Belle2Link: An Unified High Speed Link in Belle II Experiment Z.-A. LIU, D. SUN,J.Zhao, H.XU, K.WANG IHEP, China T.Higuchi, y.Igarashi, R.Itoh, M.Nakao,

Slides:



Advertisements
Similar presentations
Fast Timing Workshop Krakow, Nov 29 - Dec 1 st 2010 Part 2a.
Advertisements

1 Status of Front-end Unification DAQ Meeting at Belle-II Meeting 7-JUL-09 Gary Varner.
1 iTOP Electronics Effort LYNN WOOD PACIFIC NORTHWEST NATIONAL LABORATORY JULY 17, 2013.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
An ATCA and FPGA-Based Data Processing Unit for PANDA Experiment H.XU, Z.-A. LIU,Q.WANG, D.JIN, Inst. High Energy Physics, Beijing, W. Kühn, J. Lang, S.
Belle Trigger/DAQ Workshop Workshop Summary - R.Itoh, KEK Shinshu University, 2/17-18/ participants Shinshu Univ. Matsumoto Catsle and Mountains.
First detector and DAQ test results from the TEDA beamline Matt Andrew, Mike Hadmack, Bryce Jacobson, Gary Varner University of Hawaii Experience from.
Digital CFEB Prototype Plans 1 B. Bylsma, CSC Upgrade Workshop, Ohio State Univ., April 23-24, 2010 Ben Bylsma The Ohio State University.
FF-LYNX R. Castaldi, G. Magazzù, P. G. Verdini INFN – Sezione di Pisa G. Bianchi, L. Fanucci, S. Saponara, C. Tongiani Dipartimento di Ingegneria della.
Takeo Higuchi IPNS, KEK COPPER Revision and New CPU.
Update on Electronics for the SSL 8” Ceramic Detector Matt Andrew, Kurtis Nishimura, Gary S. Varner University of Hawai’i 28-MAR-2012 Discussion 1.
Outer Tracker Off-Detector Readout and Control Discussion John Coughlan SLHC Tracker Readout Meeting March 7 th 2007.
Evaluation of the Optical Link Card for the Phase II Upgrade of TileCal Detector F. Carrió 1, V. Castillo 2, A. Ferrer 2, V. González 1, E. Higón 2, C.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
FF-LYNX (*): Fast and Flexible protocols and interfaces for data transmission and distribution of clock, trigger and control signals (*) project funded.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Performance of the AMT-3 Based TDC System at Belle S.Y.Suzuki, T.Higuchi, Y.Arai, K.Tauchi, M.Nakao, R.Itoh (KEK) H.Nakayama (University of Tokyo)
Front-end readout study for SuperKEKB IGARASHI Youichi.
1 iTOP readout firmware development K. Nishimura and G. Varner 25-MAR-2011 lDAQ meeting Not shown: Joshua Sopher (firmware) Lili Zhang (DSP coding)
Federico Alessio Zbigniew Guzik Richard Jacobsson TFC Team: A Super-TFC for a Super-LHCb - Top-down approach -
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
Takeo Higuchi (KEK); CHEP pptx High Speed Data Receiver Card for Future Upgrade of Belle II DAQ 1.Introduction – Belle II DAQ Experimental apparatus.
Guido Haefeli CHIPP Workshop on Detector R&D Geneva, June 2008 R&D at LPHE/EPFL: SiPM and DAQ electronics.
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
KLM Trigger Status Barrel KLM RPC Front-End Brandon Kunkler, Gerard Visser Belle II Trigger and Data Acquistion Workshop January 17, 2012.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
Development of PCI Bus Based DAQ Platform for Higher Luminosity Experiments T.Higuchi, 1 H.Fujii, 1 M.Ikeno, 1 Y.Igarashi, 1 E.Inoue, 1 R.Itoh, 1 H.Kodama,
Simulation of high speed serial interconnection (report from PH/ESE first discussion about high speed serial link simulations) J. Christiansen, S. Baron1EUG.
1 Preparation to test the Versatile Link in a point to point configuration 1.Versatile Link WP 1.1: test the Versatile Link in a point to point (p2p) configuration.
1 CDC Readout - upgrade for Higher Luminosity - Y.Sakai (KEK) 29-Oct-2002 TRG/DAQ Review of Status/Plan (based on materials from S.Uno/M.Tanaka)
Strategy for unified data link Zhen-An LIU Institute of High Energy Physics.
CDC Baseline design  Chamber radius  Wire configuration  Main parameters  Electronics Summary Shoji Uno (KEK) July-4 th, 2008.
Jan. 25, 2011 Status of the Aerogel RICH Readout Trig/DAQ Meeting in Beijing 1 S. Nishida (KEK) S. Nishida Status of the Aerogel RICH Readout Belle II.
CHEP03 P5, 3/24/03, R.Itoh 1 Upgrade of Belle DAQ System Ryosuke Itoh, KEK representing Belle DAQ group 1. Introduction 2. Requirements 3. Design 4. Software.
SVD DAQ and Overall DAQ for DESY Telescope Test Takeo Higuchi (KEK) Sep. 26 th, 2012The 2 nd PXD/SVD Joint Meeting I have a serious problem in the Internet.
SVD DAQ 25 Jan 2011 Belle2 DAQ T. Tsuboyama (KEK)
SVD DAQ Status Koji Hara (KEK) 2012/7/19 DAQ workshop1.
Prototype of the SVD Finesse Transmitter Board (FTB) (Sender Part for HSD Link) wacek ostrowicz 14 slides The Prototype of the SVD FTB Recent.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Status of the SVD DAQ Koji Hara (KEK) 2012/1/16 TRG/DAQ meeting1.
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
Project Overview James Fast Pacific Northwest National Laboratory.
Data Acquisition of the PXD Takeo Higuchi (KEK) PXD follow up meeting on Nov.7,2010 « DISCLAIMER» Materials prepared for and presented in PXD follow up.
SHARING A HIGH SPEED OPTICAL DATA TRANSMISSION LINK WITH SLOW CONTROL STREAM TIPP2014 Amsterdam June Zhen-An LIU, Jingzhou Zhao, Dehui Sun, Trigger.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
B-KLM DAQ 2011/01/25 Trigger/DAQ workshop K. Sumisawa (KEK) Introduction Summary +7 pages.
Status of Compute Node Zhen’an Liu, Dehui Sun, Jingzhou Zhao, Qiang Wang, Hao Xu Triglab, IHEP, Beijing Wolfgang Kühn, Sören Lange, Univ. Giessen Belle2.
PXD DAQ News S. Lange (Univ. Gießen) Belle II Trigger/DAQ Meeting (Jan 16-18, 2012, Hawaii, USA) Today: only topics important for CDAQ - GbE Connection.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
Demo system of Belle2link Sun Dehui, Zhao Jingzhou,Liu zhen’an Trigger Lab IHEP.
E. Hazen -- Upgrade Meetings1 AMC13 Project Development Status E. Hazen, S.X. Wu - Boston University.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
Private Notes on the 3 rd PXD DAQ/Trigger Workshop T.Higuchi (KEK) Jul.8,2011B2GM.
BPID / TOP belle2link status University of Hawaii: ● Matt Andrew ● Gary Varner ● Brian Kirby ● Bostjan Macek ● PNNL: ● Lynn Wood ● Craig Bookwalter ● Ryan.
E. Hazen1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
SVD FADC SVD-PXD Göttingen, 25 September 2012
WBS 1.03 Readout Systems Specifications, Design and Acceptance
WBS 1.03 Readout Systems Scope, Cost and Schedule
PANDA collaboration meeting FEE session
Future Hardware Development for discussion with JLU Giessen
The Data Handling Hybrid
Discussion Items Clock PC and/or VME CPU Trigger readout
DHH progress report Igor Konorov TUM, Physics Department, E18
PXD ATCA DAQ for DESY Test
ALICE Trigger Upgrade CTP and LTU PRR
DAQ Interface for uTCA E. Hazen - Boston University
PID meeting Mechanical implementation Electronics architecture
- TFC status - Switch / RS
Group Organization Toru Iijima / Nagoya
Suggestion on your presentation of the TT&C subsystem
Presentation transcript:

Belle2Link: An Unified High Speed Link in Belle II Experiment Z.-A. LIU, D. SUN,J.Zhao, H.XU, K.WANG IHEP, China T.Higuchi, y.Igarashi, R.Itoh, M.Nakao, KEK Matt Andrew, L. L. Ruckman, G. S. Varner U. of Hawaii

Belle2Link: An Unified High Speed Link in Belle II Experiment Belle II: An Upgrade of Belle –New/Improved Detectors –New FEEs –Upgraded trigger –Upgraded DAQ

Unification in the link SVD FEE COPPER / DAQ COPPER / DAQ BelleLink RFCLocK CDC FEE ……… PID KLM TTC IF_FE IF_TTC IF_CO FIFO_FE PROTOCOL &control PROTOCOL &control 16bit 32 bit From FEE TTC interface TTC interface GTP CLK_LKCLK_FE GTP Opticalfiber To COPPER BL_SNDR BL_RSV R 16bit 32 bit 16bi t FIFO_CO PROTOCOL &control PROTOCOL &control CLK_LK FEE interface COPPER interface Nev_F E Prototypes of FEE,HSLB and link testing with BER < A mini DAQ system with FEE,Belle2link and COPPER, and test readout Block diagram of High Speed link of 2Gbps