Paul Drumm 25 March 2004 MICE at Project Report CERN Collaboration Meeting 29 March 2004.

Slides:



Advertisements
Similar presentations
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Advertisements

Report to JMPB Topics: Progress Hall Clearance Programme Hall Layout Beam Line RF Power System MICE Management Structure Common Funds 14 th October 2003.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
Paul drumm daq&c-ws august/september Cooling Channel.
1 paul drumm; ; FAC-PR MICE Project Status Funding Agency Committee 19 th September 2005.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
Project Report Paul Drumm CM15, FNAL June MICE Schedule Overview First beam September/October 2007 –Shutdown from January 2007 –Eight months for.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MICE Project Status Report to the Funding Agency Committee 19 th September 2005 Paul Drumm MICE Project Manager.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
MICE Engineering Integration Update August 13, 2003 Edgar L. Black IIT.
Report from meeting Hydrogen system operation from cryocooler and level control Cryocoolers for MICE Tom Bradshaw Elwyn Baynham Yury Ivanyushenkov Rutherford.
MICE Project Report Paul Drumm ~ Sunday August 1 st 2004.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Controls Review  Want to record a full configuration of the experiment at every possible “event”, including controls data.  Event trigger = accelerator.
Paul Drumm 30 March 2004 MICE at RF Power System: power source, distribution Paul Drumm RAL Ambitious title!
K. Long, 26 June, 2015 Phase II: introduction to discussion Background (reminder) Responses Assumptions Presently planned bids Input to summary table Summary.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Paul drumm; 3rd December 2004; AFC MM 1 Why? Goal: Ultimate (CCLRC defined) Safety & Design Review –How do we get there? We need a Process –What is needed?
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
UK Funding PPRP Meeting on Monday 30 th June Accepted need for urgent work this year –no discussion on this –but also no indication of the level of funds.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
Integration March 18, 2004 Latest MICE integrated lattice layout Edgar L.Black IIT.
1 paul drumm; ; FAC-PR MICE Project Status Report to the Funding Agency Committee 19 th September 2005 Paul Drumm MICE Project Manager.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
RF Cavity / Coupling Coil Module
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
MICE Status (with a UK slant) Paul Drumm, MICE Collaboration UK-NF June 2003.
Project manager report paul drumm CM16 October 2006.
Executive Board Meeting Roy Preece 23rd May 2014
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
1 Layout and Installation MICE Collaboration Meeting, RAL, October 27-29, 2004 Elwyn Baynham, Tom Bradshaw, Paul Drumm, Matthew Hills, Yury Ivanyushenkov,
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
1 MICE Collaboration meeting at Berkeley 9 – 12 February 2005 Integrated Design & Safety Review Presented by Wing Lau & Paul Drumm.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
1 MICE Radiation Shielding MICE Phone Conference, 28 January 2004 Yury Ivanyushenkov Engineering Department, RAL.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
MICE CMPB Alain Blondel 1 Highlights on MICE.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
MICE – Video conference Alain Blondel, 17 December   MICE selected NEWS: Future meetings Safety review Study of controls Gateway I & Toward Gateway.
WBS ? Proposed by IPRP … –Preparation for a review –MICE Costs & Time Scales need to be more accurate & Justified –Technical Leaders arranged by technology.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
MICE RF Power Status Paul Drumm ~ Sunday August 1 st 2004.
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
Schedule and Milestones Colin Whyte STFC RAL Resource Loaded Schedule Review 5 th April 2016.
MICE CM31 Schedule summary
Presentation transcript:

Paul Drumm 25 March 2004 MICE at Project Report CERN Collaboration Meeting 29 March 2004

Paul Drumm 03 Mar Purpose of this talk Achievements Issues - not a MICE Review –Technical Issues –People Issues –Money & Schedule Issues What we need to achieve this week

Paul Drumm 03 Mar Achievements Absorber Review –Significant – doing this right! –Considerable Effort Collaboratively successful US/UK/JP –Result - Highly Successful –Must not lose sight of Safety Issues Gateway Review (UK) –Survived! another hurdle to come ~ Oct? US Funding Review (mid-May)

Paul Drumm 03 Mar Achievements… Tracker RAL –Yet to be concluded with final reports –Results in line with expectation New Collaborators from Daresbury –Expertise + Facilities (no extra cash) Technical Progress Since last October…

Paul Drumm 03 Mar Technical Board Chair: –Drumm Cooling channel: –Zisman Detectors: –Bross –Palladino Simulation/Software: –Torun Integration: –Ivanyushenkov (secretary) –Black Safety: –Baynham Ex officio: –Kaplan –Blondel 7 meetings (1 abortive) Every two weeks by phone Agenda & Minutes: “The Technical Board oversees all aspects of the experiment and infrastructure design, time schedules, construction, cost, installation and computing matters. It serves as an advisory body for the Executive Board.” It will identify issues; It should not try to solve problems during the phone meetings but delegate to the experts and later discuss their conclusions; It will manage the change process;  Action List Meet every 4 weeks after collaboration meeting Suggest this for Integration and Executive Boards too!

Paul Drumm 03 Mar Issues Raised Magnets –encouraged MG/PF/EB discussions –stay clear & optical configuration Cryo-cooler option –discussed; assessed; agreed to consider; –Will be a big issue at this meeting… Cooling Channel –No obvious big issues; is Hydride Bed a risk? Detectors –Shielding needs – exercised change control Integration Issues –Integration group – EB, PD, MZ, ABr, YI Help separate integration from “local” issues Alignment and Survey Methods –Discussions between physics and engineering Noted Issues of control, instrumentation and monitoring

Paul Drumm 03 Mar Magnets & Magnetic Fields Issues being examined: –Coils –Currents –Forces –Shielding - detectors/people –Thrown into turmoil (blame Mike Green!) Not time to react to this situation…

Paul Drumm 03 Mar Cooling Channel AFC –Schedule –WBS, Costs Interfaces –AFC – Cavity Module - RF –Hydrogen - AFC – Tracker …cryocoolers…

Paul Drumm 03 Mar Cryocoolers Issues are –Central plant: Infrastructure cost £2M (loaded) Absolute cost! Devastates cash flow! Bulk of cooling is in the transfer lines –Cryocoolers: Part of equipment: £0.75M (loaded) Compact, distributed, scaleable Lower power consumption – less plant Cooldown is long (unless) – supplement cooling power with LN2 –Meeting of magnet designers No decent; encouraged; Need to look at Absorber cooling –VLPC cryostat benefits Cryocoolers appropriate for 8K Issue to be raised at Collaboration meeting –Introduce concepts –Get general approval for this as the new cryogenic baseline

Paul Drumm 03 Mar Detectors ToF –best placement Cherenkov –US –DS Calorimeter Tracker – SiFi –Interfaces; –Beam diffuser

Paul Drumm 03 Mar Integration Consider Details: –Trivia – 220 V, 50Hz –Pumps – can we standardise? –Installation Plan –Survey & Alignment Systems –Serious (e.g.) vacuum chamber = pressure vessel Design reviews…

Paul Drumm 03 Mar Layout Best use of space in hall / roof –Work in progress… X-ray shielding – access – equipment – people

Paul Drumm 03 Mar RF Issues Clearly this is more in the air than any other part of MICE : –How to provide 8 MW? including drivers, low level RF HT supplies, controls –How to configure ? –How much will it cost ? and –Who has the funds?

Paul Drumm 03 Mar Alignment What does MICE need? –Bravar et al… Typical engineering standards? –Lau… Typical setup alignment? –Yury…

Paul Drumm 03 Mar WBS Is available on the web – – – and a summary of costs: – –All dated this Sunday morning…

Paul Drumm 03 Mar Milestones & Phases 2004: –ISIS Shutdown no longer on critical path because of delays in funding… “comfortable” Implies focus for RAL/UK activities LBNL 2002 Aspirations

Paul Drumm 03 Mar WBS

Paul Drumm 03 Mar Unordered Events Critical Tentative Assessment – Needs Discussion & Evaluation During this Collaboration Meeting

Paul Drumm 03 Mar Ordered Milestones Tentative Assessment – Needs Discussion & Evaluation During this Collaboration Meeting

Paul Drumm 03 Mar Costs… Tentative Assessment – Needs Discussion & Evaluation During this Collaboration Meeting

Paul Drumm 03 Mar WBS Caveats: –Schedule depends on funds! –Includes no levelling in either staff or capital –As long as we cut into ISIS this April/May; the beam line should not in itself become a critical task

Paul Drumm 03 Mar Importance of WBS Apart from justifying costs… –The basis of MICE planning –The analysis is the basis of you knowing that your resources are sufficient –How do we measure progress? –Information has to come from the collaboration

Paul Drumm 03 Mar Technical Reference Exercise As far as it got: Control, Instrumentation, Monitoring Data Acquisition

Paul Drumm 03 Mar Collaboration Meeting Tech Reference is not complete: –To review what is presented; (clearly some late changes – magnets) –To identify what is missing and who is charged to prepare it; –To identify what is agreed (or not) as the baseline

Paul Drumm 03 Mar What Else is Missing? Controls, Instrumentation & Monitoring Data Acquisition Detailed WBS & Cost review Money!

Paul Drumm 03 Mar What Next? Important that each parallel session –Considers its input to the Tech. Ref. –What information is missing and who should generate it –Does the information represent the consensus view of MICE? –As a whole Does it hang together?

Paul Drumm 03 Mar Executive board Review of base line by Executive Board –Actions for next collaboration meeting –Hopefully an easier task I’d like to thank everyone for all the hard work …