1 MICE Hall Layout MICE Collaboration Meeting, LBNL, February 12, 2005 Paul Drumm for Yury & the RAL team.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

MICE: Hall Infrastructure Chris Nelson CEng CM15 8 th June 2006.
1 MICE Hydrogen System Elwyn Baynham, Tom Bradshaw, Iouri Ivaniouchenkov RAL MICE / RAL Safety RAL, 30 October 2003.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
1 MICE at RAL MICE Collaboration RAL, 2 November 2003 Elwyn Baynham, Tom Bradshaw, Iouri Ivaniouchenkov, Tony Jones, Jim Rochford Engineering.
1 paul drumm; ; FAC-PR MICE Project Status Funding Agency Committee 19 th September 2005.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
1 RAL Integration Issues MICE Collaboration Meeting, Osaka, August 1-3, 2004 Elwyn Baynham, Paul Drumm, Yury Ivanyushenkov, Tony Jones RAL.
1 On MICE Coordinate System Yury Ivanyushenkov RAL MICE Collaboration CERN, 29 March - 2 April 2004.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
DAQ&CM Infrastructure Paul Drumm. Issue Space is running out! Power supplies, RF system –Big kit, legislation dictates space requirements (not a clear.
1 MICE Project Report, paul drumm, 9 march 2005 CM Highlights & Tasks… –Tracker base line – scintillating fibres – performance validated –TOF performance.
Paul drumm; 3rd December 2004; AFC MM 1 Why? Goal: Ultimate (CCLRC defined) Safety & Design Review –How do we get there? We need a Process –What is needed?
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
UK Costs Beam & Infrastructure Coils Tracking Detector.
Commissioning needs: K.Long. Routine: LN2 bottle: –Needs to be sited in MICE Hall or outside vault so that routine checks of contents can be made.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
1 Project Manager Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
MICE CM30 Magnetic Shielding Update Mike Courthold 6 th July
MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
MOM Report Galina Vankova RAL, MICE Video Conference.
Project manager report paul drumm CM16 October 2006.
1 Preparation of the hydrogen test system Yury Ivanyushenkov for Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones CCLRC Technology.
1 Layout and Installation MICE Collaboration Meeting, RAL, October 27-29, 2004 Elwyn Baynham, Tom Bradshaw, Paul Drumm, Matthew Hills, Yury Ivanyushenkov,
1 MICE Mtg Oct 2002 Elwyn Baynham RAL Implementation of MICE at RAL Work done in Engineering and ISIS Departments Rutherford Appleton Laboratory Contributors.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
1 MICE Collaboration meeting at Berkeley 9 – 12 February 2005 Integrated Design & Safety Review Presented by Wing Lau & Paul Drumm.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
PSI Contact PSI visit arranged for Feb 9th –Assessment of activity/contamination Possible remedial action –Seek additional equipment for solenoid Power.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Report from MICE project teams Feedback from PPRP MICE funding: various scenarios Issues  Financial year 2003/04  iMICE common fund.
1 MICE Radiation Shielding MICE Phone Conference, 28 January 2004 Yury Ivanyushenkov Engineering Department, RAL.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
Design & Safety Review Work Group meeting 10 March 2005 Progress update Wing Lau, Oxford.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Progress on Hydrogen R&D System
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
Progress on Hydrogen R&D System Yury Ivanyushenkov on behalf of Elwyn Baynham, Tom Bradshaw, Mike Courthold Matthew Hills, Tony Jones MICE Collaboration.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
Tuesday 9 th January Project Status Report Project Achievements Project Schedule Issues Finance Summary Risk Register Photos.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
Overview of On-going Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005.
1 Implementation at RAL Iouri Ivaniouchenkov on behalf of Elwyn Baynham, Tom Bradshaw, Tony Jones, Jim Rochford Engineering Department, RAL MICE Collaboration.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
Integration Group Summary
Presentation transcript:

1 MICE Hall Layout MICE Collaboration Meeting, LBNL, February 12, 2005 Paul Drumm for Yury & the RAL team

2 Hall layout Beam line shielding layout PSI solenoid infrastructure layout Plans  Access to MICE & ISIS running Scope

3 Layout (plan view) Drawing by Tony Jones

4 Layout (elevation view) Drawing by Tony Jones

5 Layout (cross-section view) Drawing by Tony Jones

6 MICE module max height Concrete aperture Important: The max height from the bottom of the frame to the top of a module should not exceed 3200 mm Concertina door Hinged door Max opening 3200 mm Max opening 3360 mm

7 MICE and beam line shielding Consultations with ISIS Radiation Safety Officer: Implemented: Beam line radiation shielding: - Roofed block house;no - Labyrinth –type entrance;yes m of steel m of concrete in the direction of the beam;yes - Temporarily shielding block (1.5 m of steel m of concrete)yes + 1 m of concrete (very recent demand) );not yet - Beam stopper.Yes(!) MICE radiation shielding: - Shielded doorsyes - Room for possible shielding for ISIS ion source hall;yes - Room for possible shielding for ISIS control room yes

8 Beam line shielding layout Shielding: Steel – 1153 tonnes Concrete – 146 tonnes Existing shielding New shielding: Steel Movable steel Concrete

9 Solenoid in test position Temporary shielding block

10 MICE and beam line shielding: Problems and solutions Problem: Very heavily shielded beam line  high cost  can MICE afford it ? But do we really need that heavy shielding ? Solution: Calculate doses in the MICE hall for the worst scenario case Optimize the shielding Discuss the issue again with ISIS Safety Officer

11 PSI solenoid infrastructure Magnet preparation for shipment : - New nose piece and temporary lead shielding (design completed). - Need to agree few technical issues for transport with PSI. Cryogenics - layout (suggested) - specs (ready) Site for compressor (suggested) Support structure (conceptual design completed)

12 PSI solenoid nose piece Nose piece to be replaced New temporary lead cover to be added

13 PSI solenoid nose shielding cover Drawing by Matthew Hills

14 PSI solenoid cryogenics layout He Transfer lines He Refrigerator Compressor

15 PSI solenoid support structure and shielding Concrete ISIS wall Steel shielding

16 Hall Layout: Plans Finalize shielding layout (after the agreement with ISIS Radiation Safety Officer is reached) Add RF system infrastructure Modify layout for hydrogen system Add new support system (talk by Elwyn)