D’Appolonia’s experience as “External Compliance Monitoring Group” to “Lenders’ Independent Environmental and Social Consultant” in the private sector.

Slides:



Advertisements
Similar presentations
Financing a Sustainable Low Carbon Indian Economy
Advertisements

Spencer Henson & Oliver Masakure International Food Economy Research Group Department of Food, Agricultural & Resource Economics University of Guelph.
World Meteorological Organization Working together in weather, climate and water Systematic Development of Multi-Hazard Early Warning Systems Maryam Golnaraghi,
Role of Senior Management
INTERNATIONAL FINANCIAL CONSULTING EGTT Workshop, September 27-29, 2004 Montreal, Canada Are Export Credit Agencies and Other Traditional Sources of Infrastructure.
Company Profile 2011 Flexible as Free-lancers & Structured as a Corporate 4, Tayaran st. EG Cairo Tel: Fax:
Corporate Biodiversity Finance Financing no net loss & positive impacts Dr Francis Vorhies Earthmind Panel 1B: Resource Mobilisation CBD Cop12 Business.
Climate Change Mitigation - The role of Financial Institutions
Peace Through Commerce Partnerships As a New Paradigm Reflections From Pact Congo and USAID Working With the Mining Sector in the DRC Christian Roy, Pact.
Project Financing & Meeting International Social & Environmental Standards in Africa John Miragliotta, Sustainability Pty Ltd
SOCIAL POLICY GUIDELINES FOR MINING SECTOR IN AFGHANISTAN Harjot Kaur Senior Social Development Advisor, Ministry of Mines.
Health Aspect of Disaster Risk Assessment Dr AA Abubakar Department of Community Medicine Ahmadu Bello University Zaria Nigeria.
Viewpoint Consulting – Committed to your success.
Social Sustainability in the Hydropower Sector Richard English, PhD Principal Environment and Social Development Specialist South and East Asia Regions,
Capacity Enhancement for Air Quality Management John E. Hay Senior Advisor UNEP ROAP & IETC.
Environmental and Social Responsibility in Lending: Citi’s Journey with the Equator Principles May 13, Mumbai, India Rajesh Jogi Global Portfolio Risk.
CSR at Scotiabank Kim Brand Santiago, Chile December 9, 2008.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 16 Sustainable Operations Management— Preparing for the Future McGraw-Hill/Irwin.
Gulf of Mexico Challenges with Contractor Verification - Skills and Knowledge.
GOOD GOVERNANCE PRINCIPLES AND GUIDANCE for Not-for-Profit Organisations Promoting good governance and supporting directors and boards of not-for-profit.
I n t e g r a t I n g C S S Practitioner Module 6 1 Module 6: CSS and Livability in Construction, and Maintenance.
Identification, Analysis and Management
Human Rights Training Tool. Develop a better understanding of the corporate responsibility to respect human rights relevant for the oil and gas industry.
EIA & SEA: a short state of the art Adaptation Fund 19 June 2011 Rob Verheem 2011.
Environmental Impact Assessment (EIA): Overview
Framework for the Control of Work- Related Stress.
Financing mining projects. Environmental and H&S aspects in EBRD decision making MINEX Central Asia – April 2014.
Energy Issues in Peru and the Andes: Environmental and Social Aspects George Washington University January 28, 2005 Dr. Robert H. Montgomery Head, Environmental.
INTERNATIONAL POLICY CONFERENCE “COMPETITIVENESS & DIVERSIFICATION: STRATEGIC CHALLENGES IN A PETROLEUM- RICH ECONOMY” Oil & Gas Development & Health in.
An Overview of Environmental Management Systems (EMS)
Health, Safety and Environment Policy. We are a SafeProduction organization At Vale, we are committed to sustainable development. Meeting the needs of.
OECD Guidelines on Insurer Governance
Review and Update of IFC Policy and Performance Standards on Social and Environmental Sustainability and Disclosure Policy Background and Overview October.
COMMUNITY AWARENESS / EMERGENCY RESPONSE BEST PRACTICE EXAMPLES AND TOOLS David Sandidge Director, Responsible Care American Chemistry Council May 31,
People & Mining Continuously Balancing & Increasingly Challenging.
INTEGRATING SUSTAINABILITY INTO BUSINESS Session 2: “Supporting internal learning and change through stakeholder engagement” Kyiv, Ukraine,
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
1 Safe Use of Wastewater in Agriculture Dr. Jens Liebe, UNW-DPC.
The Role of NGOs and Civil Society Beyond Holding Companies and Governments Accountable Rees Warne Policy Advisor for Extractive Industries Catholic Relief.
DG ECHO GENDER POLICY and GENDER-AGE MARKER
New Global Economic Powers and the Environment Dr. Peter Bosshard Policy Director, International Rivers Beijing, April 18, 2011.
VPA Impact Monitoring. an “evidence-based policy cycle” reiterative/adjustable to steer by based on reality checks to show if implementation leads to.
TOPIC 12 STAKEHOLDERS AND SUSTAINABILITY. Introduction to Agenda 21 The Earth Summit held in Rio De Janerio, Brazil was attended by 178 country leaders.
APEC ENERGY WORKING GROUP FRAMEWORK PROPOSAL FOR IMPLEMENTING ENERGY INVESTMENT RECOMMENDATIONS (November 2004).
Environmental Management System Definitions
Corporate Social Responsibility LECTURE 25: Corporate Social Responsibility MGT
Ghana Commercial Agriculture Project: Model Lease Consultancy World Bank Land and Poverty Conference March 2015.
1 Compliance Advisor/Ombudsman (CAO), for IFC & MIGA, World Bank Group Workshop Marrakech, Morocco, July 2009.
New World, New World Bank Group Presentation to Fiduciary Forum On Post Crisis Direction and Reforms March 01, 2010.
The International Financial Institutions and Nam Theun 2 International Stakeholder Workshops Bangkok, Tokyo, Paris, Washington, Vientiane 31 August-24.
MELBOURNE, OCTOBER 2006 INTERNATIONAL MINE MANAGEMENT MELBOURNE, OCTOBER 2006 “Leadership in the minerals sector – challenges and opportunities for management.
Gender-Entrepreneurship-Markets CommDev Workshop 19 June 2006 Extractive Industries and the Gender Bias.
International Life Cycle Partnership To bring science-based life cycle approaches into practice worldwide UNEP/SETAC Life-Cycle Initiative Life Cycle Management.
The Changing Role of the HRD Professional CHAPTER 12.
Managing Smoke and Emissions. A new system for managing smoke and emissions in Victoria that will provide for coordinated: Investment Service delivery.
The World Bank Increasing Domestic Impact of Investments Through Linkages.
Overview of Environmental Impact Assessment. Overview of EIA The Basics Who Sets the standards? Why do an E(SH)IA? Where does it fit in development planning?
Socially Sustainable Development, May 2002 Responsive, Reliable, Resilient Social Aspects of Sustainable Development Steen Lau Jørgensen Social Development.
Rome Donors Meeting September 7th1 Consultation of AMC concept with key stakeholders Rome Donors Meeting September 7 th, 2006.
Civil Society and GEF projects Siv Tokle World Bank Group November 9th, 2009.
ISO Session 3 Environmental Management and Ethics in Management.
Public Participation in the SEA of Master Plan of Yerevan City in Armenia Sona Ayvazyan, Team Leader UNDP Pilot SEA Project as the Capacity Building Tool.
World Bank Safeguards Review and Update
SustainRisk Financial Governance, Social and Environmental
GCF’s Environmental and Social Safeguards
Consultation & Participation
SustainRisk Providing an unique combination of expertise in extractives after decades of work in financial institutions, mining companies and consulting.
World Bank project example
MAZARS’ CONSULTING PRACTICE
Environment Safeguards
Presentation transcript:

D’Appolonia’s experience as “External Compliance Monitoring Group” to “Lenders’ Independent Environmental and Social Consultant” in the private sector Challenges and Opportunities IAIA 15 – April 21 st 2015

2000 – 2012 External Compliance Monitoring Group - Chad Cameroon pipeline ECMG at the beginning - Chad Cameroon

Growth 2004 – ongoing ECMG BTC Pipeline, Georgia, Azebijan, Turkey Cat A projects

ECMG Newmont Ahafo Mine, Ghana Sectors

Complexity APPLICABLE STANDARDS From a single applicable standard (“WB Pollution and prevention & abatement handbook” and “IFC Environmental Assessment Guidelines”) to multiple and tailored standards (IFC PS, EP, OECD Common Approaches, Specific IFIs, and ECAs Standards…) to comply with for a specific project BATTERY LIMITS & RISKS The actual definition of the project area of influence, associated facilities and the leverage, control and influence over third party’s actions 2008 – 2013 ECMG CAIRN pipeline system, India

A former ECMG team Project Manager Environmental Expert Social Expert Health & Safety Expert SPECIALIZED TEAM  Today, a different and more complex expertise is required  Increasing geographical specialization and technically specialized experts in those fields as required by the projects 2009 – ongoing IESC PNG LNG, Papua New Guinea

A current IESC team 2010 – ongoing IESC Tullow Oil, Ghana Sector specific process experts (hydro, petrochemical, heavy industry, …) ESMS specialist Biodiversity specialist Marine specialist Air Emissions specialist SEP specialist Human resource specialist Cultural heritage specialist Indigenous peoples specialist Emergency preparedness and response specialist OHS specialist QRA specialist

Evolving Trends From environmentally viable projects to social, economical, environmental sustainable projects Management of social impacts, gender equality, labor risks, implementation of safety management systems are now key aspects of the IESC evaluation Stakeholder engagement, Compliance of the compensation process with EMS/RAP commitments, Resettlement and Livelihood Restoration measures, Communication aspects importance is increasing 2009 – 2014 IESC Nord Stream pipeline, Russia, Finland, Germany

2011 – ongoing IESC Ichthys LNG, Australia Players

Commercial banks and Export Credit Agencies involvement add value and bring additional challenges: Increasing awareness of the banking systems towards EHSS issues - IESC to provide early warnings on issues/risks adapting to their decision making process and to internal procedures to respond to the OECD Common Approaches, to the Equator Principles’ standards, to Lenders’ specific standards 2011 – ongoing IESC Socar Turcas Aegean Refinery STAR, Turkey Commercial Banks /Export Credit Agencies involvement

Proactive interaction with key players Quickly response and timely advice to Lenders Integrity and Independence Ability to manage potential conflicts of interest perceived by Sponsors/Lenders Capability to understand and manage the prevailing standards Training to support Sponsors on EHSS issues, as needed Adaptive response to changes 2012 – ongoing OHS Advisor Enerjisa Power Plant, Turkey

2012-ongoing IESC Etileno XXI, Mexico Streamlined Due Diligence process IESC involved at early stage of the process ESHS Company policies and procedures already in line with international requirements (this was not the case in the past) Awareness of the project sponsors towards the IESC role Think positive (Lessons Learned)

Growth of internal resources to cover the most specialized role(s) (Team Leader, Project Manager) Outsourcing to address specific requirements through a selected roster of freelances and local partners Due Diligence schedules might be unrealistic: IESC needs to be flexible and to guarantee long lasting commitment IESC is the “Eyes and Ears” throughout the project lifecycle IESC adaptation process ongoing IESC Nacala Corridor project, Mozambique

Going forward Current evolutions need to be based on stakeholder awareness and their sensibilities As the market grows, this requires new areas of focus and attention The response to the growing complexity requires three ingredients suppleness and flexibility, skilled team resources and experience profiles, and focus and attention towards sustainability of the project

If this is not done, future ages will certainly look back upon us as a people so immersed in the pursuit of wealth as to be blind to higher considerations Alfred Russel Wallace

Thank you IAIA 15 – April 21 st 2015 D’Appolonia S.p.A. Via San Nazaro, Genova – Italy Giovanni De Franchi Tel Fax