GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th 4.1.9 - Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
Advertisements

GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectLAT Mgr’s meeting July 17-18, LAT Planning Meeting Mechanical Systems Marc Campell.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectLAT Face to Face, July 17-18, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT ProjectI&T/Online Workshop October 29 to November 1, 2002 R. Claus1 EM1 EGSE Configuration VME/cPCI Chassis LAT-COMM Electronics/OnlineSubsystem/simulator.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectOnline Roadmap Progress Report – April 22, 2004 R. Claus1 Online Roadmap to the July 2004 Freeze Progress report for April 22, 2004 (to.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT Project Technical/Cost/Schedule Review 03/31/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project Technical/Cost/Schedule Review 09/01/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST Large Area Telescope:
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 6 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project Technical/Cost/Schedule Review 04/26/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT ProjectI&T Face-to-Face Online Presentation – May 30, 2002 R. Claus1 I&T Online Status and Plans Ric Claus.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom1 Elliott Bloom Integration and Test and Calibration Manager
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST LAT ProjectMini-Review, 30 January 2003 LAT-PR-#####-## 1 I & T Responsibility LAT I&T, Verification, and Calibration Flow VibeRandom vibrate/sine.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectACD CDR January 7 & 8, 2003 Section 8 EGSE, Performance Monitoring, Calibration 1 GLAST Large Area Telescope: AntiCoincidence Detector.
GLAST Large Area Telescope:
I&T&C Organization Chart
Mechanical Integration
Electrical Ground Support Equipment Verification Test Support
Integration, Test, and Calibration
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
Integration and Test Organization Chart
GLAST Large Area Telescope: I & T Peer Review EGSE/Online System
Integration and Test Organization Chart
GLAST Large Area Telescope: I&T Test Readiness Review
Introduction and Overview
Overview Cost to Complete
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope: Deputy for Systems Engineering
Presentation transcript:

GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting July 17 th and 18 th Elliott Bloom SU-SLAC Subsystem Manager Brian Grist SU-SLAC Subsystem Engineer Gamma-ray Large Area Space Telescope

GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 2 Key Milestone List to Delivery (Not Necessarily in Current PMCS) EM Plan, Procedures, EGSE and MGSE Complete07/31/03 Receive CAL EM08/08/03 Receive TKR mini-tower08/22/03 EM Tower functional tests Complete09/18/03 EM Tower Available for use by Flight Software09/18/03 EM Calibration Complete10/12/03 EM mechanical fit check using 1X4 Grid, TKR Mech tower, CAL10/13/03 CAL EM at NRL Loading Doc; TKR mini-tower in Italian Customs 10/17/03 Support GSI Beam Test(CAL and TKR mini-tower)11/14/03 All I&T Flight Techs on Staff (Mechanical and Electrical)12/15/03 Flight Integration Training MGSE Ready01/15/04 All Flight Integration Procedures Complete02/15/04 All Flight Integration MGSE Complete with SDP03/01/04 LAT Assembly Configuration EGSE Ready For Use03/01/04 Integration Readiness Review03/15/04 TKR A/B Available RFI04/15/04 Grid Available RFI05/20/04 CAL A/B Available RFI05/20/04

GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 3 T&DF System (LAT)EGSE AEM CPU LCB EGSE Crate WAN Central Database GASU CAL, TKR or Sensor Simulator ACD or Sensor Simulator Online Workstation TEMs SLAC GEM EBM Firewall 28 V Supply VME Multi-Tower EGSE (9/15/03)

GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 4 AEM/TEM Single Tower EGSE Configuration (GSI test) VME Chassis LAT-COMM External Trigger Electronics/Online Subsystem/simulator Subsystem (or simulator) Ethernet Router and Firewall Ethernet Main Dataflow Ethernet Back door debug RS-232 WAN Online Workstation Test Exec Configuration Commanding Telemetry Event Processing Monitoring Visualization Data base Message logger Alerts Electronic log CPU Commanding Telemetry Monitoring Hardware Drivers Central Database DC Power External Hardware

GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 5 Key Milestone List to Delivery After Start of Flight I&T (Not in Current PMCS) Start Tower A/B Installation/Test05/20/04 Start Tower 1/2 Installation/Test07/01/04 Start Tower 13/14 Installation/Test10/28/04 Finish Tower Installation/Test11/11/04 Finish Installation of ACD/ELEX/X-LAT12/23/04 Flight Configuration Ready for System Test12/23/04 Complete System Test04/21/05 LAT Shipped for Environmental Testing07/21/05 Environmental Testing Complete11/03/05 LAT RFI12/01/05

GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 6 LATEGSE LAT Assembly Configuration (3/1/04) AEM CPU 1553 LCB SIU LCB EGSE Crate CPU LCB 3 EPUs WAN Central Database GASU Test Point on LAT EMI Skirt CAL, TKR or Sensor Simulator ACD or Sensor Simulator Online Workstation TEMs SLAC GEM CPU EBM Firewall SSR Spacecraft simulator 1553 Discretes 28 V Supply

GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 7 LATEGSE Complete Flight Unit Configuration & CU (12/24/04) AEM CPU 1553 LCB SIU LCB EGSE Crate CPU LCB 3 EPUs WAN Central Database GASU Test Point on LAT EMI Skirt CAL, TKR ACD Online Workstation TEMs SLAC GEM CPU EBM Firewall SSR 1553 Discretes Spacecraft simulator 28 V Supply

GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 8 Interdependencies Dependent on deliveries from all subsystems to be able to do the core of our work. –EM CAL & TKR mini-tower deliveries. –EM GASU and flight software support from ELX. –All Flight Hardware and Software. –MGSE FEM Analysis Budget for I&T Flight Electronic Techs and the hiring of those techs (4 full time people starting 12/15/03) is currently the responsibility of ELX. I&T will schedule the work for these Techs. System engineering test plans are required as input to I&T test plans and resulting procedures. Mission level EGSE decisions can impact I&T EGSE schedule and budget.

GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 9 Flight Hardware Procurements No flight hardware procured by I&T. All flight components come from a subsystem.

GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 10 Flight Hardware Manufacturing Plan Status LAT-MD LAT Integration & Test PlanIn Work LAT-MD LAT EM Test PlanIn signoff LAT-MD EGSE PlanIn revision LAT-MD SVAC PlanReleased LAT-MD SVAC Test PlanReleased LAT-MD LAT Weight and CG Test PlanReleased LAT-MD MGSE Development PlanIn signoff LAT-MD LAT Dynamics Test Performance Plan Draft in Cyberdocs LAT-MD LAT Thermal Test Performance Plan Draft in Cyberdocs LAT-MD LAT EMI Test Performance Plan Draft in Cyberdocs LAT-MD LAT Assembly SequenceIn revision LAT-MD LAT Facilities PlanReleased LAT-MD LAT Survey & Alignment Performance PlanIn signoff LAT-MD LAT Electrical Test Performance planReleased LAT-MD LAT Particle Test PlanIn signoff

GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 11 Engineering Model Testing Closure Status I&T Tests of the TKR mini-tower were done and the results reported to the Engineering meeting at June 10 Engineering Meeting. Data is still being worked. EM tower (CAL EM and TKR mini-tower) due in August to I&T Complete EM Tower functional test by September 18 th and then make available to Flight Software. Complete EM Calibration by October 12 th. Need 1x4 Grid and TRK EM Mechanical tower a week before Mechanical fit check to assemble TRK EM into grid. Perform a mechanical fit check using 1x4 Grid, TKR Mechanical Tower, and EM CAL on October 13 th. CAL EM on the NRL loading dock and the TKR mini-tower in Italian Customs by October 17 th. Support the GSI Beam Test, including the CAL and the TKR mini-tower (run Carbon in the daytime) November 14 th – 24 th.

GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 12 Open Flight Design Issues/ Status Trades CAL-Grid interface design, impacts I&T MGSE, assembly, processes, and procedures. Design not completed. Grid EMI Skirt design impacts I&T assembly, processes and procedures. Design not completed. X-LAT plate design impacts I&T MGSE, assembly, processes and procedures. Design not completed. Radiator interface and MGSE design impact I&T, assembly, processes and procedures. Design not completed. Environmental test sensor requirements impact I&T assembly, processes and procedures. Requirements have not been finalized. LAT pointing knowledge requirements are under review by the project. I&T test plans cannot be finalized until we know the final requirements.

GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 13 Cost/Schedule Status (May Month End) -2% variance -5% variance The monthly Cost and Schedule Variances are trending negative Cost Variance – GREEN Schedule Variance – YELLOW Beam test change request has been approved and has been incorporated for the June Report.

GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 14 Issues/Concerns/Suggestions/Risks Late delivery to I&T of EM parts and EGSE software test scripts.  Late delivery has delayed preparations for LAT, particularly in areas of IFCT and SVAC. Possible impact on EGSE.  Part of EGSE/MGSE verification strategy depends on I&T EM program. Finalization of all LAT test plan requirements is not complete post CDR. This is resulting in compressed schedule and potential increased cost for I&T. Current estimates are September for completing all test plans from the Design Team. Delivery of flight hardware to I&T may be late. I&T EGSE is proceeding with in-house developed test executive software. Change to another system for Observatory and/or IOC will require major cost change request. Spacecraft interface detail uncertainty.  Environmental test fixtures.  EGSE interface.  MGSE handling fixtures. SIIS fidelity uncertainty. Delivery of flight hardware to I&T may be late. When will a decision be made about where to go for Environmental Testing? This will impact preparations and design of Vib and T/V fixtures.