1 TB/Safety Summary Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.

Slides:



Advertisements
Similar presentations
Norman McCubbin1 Report from the Collaboration MICE Project Board (CMPB) Norman McCubbin Director, Particle Physics Department MICE Funding Agencies Committee.
Advertisements

1 06/05/2015 CDM Induction for MICE Construction Phase Health & Safety Plan:
1 CDM Issues Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
1 MICE Video Conference Reception of FC magnets Andy Nichols, STFC,
1 Project Manager Report Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
Paul drumm; 3rd December 2004; AFC MM 1 Why? Goal: Ultimate (CCLRC defined) Safety & Design Review –How do we get there? We need a Process –What is needed?
1 RF Power infrastructure Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
1 Infrastructure issues Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Vacuum and cryogenic systems in R5.2 for MICE Presentation to the MICE/ISIS Operations meeting on 16/03/2015.
GREATER MANCHESTER WEST MENTAL HEALTH FOUNDATION TRUST & VOLUNTEERING
YEAR 10 WORK EXPERIENCE 7 th to 11 th July Phase 1  Students should start looking now for their own work placement.  If you receive a positive.
SHE Code 33: Safety of Pressure and Vacuum Systems Safety, Health and Environment (SHE) Group.
1 CDM Status Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Designing Public Participation in Environmental Impact Assessment Presentation & Exercise.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
System Planning- Preliminary investigation
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
Infrastructure Update As at 11 th March 2009 Remaining four plates now fitted to North shield wall North & South walls and all galleries are considered.
John Gordon CCLRC RAL Grid Operations Centre Update Trevor Daniels LCG Grid Deployment Board 10 th November 2003.
STFC SHE Group Corporate Services This code should be read by: Auditing Senior management teams across the STFC, those undertaking SHE audits and those.
1 Collaborative Provision and External Examining Nicola Clarke Centre for Academic Standards and Quality Enhancement (CASQE)
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
1 MICE PSAG PM report Brief overview Re-planning the project Solenoids, decay and spectrometer Open issues and worries Andy Nichols, STFC, PSAG, 5/5/10.
Wednesday 13 th February 2013 Ramside Hall, Durham Process Safety Management – Challenges for Implementation Allan Laing, CEO, Pentagon February 2013.
Health and Safety Executive Health and Safety Executive Competent Authority & Data Reporting HSE/DECC Consultation Events - Spring 2014 EU Offshore Directive.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
A Strategy for an Effective Accident Prevention Program
1 Preparation of the hydrogen test system Yury Ivanyushenkov for Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones CCLRC Technology.
Health and Safety Awareness High Risk Areas Session 3 Lawrence Dickson Training and Audit Co-ordinator Health and Safety Department.
Small Business Trade Association Forum Hot Topics Jill Hawthorne Growth and Business Unit, HSE.
MICE Collaboration meeting (CM20) At RAL 10 – 13 Feb 2008 AFC Magnet – Status and Progress W. Lau, Oxford University.
1 MICE CM28 Schedule & Risk Comment Schedule reconstruction and management The ‘straight to Step IV’ discussion How a schedule meeting can work Risks (and.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Welcome Return to work: part of good occupational health and safety HCHSA Toronto, Ontario February 21, 2005.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
WP2 – Strategy, governance and liaisons EuroVO-ICE– First review – 26 October 2011 Françoise Genova, EuroVO-ICE coordinator,1 WP2 Strategy, governance.
1 MICE Collaboration meeting at Berkeley 9 – 12 February 2005 Integrated Design & Safety Review Presented by Wing Lau & Paul Drumm.
Staffing and training. Objectives To understand approaches to the development of strategies and policies for staffing of a Regulatory Authority including.
1 MICE Radiation Shielding MICE Phone Conference, 28 January 2004 Yury Ivanyushenkov Engineering Department, RAL.
1 PM report Schedule comment Coupling magnets Major staffing concerns Andy Nichols, STFC, UKNF/MICE PSAG,
Workers’ Compensation Committee Agenda for December 17 th Meeting: Welcome/Introductions (7:30-7:45) Purpose of forming a Workers’ Comp Committee (7:45-8:15)
MICE CM 29 Collaboration Board Summary. Agenda 1.Intro 2.Approval of minutesBooth/Bross 3.Spokeʼs remarks & EB reportBlondel 4.PM reportNichols 5.US magnet.
P ST. LOUIS BOARD OF EDUCATION SCHOOL VIOLENCE INTERVENTION POLICY If a staff member uses physical restraint on a student, the following must be.
1 MICE CM27 PM Report Re-defining the UK project this FY Schedule things Apologies and accommodation Andy Nichols, STFC 7 th July, 2010.
Progress on Hydrogen R&D System
1 Engineering Session Summary Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
Vector INTERNAL CONTROL Mike Trigg. vector WHAT IS INTERNAL CONTROL? A key part of effective corporate governance Policies and processes to: - make operations.
1 MICE CM27 Engineering integration Andy Nichols, STFC 9 th July, 2010.
YEAR 10 WORK EXPERIENCE 8 th to 12 th July  Phase 1  Students should start looking now for their own work placement.  If you receive a positive.
Progress on Hydrogen R&D System Yury Ivanyushenkov on behalf of Elwyn Baynham, Tom Bradshaw, Mike Courthold Matthew Hills, Tony Jones MICE Collaboration.
1 MICE RLSR Summary of Issues Relating to Question One of Review charge ‘ Given a resource-limited, year-by-year schedule for the project, how reasonable.
Safe roads, Reliable journeys, Informed travellers “how the HA is addressing the needs of safety in future maintenance and construction within the design.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
1 MICE CM29 Engineering Summary Cooling channel moving platforms – Norbert Floor Beams and plates – Andy L Magnetic modelling – Mike RF Engineering – Andy.
Learning Disability Partnership Boards in the North West March 2012.
Attendance Case Management Support – HR Direct
MICE CM28 Engineering Session Summary (On behalf of Wing)
GARD Meeting Beijing Formulate and Adopt Policy WG 3: Diagnosis of CRD and Allergy
SHE Code 33: Safety of Pressure and Vacuum Systems
Culture Transformation Framework (CTF) for the South African Mining Sector Industry Workshop for HR Practitioners on the MOSH Adoption System Glenburn.
Always use the right means of access for working at heights jobs
Instrument PDR Summary of Objectives
This code should be read by:
Neopay Practical Guides #2 PSD2 (Should I be worried?)
Audit.
Presentation transcript:

1 TB/Safety Summary Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009

TB/Safety Summary Need for safety discussion: –MICE-ISIS Safety Management meetings are held regularly –They are the de-facto top level safety forum –But we were understandably told not to use them for detail project safety discussion –We had two accidents, one lost time, so we are now on the HSE’s radar – we were asked to tighten up –So the Technical Board’s remit is expanded to include project Safety policy –New members: John Alexander – PPS Mike Courthold – Cryogenic systems Willie Spensley – CDM Matt Dickson – independent (STFC H&S representative)

TB/Safety summary The existing CDM regime will continue in the MICE hall for the life of Phase Two –But much of the phase two-specific hardware needs specialist safety consideration outside the CDM –This will be formulated by the TB at monthly meetings –A formal report is then submitted to the MICE-ISIS Safety Board MICE users need to co-operate with the TB on all matters of safety –Early indication of risks/procedures/hazards should be given so that risk assessments can be made effectively –Not too much is impossible as long as it’s understood and written down and the right people and procedures are involved! –Willie or Andy are the contact people