APD Connector and PC-Board Update NICADD Weekly Status Report Monday July 1, 2003 (Happy Canada Day!) Ian Harnarine.

Slides:



Advertisements
Similar presentations
Strategic Options. Regional Priorities. Strategic Options in a Changing Enrolment Landscape February 12, 2008.
Advertisements

BCF UPDATE. Total Funding Canada Share (75%)Yukon Share (25%)Total National and Regional Projects (90%) $230,925,755$76,975,252$307,901,007 Small Communities.
Status Update for P09321 Automatic Medicine Dispenser.
Budget Prep Budget Prep Dates Budgets will be released mid-May Budgets will be due to the Budget Office on June 18 th Budget will be finalized and.
Thermo-Cooler Controller Kiefer, Mary, Molly, Sam.
5/19/2003Manuel I. Martin Digital Hadronic Calorimeter Hardware/Electronics Status.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
K. Long, 27 June, 2015  Target K. Long, Monday, 06 July 2009.
APD Connector Update 6/9/03 Manuel Martin & Ian Harnarine Top View (mm)
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 10 June Sam Burke UCSB HEP Group.
Thermo-Cooler Controller Kiefer, Mary, Molly, Sam.
APD Connector Update 6/23/03 Ian Harnarine NICADD Weekly Meeting.
Panda PCB for prototype status report by D Malkevich on behalf of the ITEP group ITEP.
DRAFT/PRE-DECISIONAL State Home Construction Grant Program Update State Home Construction Grant Program Update Project Funding VA receives $85M program.
A.Levin, IHEP, Protvino, RussiaApril 27, nd PANDA Russia Workshop Status-report on the barrel mechanical design work. A.Levin Institute for High.
Our Experience of Person Centred Reviews of Support Plans and How These Outcomes Can Influence Future Commissioning Kate Burgess Locality Commissioning.
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
Status of the PSD (Jan. 2009) F.Guber, INR, Moscow.
 Anti-Theft Device Group 2 Will, Alex, Ken, Ryan and Savannah.
Test Dev SM 2012 SP1 SM 2012 R2 UR6 UR2 UR3 UR4 UR5 Ski p April 2014 July 2014 October 2014 January 2015 Ski p.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
CMX Production Status Presented to the L1Calo Meeting on Monday 22-Sept-2014 by Dan Edmunds for the CMX Group.
Year 7 Homework Project Week beginning Monday 22nd June Deadline Friday 3rd July.
Force. Performance. Passion. © 2014 Holcim (Canada) Inc. Flamboro Wells Project CAP Update June 23, Strength.
A Few Agile Practices Or how to plan who does what over the next two weeks when Iteration I is due C Sc 335 Rick Mercer.
Lead from the front Texas Nodal 1 Texas Nodal Critical Path Update TPTF Date xxx.
Market Bias Forecast June 2007 Copyright 2007, A New Story Foundation, Inc All rights reserved.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
Statistics 1670 components 5839 solder joints 4 routing layers 6 power planes 1858 vias total trace length 35 m dimensions 220 x mm 3 FPGA’s (1.
Purpose and Goals of the NCSX Conference Call on Modular Coil Analyses February 25, 2004 ??
WEEK 1 You have 10 seconds to name…
Activities Status and Plan for the week D. Giugni Monday Meeting
Delay Line Update 8/04/03 Ian Harnarine NICADD Weekly Meeting The Rise (time) and Fall (time) of Delay Lines.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
December Status of MRS photodiodes ND280 Convener’s Meeting, 9 June 2006 Yury Kudenko INR, Moscow.
INTEGRATED STRATEGIC PLANNING PROCESS (ISPP) 10 year planning outlook10 year planning outlook Monia Lahaie, DCFO and Director General Finance at Statistics.
GROUP MEMBERS  Hakim Ali  Arif Choudhri  Daud Abbasi  Syed Faizan Ahmed.
Nantes — 2008, July Analysis of results from EmCal beam test at CERN PS (and SPS) energies P. La Rocca & F. Riggi University & INFN Catania University.
MSD II Week 6 Update P13265: Motorcycle Safety Lighting and Portable Electronics Charging System.
27/11/02Paul Baillon wach Paris1 Heat transfer study in M0’ using the thermistors on the APD’s and on the boards.
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
18/12/2002 Status of L3 - Salvatore Mele Status of L3 Organization in 2002 Activity in 2002 Organization in 2003 Outlook Latest physics results in:
Weekly Report By: Devin Trejo Week of June 29, 2015-> July 5, 2015.
1. 2 Homework Monday, 12/7 Lesson 4.02_lesson 4.02_pg 286 #28-33, #52 ALL.
Do you know how to draw a baby chick? It is easy. Let’s show you how to draw it.
1 of 5 CONVENTIONAL FACILITIES & SITING GROUP PROGRESS OVERVIEW J.L. Baldy, A. Enomoto, V. Kuchler V. KUCHLER GDE Executive Committee Meeting
Proposed Approach to Assessing APEC’s Energy Intensity Reduction Goal for APEC Energy Working Group - Brunei 24 November 2010 Ralph D. Samuelson, Vice-President,
Fall Weather Unit Your Fall Weather Update! By: Reporter ____________.
State of Georgia RCA Process Narrative Review Training Session Aug. 09’
LHCbComputing Update of LHC experiments Computing & Software Models Selection of slides from last week’s GDB
Delay Line Update 7/28/03 Ian Harnarine NICADD Weekly Meeting Everything you Ever Wanted to Know About Delay Lines & NICADD (but were afraid to ask)

DEVRY BUSN 460 Week 7 Final Project Consulting Check this A+ tutorial guideline at
GCSE/A Level Art and Design Exam guidance and top tips
Engaging Private Forest Owners Through the Managed Forest Tax Incentive Program in Ontario, Canada Julie Kheidr.
Cal Poly’s Budget Today and Moving Forward
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
EEC FY09 Caseload Analysis – Final Report
Cal Poly’s Budget Today and Moving Forward
مديريت موثر جلسات Running a Meeting that Works
The Big 6 Research Model Step 3: Location and Access
Beginnings, Middles and Ends
NUMERACY Teacher hint: Literally, what do you see?
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Group 5 – ECE 4006: Week 13 Nihar Patel 4/6/2019.
West Point Bridge Designer
Pair work – Do you want to change seats??
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Economic Research & Extension
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10
Presentation transcript:

APD Connector and PC-Board Update NICADD Weekly Status Report Monday July 1, 2003 (Happy Canada Day!) Ian Harnarine

APD Connector/PC Board Update 7/1/03 Ian Harnarine What’s up with the Connector? A short run of the connectors has been made by Phil. There are a few concerns that need to be resolved (precision is a big issue) In discussions with Phil about the allowable tolerances for pieces. The precision issues should be cleared up (cross your fingers!).

APD Connector/PC Board Update 7/1/03 Ian Harnarine PC-Board (more evolved drawing)

APD Connector/PC Board Update 7/1/03 Ian Harnarine PC-Board (more evolved drawing)

To Do List: Estimate the tolerances allowed for the connector and get them to Phil. Final tweaks to PC-Board Preliminary consultation with Phil gives positive outlook. Get the temperature in NICADD just right! APD Connector/PC Board Update 7/1/03 Ian Harnarine