7/14/2015 1 Purchasing 1. 7/14/2015 2 Goods Receipt Pay Invoice Procurement Process Purchase Requisition Purchase Order Invoice Receipt Internal Demand.

Slides:



Advertisements
Similar presentations
Topic: Sales Tax and 1099 Reporting
Advertisements

SAP - Online Transaction Processing (OLTP)
SE 464: Industrial Information systems Most Images and inform. used in these slides are SAP © Not to be used for other than educational purposes Systems.
Is 466 Advanced topics in information Systems Lecturer : Nouf Almujally 5 – 10 – 2011 College Of Computer Science and Information, Information Systems.
Procurement Process Concepts & Theories
Accounting 4/13/2017.
Process Management and Control and Physical Inventory SAP Implementation
Material Requirements Planning Planned Orders Demand BOM Material Data Inputs Output.
Module 11 Configuration for MRP. Semi-finished Materials  Dough is a semi-finished material: ## NRG–A (case) ## Dough NRG–A (lb) ## Oats (lb) ## Wheat.
Production and Planning Master Data SAP Implementation
University of Southern California Enterprise Wide Information Systems The Procurement Process Instructor: Richard W. Vawter.
SAP R/3 Materials Management Module
Production Planning.
Module 10 Setup for Production.
Procurement Processes SAP Implementation
SAP Purchasing Prepared by Lavanya.M. Purchasing The R/3 System consists of a number of components that are completely integrated with one another. This.
Procurement Processes EGN 5620 Enterprise Systems Configuration Fall, 2012 Procurement Processes EGN 5620 Enterprise Systems Configuration Fall, 2012.
The Procurement Process
Production Logistics and ERP
Materials Management (MM)
Production Planning Processes Theories & Concepts
SAP Supplier Management EIN 5346, Logistics Engineering Spring 2010.
Configuring the MM Structures. Slide 2 Review of the Procurement Process Goods Receipt Pay Invoice Purchase Requisition Purchase Order Invoice Receipt.
Material Management (MM) Master Data & Records EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2013.
Pen Inc Introduction to Your Company
Introduction to Enterprise Systems
Istanbul Kultur University Enterprise Wide Information Systems The Procurement Process.
Phase II: Procurement SAP University Alliances Version 2.2
Production Planning Processes EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2012.
Material Management (MM) Master Data & Records EGN 5620 Enterprise Systems Configuration Spring, 2012.
© 2008 by SAP AG. All rights reserved. 1 Accounting.
Clients (and the interface level) Application Server (and the application level) Database Server (and the Database level)
Production Planning Processes EGN 5620 Enterprise Systems Configuration Spring, 2014.
Configuring Materials. Slide 2 Materials(Introduction) In general, we buy materials and services from vendors And we sell (some of) them to customers.
Material Management (MM) Master Data & Records EGN 5620 Enterprise Systems Configuration Spring, 2013.
 SAP AG 2003 Goods Receipts and Goods Issues Stock Transfers Physical Inventory Warehouse Reporting Contents: Inventory Transactions.
SAPwww.consult4scm.blogspot.com1 Account assignment category.
Automatic Account Determination
SAP Navigation EIN 5359, Spring 2009 R/3 SAP Integrated Solution Client / Server Open Systems Financial Accounting Controlling Fixed Assets Mgmt. Project.
MM Master Data & Records SAP MM Master Data and Records
 SAP AG 2007 Business partners Items and warehouses Content: Master Data.
SE 464: Industrial Information systems Most Images and inform. used in these slides are SAP © Not to be used for other than educational purposes Systems.
University of Southern California Enterprise Wide Information Systems Customer Order Management Instructor: Richard W. Vawter.
Chapter 2 Introduction to Enterprise Systems Partial adoption from Magal and Word | Integrated Business Processes with ERP Systems | © 2011 Timothy L.
Production Planning Processes EGN 5620 Enterprise Systems Configuration Fall, 2015.
The Procurement Process
Production Planning Master Data EGN 5620 Enterprise Systems Configuration Fall, 2015.
Purchase Order Creation Manually or automatically With or without reference to other documents Data Documents: Purchase requisition, Purchase order, RFQ,
 XX Consulting 2000 MM01 - Organizational Structure & Master Data in MM November, 2000.
MM - Purchasing.
SAP MATERIALS MANAGEMENT(MM) TRAINING IN SOUTHAFRICA,AUSTRALIA
Unit 3 Account Payable. Unit 3 : Account Payable Vendor Master Record Daily Accounting Transactions in AP Integration with Materials Management Closing.
 Andersen Consulting IM01 - Organizational Structure & Master Data in IM November, 2000.
 TATA CONSULTANCY SERVICES MM - INVOICE VERIFICATION.
 TATA CONSULTANCY SERVICES MATERIALS MANAGEMENT.
Overview of the Procurement Cycle 4.6fi_22.1 Procurement is a component of the Materials Management module that supports the purchase of materials and.
PP/MM Module User Training SAP 教材. Overview Organization and Business Process.
 TATA CONSULTANCY SERVICES MM - Inventory management.
SAP Materials Management (MM)
Chapter 22 Procurement Cycle and Documents
The Procurement Process
Intro to Enterprise Systems Architectures EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2012.
SAP Business Integration
Inventory Facility Need to replenish Stock Levels with more products.
Inventory Transactions庫存交易
MM03 - Master Data in Purchasing & Contract
1.
BASIC SETTINGS CONTENTS OF THE COURSE: Definition of Company
SAP Fulfillment EIN 5346, Logistics Engineering Spring 2010
SAP Master Data & Routing EIN 5346, Logistics Engineering Spring 2010
Presentation transcript:

7/14/ Purchasing 1

7/14/ Goods Receipt Pay Invoice Procurement Process Purchase Requisition Purchase Order Invoice Receipt Internal Demand Customer Vendor

7/14/ Purchasing 1  Exercise to demonstrate How default pricing is done Role of purchasing info record in pricing Moving average pricing and inventory valuation

7/14/ Purchasing 1  0. Set parameter IDs PIDs make routine use of the SAP system easier Realizing the SAP is a volume production system helps explain the rationale behind “quirky” behavior Lack of visual response (assigning vendors) Loss of data warning messages (post payment)  Accounting  Financial Accounting  Accounts Payable  Document Entry  Outgoing Payment  Post DEMO

7/14/ Purchasing 1  1. Create New Material ##P800, ## Corrugated Box (27 x 14 x 9) Search for Material using description (##*) Material Master Data Organized by views, organizational structures Create New Views Material (Number) Material (Description)

7/14/ NRG-A 110NRG-B 200Dough NRG-A 210Dough NRG-B 300Canola 310Carob Chips 320Cinnamon 330Cloves 340Dates 350Hazelnuts 360Honey 370Nutmeg 380Oats 390Protein Powder 400Raisins 410Vit/Min Powder 420Wheat Germ F S R ## R 100 Material Data Set Number Material Type 70040x48 Grocery Pallet 800 Corrugated Box (27 x 14 x 9) 810 Display Box NRG-A 820 Display Box NRG-B P Material Numbers for Fitter Snacker

7/14/ Material Master Views  Basic Data 1  Basic Data 2  Classification  Sales: Sales Org Data 1  Sales: Sales Org Data 2  Sales: General/Plant Data  Foreign Trade: Export Data  Sales Text  Purchasing  MRP 1  MRP 2  MRP 3  MRP 4  Forecasting  Work Scheduling General Plant Data/Storage 1 General Plant Data/Storage 2 Warehouse Management 1 Warehouse Management 2 Quality Management Accounting 1 Accounting 2 Costing 1 Costing 2 Basic Data, Classification are not plant-specific Other views are plant-specific

7/14/ Material Master Views Plant 1000 NRG-A Bars Base unit: Case Gross wt: 72 lb. NRG-A Bars Lead Time: 2 days Std. Price: Plant 2000 NRG-A Bars Lead Time: 3 days Std. Price: Basic Data View MRP Views Non-plant specific Plant specific DEMO

7/14/ Purchasing 1  2. Create Vendor (centrally) Accounting Master Records Purchasing Master Records Vendor Master Data Payment Terms

7/14/ Purchasing 1  3. Create PO Enter Price of $1.75 EA manually  4. Receive Goods into Inventory Specify storage location 100  5. Verify Goods Receipt Stock/Requirements List Dynamic MRP record Key OM/SCM Tool Physical Inventory

7/14/ Purchasing 1  6. Check G/L Account Balance Accounting view of inventory G/L Account : Inventory–Raw Materials

7/14/ Work Centers and Storage Locations Raw Material Warehouse (100) Mixer FormBakePack Finished Goods Warehouse (300) Snack Bar Line Production (200)

7/14/ Purchasing 1  7. Create Second PO Enter price of $1.80 EA to see impact of moving price valuation  8. Receive goods into inventory POs sequentially numbered

7/14/ Purchasing 1  9. Check Inventory in Material Master Can’t change directly Analyze moving average price

7/14/ Purchasing 1

7/14/ Purchasing 1  10. Perform Goods Issue CO module is configured Primary Cost Element defined for G/L Account Must have cost object—something to absorb costs Production order, project, cost center Issue goods to cost center P010—Production

7/14/ Purchasing 1  Movement Type 201—Consumption for Warehouse to Cost Center Movement Type—Which G/L Accounts Cost Center—Who picks up the tab

7/14/ Purchasing 1  11. Check cost of Goods Issue

7/14/ Purchasing 1  13. Create Condition (Pricing) in Purchasing Info Record Price of $1.85 used to test (PO and moving average price) Validity Period

7/14/ Purchasing 1  14. Create 3 rd PO Price of $1.85 called up from purchasing info record  15 Create 3 rd Goods Receipt

7/14/ Purchasing 1  16. Verify Moving Average Price

7/14/ Purchasing 1  17. Perform Goods Issue  18. Print Result

7/14/ Purchasing 1  Run Exercise

7/14/ Purchasing 1: Debrief

7/14/ Purchasing 1 : Debrief Cost Displayed VERPR LBKUM SALK3 Table MBEW

7/14/ Purchasing 1 : Debrief

7/14/ Finding Tables and Fields  F1 (Help), then Technical Information  Hope for Transparent Table (not Structure) and Field Name

7/14/ Finding Tables and Fields  Transaction SE11 Data Dictionary (Table Structure)  Transaction SE16 Data Browser (Table Entries) May need to select fields Need to specify which data (Material, Company Code, etc.)