MICO 15 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.

Slides:



Advertisements
Similar presentations
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Advertisements

Summary of MICE 4/4/2008 shift during the ISIS machine-physics period Goals for 04 Apr08 MICE shift: 1. Radiation survey in MICE Hall with target operating,
MICE TARGET OPERATION C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England.
TJR Feb 10, 2005MICE Beamline Analysis -- TRD SEPT041 MICE Beamline Analysis – TRD SEPT04 Tom Roberts Muons, Inc. February 10, 2005.
MICE Beam Loss vs Particle Rate Adam Dobbs, ISIS Meeting, 18 th December 2009.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICO Alain Blondel 17 March MICO Alain Blondel 17 March MICE target test-run March 2008 Friday 14/03/2008 6:00-> 18:00 Saturday 15/03/2008.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICE Video Conference April 22, 2010.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
MICO 9th Aug 2010J.S. GraulichSlide 1 MOM report o Last Week o Run Plan for this Week o Machine Physics Jean-Sebastien Graulich, Geneva.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting June 7, 2010.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 4, 2011.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO April 6, 2009.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
Commissioning needs MICO meeting 30 June 2008 MOM ( Roumen Tsenov)
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting May 24, 2010.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009.
17 March 2005Edda Gschwendtner1 MICE Cooling Channel: Can we predict cooling to ? Edda Gschwendtner Challenge Systematics Cooling Channel Beam Line.
Burle Leak Check 3/19/2012 Jeff Williams Jun Xie.
Physics Program and Runs: Autumn 2011 & Step IV V. Blackmore MICE Project Board, 08/03/12.
MICE CM18 RAL Alain Blondel 14 June MICE run plan -- steps I and II 1.Establishing the detailed run plan will be one of the mission of the MICE.
MICE VC Aug '10J.S. GraulichSlide 1 MOM report o Achievements Since CM27 o Daily Operations o Run Plans o Summary Jean-Sebastien Graulich, Geneva.
MOM report – part I Roumen Tsenov as MOM ( )
MICE Beamline Commissioning Linda R. Coney NFMCC Meeting 16 January 2010.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
MICE Operations Manager Report Linda Coney University of California, Riverside UKNF Meeting June 8, 2010.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE Step 1: First Emittance Results with Particle Physics Detectors Linda R. Coney EuCARD Meeting – 10 May 2011.
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Controls for Particle ID/tracking in MICE 1.Physics and systematics 2.Controls types 3.Controls list 4.Needed for particle ID/tracking M. A. Cummings May.
MICE Run Plan Sept/Oct 2009 m. apollonio – IC MACHINE PHYSICS USERs RUN NO SHIFT A B C D E.
MICE VC MOM Report, 25 th February 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - Machine Physics and User Runs - Suggestions.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Running plan Step I.1 Basic radiation levels. I.1.1 ISIS running with beam elements on, target off, beam stop shut. Establish permanent MICE monitoring.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Controls and monitoring in MICE 1.Physics and systematics 2.Controls types 3.Controls list 4.Data record M. A. Cummings April 2004 CERN.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
1 Updated Run Plans. K.Tilley, MICO, 07/02/08 - pre-commissioning - Target, - beamline functionality - detectors, particle production - decay solenoid.
Beamline Update Adam Dobbs, MICE CM38 Feb Contents Recent and Upcoming Activities Target Conventional magnets Decay Solenoid Proton Absorber Summary.
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
(one of the) Request from MPB
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
M.apollonioNuFact??1 ABSTRACT In the Muon Ionization Cooling Experiment (MICE) at RAL, muons are pro­duced and transported in a dedicated beam line connecting.
Spokesman's update.
L. Coney UC Riverside MICE CM32 – Glasgow – June 2012
MICE Operations Scenario Run 1
Luminosity Monitor Status
Completing the Step IV Programme
IS IT EFFECTIVE TO RUN ONLINE DATING BACKGROUND CHECKS YOURSELF?
Presentation transcript:

MICO 15 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans

Decay Solenoid and Target 15 Feb, Decay Solenoid (from Matt Hills) Matt and Willie used leak detector to pump pipework while spraying externally with helium. - No leak found; difficult to get background helium to low level Access to decay solenoid turret arranged to spray remaining pipework Tested for leaks in transfer pipes by connecting leak detector to DS/transfer line circuit - No leak found after letting transfer line vacuum space up to 1 bar helium Connected gas analyzer directly to buffer - N 2 contamination higher than expected, could explain contamination OPN for access to decay solenoid turret during ISIS running being developed by Willie (MICE) David Findlay (ISIS) Frances Burge (Health and Safety) Target 2 (from Paul Hodgson, more in Ken Long’s talk) A couple of DAQ interruptions over weekend Evidence of some wear seen in distance vs. time plot Achieved over 1,500,000 actuations - Record for target run in R78!

TOF/KL Calibration With +/- Particles Feb. 10: negative particle data at 2V beam loss – 300 MeV/c e - with TOF0 trigger (calibrate KL, TOF2) – 300 MeV/c e - with TOF1 trigger (calibrate KL, nominal trigger) – 250 MeV/c e - with TOF1 trigger (study systematics) – 200 MeV/c e - with TOF1 trigger (study systematics) – 300 MeV/c π - with TOF1 trigger (study systematics) – 250 MeV/c π - with TOF1 trigger (study systematics) – 200 MeV/c π - with TOF1 trigger (study systematics) Feb. 12: positive particle data at 1V beam loss – 300 MeV/c e + with TOF0 trigger (calibrate KL, TOF2) – 300 MeV/c e + with TOF1 trigger (calibrate KL, nominal trigger) – 250 MeV/c e + with TOF1 trigger (study systematics) – 200 MeV/c e + with TOF1 trigger (study systematics) – 300 MeV/c π + with TOF1 trigger (study systematics) Beam spread out to cover outer TOF counters by lowing Q7-Q8-Q9 currents 15 Feb, 20103

User Run Plans Reluctance to use up target pulse budget without working decay solenoid Short run planned for Thursday, Feb. 18 for online monitoring tests MICE data taking request with indefinite dates when decay solenoid working – Check and complete (emittance, momentum) matrix – Measure particle production vs. beam loss for different particle species – Proton absorber studies 15 Feb, 20104