  TMB boards:  Ready to go into production pending successful beam test.  Mezzanine boards:  Components in hand except for Eproms.  Ready to go into pre-production pending successful beam test.  RAT modules can go right into production, but:  Need to see results with ALCTs and RPCs.  Need to test full pre-production backplane.  Need full crate mock-up (cable installation, strain relief, etc. issues).

6/6/2004 CMS Endcap Muon 7 Future Plans II  RPC→Link Board→RAT→TMB testing:  Link-to-RAT initial tests can be done with or without RPC chamber (connectivity test, send beam xing bits).  Cosmic ray tests of RPC→Link→RAT nearly as interesting as beam test.  A few new RPC-related TMB registers (need small update to PCC software).