Takashi Matsushita Imperial College T. Matsushita 1 Full tracker station assembly/QA, schedule.

Slides:



Advertisements
Similar presentations
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Advertisements

Takashi Matsushita Imperial College T. Matsushita 1 Station 5 status.
G.Barber: Mice Tracker Meeting New York1 Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Assurance 16/05/06.
Takashi Matsushita Imperial College T. Matsushita 1 Station five – assembly/QA.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
MICE Tracker workshop, 06Nov Waveguides for Station5 H. Sakamoto / M. Yoshida.
Takashi Matsushita Imperial College T. Matsushita 1 Station 5.
Waveguide for full tracker M. Yoshida 2006/11/8 MICE Tracker workshop.
Project Report Paul Drumm CM15, FNAL June MICE Schedule Overview First beam September/October 2007 –Shutdown from January 2007 –Eight months for.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Assurance; status 18/05/06.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
T. Matsushita 1 Station 5 as of 28 Nov 2006 All planes bundled All planes connectorised All planes glued Fibres potted Ready for cut/polishing Shift takers;
6 th April 2005 Malcolm Ellis, Imperial College London 1 Sci Fi Status & KEK Test.
G.Barber 28 Oct Construction/Refurbishment Of The Tracker Prototype Contents:- Welcome Back Plans Layout Things to be addressed New Schematic.
Tracker QA P. Kyberd, M. Takahashi 1 Quality Assurance for SciFi Tracker (Brunel, FNAL, IC, Osaka) A status report: A procedure for ensuring the quality.
Takashi Matsushita Imperial College T. Matsushita 1 Engineering (Mechanical) Geoff Barber.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
Production Planning & Control
Takashi Matsushita Imperial College T. Matsushita 1 Station5 in UK.
G.Barber Mice Tracker Mechanical Progress Imperial Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment.
MICE Tracker Update Alan Bross NFMCC Friday Meeting November 10, 2006.
Tracker QA Test Station Status. 29/08/2015Imperial College 2 Updated QA Scan Definition Scan definition: 1 –One 300 mm scan  r to V (1) 25 –Two 75 mm.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker performance Vacuum/helium/air.
1 SciFi Results and Comparison Malcolm Ellis, for the MICE Scintillating Fibre Group Abingdon, 31 st October 2003.
Tracker QA Paul Kyberd Quality Assurance A status report: A procedure for ensuring the quality of the finished tracker has been designed following our.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
G.Barber: Mice-International Meeting Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
D0 PMG 12/2/99 Fiber Tracker Status  Carbon fiber work u All support cylinders done u Some work remains on band/support pieces + work for Silicon Detector.
Tracker Summary Alan Bross MICE CM October 10, 2007.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
Takashi Matsushita Imperial College T. Matsushita 1 MICE Status Excerpt from talks at MuTAC review:
Takashi Matsushita On behalf of IC/Brunel team Imperial College T. Matsushita 1 Preparation for station five Construction/bundling/connectorisation.
Tracker Review –see technical board review web page: MICE -> technical board -> TB review pageMICEtechnical boardTB review page –Present: Tech Board: PD,
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
4th Station Waveguide Test Roger Hare & Aron Fish.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 Assembly/QA status, schedule.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Control of Station Assembly.
WEEK 1 You have 10 seconds to name…
Booster Bias Supply and Cavity Upgrade November 16 th, 2011.
T. Matsushita 1 Waveguide length with 3D model Internal waveguides The shortest = 1.5 m The longest = 2.6 m Others depending on the spacing Front face.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
T. Matsushita 1 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic.
Tracker Week February presented by John Coughlan RAL FED Status FEDv2 Testing Pre-Series Manufacture Final Production.
MICE Phone Meeting 26 October Status report of Waveguides for Station5 Hideyuki Sakamoto Contents Review of production process Present status Plans.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
Fabrication Update – The Frame Awakens Matt Hoff LBNL April 2,
T. Matsushita 1 News Ribbons - i Inspection at IC All five ribbons have production date Two ribbons have mold ID + production ID (e.g. mold4#1) One ribbon.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
Helene Felice With input from Dan C, Maxim… Possible options for coil wiring.
T. Matsushita 1 QA: Fibre Counting Software 1. Take CCD image of comb/connector 2. Cut noise 3. Find bundles: Nearest Neighbour Clustering, merge clusters.
MGT 350 Week 2 DQ 1 What are the characteristics of a problem? How might a problem present itself? How should a problem be investigated and identified?
Requirements for the Software Group (and agreed actions)
Aron Fish Imperial College Mice Video Conference 01/02/06
Decoding….
Preparation for Station Acceptance Test
Scintillating Fiber/Clear Fiber QA and Ribbon Production
2S module geometry updates Module positioning concepts
Tracker Station QA Acceptance Test Rig Status
START DIRECTIONS QUIZ.
Presentation transcript:

Takashi Matsushita Imperial College T. Matsushita 1 Full tracker station assembly/QA, schedule

T. Matsushita 2 Plan station assembly/QA Will follow the procedures established during station five assembly Inputs; We build 15 stations; two trackers and 5 stations for spare tracker Doublet-layer production will be finished by the end of the year It takes a week to make two views; we assemble two views in parallel It takes a week to characterise a station with source scan We can build the first tracker after building 10 stations; choose 5 best ones Waveguides production takes two weeks per station; 20 week Then schedule will be…

T. Matsushita 3 Five stations assembly Need 450 station connectors before starting full production! Need three vacuum chucks/combs/bridges before starting full production! Need five carbon fibre station frames before starting five stations assembly! 7.5 weeks

T. Matsushita 4 Tracker assembly Schedule is tight