Presentation is loading. Please wait.

Presentation is loading. Please wait.

Fast Timing Workshop Krakow, Nov 29 - Dec 1 st 2010 Part 2a.

Similar presentations


Presentation on theme: "Fast Timing Workshop Krakow, Nov 29 - Dec 1 st 2010 Part 2a."— Presentation transcript:

1 Fast Timing Workshop Krakow, Nov 29 - Dec 1 st 2010 Part 2a

2 2 Gary Varner

3 3

4 4

5 5

6 6 Design Choices Input coupling – Differential versus single-ended input – Needed analog bandwidth – Gain needed? Sampling Options – On ‐ chip PLL/DLL – External DLL – Analog transfer vs interrogate in situ ADC and readout options ADC and readout options – Sequential output select vs random access – On ‐ chip vs. off ‐ chip ADC – Serial, parallel, massively parallel

7 7 Gary Varner Constraints - Analog Bandwidth - Switching noise - Leakage current - Deeper sampling Extensive radio array for UHE neutrinos - Super B Factory PID Upgrade – precision timing

8 8 Gary Varner

9 9

10 10 Gary Varner

11 11 Gary Varner

12 12 Gary Varner

13 13 Gary Varner

14 14 Gary Varner

15 15 Gary Varner

16 16 Gary Varner IRS/Blab3 chips

17 17 Gary Varner

18 18 Gary Varner Blab 1

19 19 Gary Varner Blab1 chip

20 20 Gary Varner (IRS chip)

21 21 Gary Varner (Belle2 Upgrade)

22 22 Gary Varner HPK SL10

23 23 Gary Varner

24 24 Gary Varner

25 25 Miroslav Firlej, Jakub Moron, Marek Idzik AGH University, Poland (University for Mining)

26 26 Miroslav Firlej, Jakub Moron, Marek Idzik

27 27 Miroslav Firlej, Jakub Moron, Marek Idzik

28 28 Miroslav Firlej, Jakub Moron, Marek Idzik

29 29 Miroslav Firlej, Jakub Moron, Marek Idzik

30 30 Gary Varner, Kurtis Nishimura, Matt Andrew First detector and DAQ test results from the Univ Hawaii picosecond xray beamline FEL = very tight bunch specs ~ 1ps timing probe

31 31 Gary Varner, Kurtis Nishimura, Matt Andrew

32 32 Gary Varner, Kurtis Nishimura, Matt Andrew

33 33 Gary Varner, Kurtis Nishimura, Matt Andrew

34 34 Gary Varner, Kurtis Nishimura, Matt Andrew Phase II: Tunable, mono ‐ chromatic x ‐ ray Source Stabilized optical storage cavity Tests of new detectors: 3D, new chips

35 35 Gary Varner, Kurtis Nishimura, Matt Andrew

36 36 Gary Varner, Kurtis Nishimura, Matt Andrew

37 37 Gary Varner, Kurtis Nishimura, Matt Andrew

38 38 Gary Varner, Kurtis Nishimura, Matt Andrew


Download ppt "Fast Timing Workshop Krakow, Nov 29 - Dec 1 st 2010 Part 2a."

Similar presentations


Ads by Google