1 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ A Change in Direction.

Slides:



Advertisements
Similar presentations
Obstruction Surveys and Airport Airspace Analysis
Advertisements

Airports GIS | Update Presented to | Nebraska Aviation Symposium January 2011 Robert Bonanni, National Resource, AAS-101 Date | Wednesday: January 26,
AeroMetric, Inc. Presents: An Airports GIS Lecture Series
Presenter Todd G. Johnson, Airport Solutions Specialist September 14, 2012.
FAA Airports GIS (AGIS)
SLO – GIS User’s Group Airports GIS (AGIS) September 8, 2011 Matt Cunningham, PLS Aviation Division Manager.
Federal Aviation Administration FAA Airports Programs Update IRWA Federal Agency Update Washington, DC March 24, 2014 Rick Etter FAA Office of Airports.
Program Management Office (PMO) Design
Ken Jacobs Airport Planning & Environmental Division March 3, 2010 Federal Aviation Administration Federal Aviation Administration 33.
Presented to: By: Date: Federal Aviation Administration Properly Aligning your ACIP for the annual planning meeting 2014 Annual ACA Conference Patrick.
1 Federal Aviation Administration Airports GIS and electronic ALP March 5, 2009 FAA | Airport Engineering -and- FAA | National Planning Division Airports.
Airport Obstruction Standards Committee (AOSC)
State Grants For California Airports Gwyn Reese, Aviation Funding Specialist Caltrans - Division of Aeronautics September 2006.
Electronic Airport Layout Plans - “eALP” ACA, September 15, 2010 Kevin Shirer, AAE.
Presented to: By: Date: Federal Aviation Administration PASSENGER FACILITY CHARGE PROGRAM UPDATE 29 TH Annual Airports Conference Sheryl Scarborough, FAA.
Hershey Conference March 2008 Federal Aviation Administration 0 Hershey Conference March 2008 Federal Aviation Administration 0 Conducting Studies For.
Recent Lighting and Marking Design Challenges/Trends
OHIO AVIATION ASSOCIATION April 22, WELCOME AND INTRODUCTIONS Dave Dennis – Aviation Planner, ODOT Office of Aviation; Project Manager for Focus.
Airport Planning. errata Traditional forecasting techniques are still in play, but are considered archaic. US airlines are focused on international travel.
Federal Aviation Administration Next Generation Air Transportation System (NextGen) Briefing to COMSTAC Kelvin Coleman May 16, 2008.
Overview What is AGIS? Transition Policy Imagery
1 Federal Aviation Administration Airports GIS Program March 10, 2009 FAA | Office of the Associate Administrator of Airports (ARP)  ARP | Airport Safety.
1 Federal Aviation Administration Mid Term Architecture Briefing and NextGen Implementation 1 Federal Aviation Administration Mid Term Architecture Briefing.
By: Date: Federal Aviation Administration U.S. Aeronautical Information Management (AIM) Modernization Update on digital Federal NOTAM System Brett Brunk.
Presented to: By: Date: Federal Aviation Administration SAFETY MANAGEMENT SYSTEMS An FAA Update 32 nd Annual AEA Airports Conference Keri Lyn Spencer,
Henry Felices Hershey PA March 5, 2009 Federal Aviation Administration Overview of the Airport Safety Data Program.
Federal Aviation Administration Presented to: Pennsylvania State University 2010 Airports Conference By:Al Larkin, Project Manager for Non- Destructive.
Presented to: By: Date: Federal Aviation Administration What Does the Asset Study Mean for California Airports? Robin Hunt and Patrick Lammerding September.
Presented to: By: Date: Federal Aviation Administration Changes in Reimbursable Agreements 31 st Annual Airports Conference V Thompson & R Farrell, Lead.
Presented to: Aerospace Control and Guidance Systems Committee By: Stan Pszczolkowski, Manager, System Analysis Division Date: March 1, 2006 Federal Aviation.
Caltrans Division of Aeronautics Grants and Loans Tony Sordello, Caltrans - Division of Aeronautics September 12, 2012.
Federal Aviation Administration Rick Etter Airports Acquisition Specialist FAA, Office of Airport Planning and Programming International Right-of-Way Association.
October Prop K Strategic Plan & 5-Year Prioritization Programs Presentation to the Citizens Advisory Committee October 24, 2007.
Federal Aviation Administration Advisory Circular 150/5370-2F Operational Safety on Airports During Construction Presented to: Eastern Region 35 th Annual.
Focus Points Airport Layout Plan (ALP) Overview ALP Guidance
Presented to: By: Date: Federal Aviation Administration 2012 ACA Annual Conference David F. Cushing, Manager, LAX-ADO Wednesday, September 11, 2013 Construction.
1 Federal Aviation Administration Airport Improvement Program Program Status and Key Issues and Policies Presented to: Eastern Region Airports Conference.
DEVELOPING REGIONAL SERVICE PLANS: AN OVERVIEW EAST TEXAS MEETING October 6, 2005.
ADOT Multimodal Planning Division Planning Assistance for Rural Areas (PARA) Program Overview December 4, 2013.
Presented to:FAA field personnel By:AOSC Date:February 17, 2006 Presented to:FAA field personnel By:AOSC Date:February 17, 2006 Federal Aviation Administration.
Presidential Memorandum on Managing Government Records Paul Wester Chief Records Officer for the U.S. Government National Archives and Records Administration.
Disclaimer: The views expressed here do not necessarily represent those of the Federal Aviation Administration. Integration of Human Factors in the NextGen.
Presented to: By: Date: Federal Aviation Administration Automating Project Data Submittals Setting Expectations FAA Airports (AEA) Conference Cameron Bryan,
Steve Gay - GIS Manager Mid America Regional Council Kansas City, MO.
Federal Aviation Administration Rick Etter Airport Acquisition Specialist FAA, Office of Airport Planning and Programming (202) ,
Federal Aviation Administration 1 Eastern Regional Conference March 2, 2011 Hershey, PA Office of Airport Planning and Programming Airport Improvement.
Federal Aviation Administration 0 0 FAA Hot Topics Reauthorization, Continuing Resolutions and Environmental Issues Federal Aviation Administration Presented.
State Safety Inspections and Sponsor Expectations.
Regional Planning Meetings 2005 Capital Improvement Program Overview Presented by Steven Cooks, Airport Planner.
Federal Aviation Administration NextGen Environmental Management System (EMS)
NOAA Aviation Safety Board Meeting May 16, 2006 Lieutenant Commander Debora Barr NOAA Aviation Safety Program.
Joint Planning and Development Office (JPDO) Col Mark Weadon Air Force Weather Deputy for Federal Programs May 17 th,
1 Geospatial Line of Business Update FGDC Coordination Group April 14, 2009.
Federal Aviation Administration Update Topics 1.FY 16 AIP 2.New Compliance Philosophy 3.SMS 4.Airports GIS 5.Competitive Consultant Selection 1.
Presented to: Emerald Coast Transportation Symposium By: Terry Washington, P.E. Regional Capacity Manager – FAA Southern Region Airports Division Date:
Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports.
NASA ARAC Meeting Update on Next Generation Air Transportation System May 3, 2005 Robert Pearce Deputy Director, Joint Planning & Development Office.
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
SPC Advisory Committee Training Fall 2015 Institutional Research President’s Office SPC 10/9/20151.
Federal Aviation Administration Office of Runway Safety
Technology Services – National Institute of Standards and Technology Implementing the National Technology Transfer and Advancement Act in the Federal Government.
Presented by Eliot Christian, USGS Accessibility, usability, and preservation of government information (Section 207 of the E-Government Act) April 28,
National Geospatial Advisory Committee NGAC Action Plan Discussion October 16, 2008.
STREAMLINING STORM WATER PERMIT IMPLEMENTATION THROUGH USE OF AN INFORMATION MANAGEMENT SYSTEM April 8, 2004 Presented by John W. Hart 30 th Environmental.
Leadership Guide for Strategic Information Management Leadership Guide for Strategic Information Management for State DOTs NCHRP Project Information.
1 Transportation FY 2014 Sources - $ million  General Fund - $4.496 million  Transit Funds - $9.739 million  Parking Funds - $ million.
Federal Aviation Administration Oklahoma Airport Operator’s Association Reimbursable Process Planning & Requirements Group National Airspace System Planning.
PRIIA 305 Technical Subcommittee Systems Engineering Processes for Passenger Equipment Acquisition and Life Cycle Support Presented at: NGEC Executive.
State Safety Inspections
Where We Are OVERVIEW Lesson 1: Course Overview
Presentation transcript:

1 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ A Change in Direction Airports GIS | Update and Transition Policy Presented to | 34 th Annual Airports Conference – Hershey, PA Gil Neumann | FAA Airports - National Planning & Environmental Division Date | Wednesday: March 2, 2011

2 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Why Did FAA Create Airports GIS?  Federal mandates from the President and OMB ‣ Executive Order (April 11, 1994) ‣ OMB Circular A-16 (issued 2002; revised 2010)  Improve Efficiencies ‣ Airports, FAA, consultants ‣ Single, authoritative, accessible data source  Reduce Costs to all Stakeholders  Improve Safety ‣ Increased need for real-time data accuracy  Support Next Generation of Air Transportation (NextGen) ‣ A repository of airport information (not just survey data)  A true paradigm shift in the way we do business… in the right direction: it’s all about the data!

3 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Airports GIS | Multiple Stakeholder Perspective  FAA | Air Traffic Organization (ATO) ‣ ATO owns and operates the National Airspace System (NAS) ‣ ATO needs accurate, safety-critical (runway ends, NAVAIDS, obstacles) data from airport operational environments ‣ LPV/WAAS efforts well underway (limited interest in non-operational airports data)  ATO’s Office of Aeronautical Information Management (AIM) ‣ Tasked with building FAA’s data-sharing environment and infrastructure ‣ Initially developed Airports GIS and eALP ‣ Air Traffic -centric  FAA | Office of Airports (ARP) ‣ FAA’s stewards of airports data ‣ ARP manages programming of funds for the Airport Improvement Program (AIP) and Passenger Facility Charges (PFCs) ‣ AIP funds must benefit airports (limited off-airport data collection boundaries) ‣ Currently develop Airports GIS (programming, survey/GIS standards, and policy) and the eALP module  Airports (aka, Airport Sponsors) ‣ Communities own and operate airports ‣ Must meet FAA grant requirements ‣ If you’ve seen one airport… The intriguing challenge of Airports GIS: complexity is added to system development, system ownership, and funding of data collection/maintenance because airport data- sets provide benefits that support differing operational missions within the FAA LOB’s (primarily ATO and ARP) as well as data needs of thousands of airports sponsors! Airports GIS

4 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Airports GIS other modules other modules Planning Module Planning Module Airports GIS Airports GIS O U T P U T Survey Data Collection Airports GIS at a High Level NFDC | eNASR data Remote Sensing Ground Surveys $ Natl Flt Procedures data iOE/AAA data electronic ALP Module eNOTAMs Module * NAVAIDS records/data ** Airport Design Module ** 139 Inspections Module ** Misc Financial Modules ** Compatible Land Use Module ** Misc Engineering Modules ** Misc Environmental Modules ** Aerial Photos Airport Planning 5010/NASR Data * Airport Ops | NOTAMS * Data | Other Agencies ** New Tech | LiDAR/GPS ** Data Transformation Reduced Redundancy Reduced Costs * In Development | ** Planned I N P U T Data Standards Collection Input AC150/ ,- 17,-18

5 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ ARP’s View of Airports GIS Benefits and Challenges  Airports GIS will help airports by providing standardized data to support airport construction, land-use planning, environmental compliance, categorical exclusions, recording of NAVAID records, 3-D visualization, and integration into other GIS efforts (airport department-wide; local, State, and federal govt-wide)  How valuable is your data? ‣ Think about how all airports data constituents currently reference and use geospatial data/maps related to: Grant review and approval Project eligibility requirements Master Plans/ALPs Obstruction Evaluation (OE) Database/Airspace determinations Runway Safety Area determinations Environmental/NEPA Design review Conformity to plans and specifications (as-builts) Safety and construction phasing Compliance/grant obligations Compatible Land Use Land acquisition  FAA’s funding challenge: AIP $ can only benefit airports ‣ How far off the airport property should we collect data? ‣ Will ATO allocate F&E funds for obstacles well beyond airport boundaries? ‣ Who pays for maintaining the data? FAA? Airport? Both?

6 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ NextGen | Can you see the connection to Airports GIS data?      Airports GIS I N P U T OUTPUTOUTPUT

7 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Airports GIS | End State Other Modules Planning Module Airports GIS FAA LOBs Agencies Industry Airports APPLYPUBLISHUSECOLLECTSTORECHECK SYSTEMDEPLOYMENT Strategic Implementation Plan MANAGE DATA COLLECTION

8 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Airports GIS | Reality/Today Planning Module Airports GIS FAA LOBs Airports APPLYPUBLISHUSECOLLECTSTORECHECK Development/Deployment Perspective: ATMs; PCs; FAX; Internet; ; mobile phones; Google Earth

9 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Airports GIS | FY09-10 Accomplishments  Emphasis on Survey Standards (Advisory Circulars) and Airports GIS website ‣ 800+ projects in the system (includes LPV/WAAS)  Airports GIS Programming (software, website, modules) ‣ Completed electronic ALP proof-of-concept (Sept 2009) ‣ Transitioned from AIM to ARP (Fall 2010) ‣ Deployed -18B schema templates (DWG, DGN, and SHP)  Outreach (on-going) and Training ‣ Deployed web-based training (IDLE), FAQs, and Airports GIS Help Desk ‣ ACC, ACI, AAAE, FAA conferences and workshops ‣ Initiated: external training (ACC); internal training (6 Regions by end of CY10)  Initiated robust data collection/input efforts ‣ Phase I – 7 Airports (SW and SO Regions); Phase II – 30 Airports (All Regions) ‣ Increasing emphasis on Airports GIS deliverable for all projects ‣ AIP Grant/PFC requirement to incorporate on virtually all projects ‣ Obstruction surveys, construction projects, noise contours, land acquisition ‣ “Tiger Team” deployed to reduce data verification delays  Issued Working Draft Guidance (see National Planning Website) 06/24/10 ‣ Draft Strategic Plan created and in review (includes preliminary BCA results) ‣ Draft Transition Policy in review (target for implementation in Jan 11)

10 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Airports GIS | FY2011 Priorities  Implement Transition Policy* in January and finalize the Strategic Plan  Business Case (and begin tie-in with other LOBs, starting with AIM)  Data Collection ‣ Complete Phase I pilot program; marked progress on Phase II ‣ Fund additional robust data collection projects at high priority locations  Address Growing Pains >>> see next slide ‣ Streamline data verification process (review: plans; control; imagery; data) ‣ Improve website software and project flow (project/partial vs. airport-centric) ‣ Complete deployable eALP module precursors (programming; beta-testing) ‣ Incorporate lessons learned from pilot projects into Advisory Circulars (for updating in FY2012) and programming  Outreach and Training (on-going) ‣ Integrated Distance Learning Environment (IDLE) ‣ Continue additional internal/external workshops and outreach efforts ‣ Explanation of ROIs to airport community (from FAA field personnel) ‣ Begin planning for resident training course at FAA Academy * Includes the updated Airports GIS Implementation Guidance (working draft)

11 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Airports GIS | Addressing Immediate Challenges APPLYPUBLISHUSECOLLECTSTORECHECK Airports GIS FAA LOBs Airports Enhanced data verification process Improved Web Portal Cost Drivers; Timing eALP beta Transition Policy (for all Airport categories)

12 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Airports GIS Transition Policy | Premise Airports GIS ACs were applied too broadly too quickly  Estimated 4,000 projects per year (staff is already very busy)  One size of requirement does not fit all project types  Industry and FAA have a steep learning curve  Airports GIS system and processes not ready to handle demand  ACs have kinks that need to be worked out Transitioning is the key to realizing program (and NextGen) benefits  Program requirements need to be transitioned in practically  Phased in to airports by size and relevance to NAS  Enforce compliance as appropriate by project  Improve awareness, education and support

13 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Transition Policy* | Immediate Steps  During the transition period, if a survey is required for a project involving safety- critical data, ACs 150/ , -17, and -18 must be used ‣ Any change to safety critical data: new/lengthened runways, procedure design, obstruction analysis ‣ Master Plan updates (which requires an eALP) ‣ Obstruction surveys to develop new or change existing instrument approach procedures  For other projects not involving safety-critical data, airports must incorporate Airports GIS requirements on the following schedule: ‣ Large/Medium Hubs: Now (FY 2011)* ‣ Small/Non Hubs: 1 year (FY 2012) ‣ Top Non Primary: 2 years(FY 2013) ‣ Middle Tier GA: 3 Years(FY 2014) ‣ Lower Tier GA: 4 Years(FY 2015)  If a survey is not required, project deliverable data must be submitted in paper format, at a minimum, as acceptable to the FAA (in other words: the way we operate for these projects today)  Airports are encouraged to initiate their transition to Airports GIS in advance of the timelines set forth above, as appropriate * issued (with and within updated Airports GIS Implementation Guidance) on January 14, 2011

14 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Looking Forward | eALP Transition ‣ Airports GIS data collection and submittal ‣ Sponsor/FAA access to data through Airports GIS ‣ Legacy ALP (paper or PDF) ‣ Legacy ALP coordination and approval process ‣ Airports GIS data collection and submittal ‣ Sponsor/FAA access to data through Airports GIS ‣ Electronic Signatures (submittal and approval) ‣ eALP (geo-referenced PDF) with legacy ALP review and approval process ‣ Airports GIS data collection and submittal ‣ Sponsor/FAA access to data through Airports GIS ‣ Electronic eALP submittal ‣ Electronic eALP review and approval through Airports GIS ‣ Geo-referenced PDF (for use outside Airports GIS) Today End State Near Term Limited e-CapabilityOptimized EfficiencyIncreasing Efficiency

15 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Lessons Learned / Using Airports GIS | DFW Airport DFW: LIVE Parking StatusDFW: Flight Track Analysis  Airports GIS Pilot Program: Dallas / Fort Worth International Airport (DFW)

16 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Lessons Learned / Success Story | Harlingen, TX Airports GIS Pilot Program Success Story: Valley International Airport  Typical Airport Deputy Director  Project Cost Estimates vs. Actual ‣ Initial FAA Estimates: $50K-$100K per runway end Much less expensive after first project ‣ HRL Budget was $630K (6 runway ends) 30% for non-obstruction data collection 23% for existing data conversion 20% to assemble and test electronic ALP 18% for obstruction survey and airport airspace analysis 09% for travel, production, miscellaneous costs ‣ Actual project costs came in at approximately 65% of estimate  Immediate use / benefit (Boeing 787)  Additional tools request to consultant (SAAMS)

17 Federal Aviation Administration Airports GIS | Airport Planning in the NextGen World March 2, 2011https://airports-gis.faa.gov/ Thank You: Questions Welcome! Upcoming Workshop Airport Consultants Council Airports GIS Workshop April 3-4, 2011 | Kansas City