Activity at: AVS PRIMARY SCHOOL, Muthaiyapuram, Tuticorin District Contribution by BHEL: Construction of First floor in Existing School - 1850Sqft Amount.

Slides:



Advertisements
Similar presentations
Director (Power) visit to Amravati site on
Advertisements

SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
BHEL : PSSR : MRPL Site Shri. W V K Krishna Shankar Director (IS&P)
BHEL PS SR 2X600 MW Shree Singaji TPP congratulates everyone on the occasion of the dedication ceremony of 2X600 MW Shree Singaji TPP to the nation By.
Shri M.V. Keshavaraj, AGM, administering the Swachh Shapath (Cleanliness Oath) by employees of Kakatiya at 09:45 am.
EventFlat Earnest Money Deposit10 Completion of Plinth10 Completion of slab 13 Completion of slab 23 Completion of slab 33 Completion.
With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen.
First Floor Plan Description – First Floor: Library - Two story plus mezzanine Main library on the second floor Office/support spaces on the first fl.
1 Welcome to a presentation on Prize Distribution Ceremony held at the Govt. Blind School, Cooch Behar on 13 th July, 2007 Shri. Phani Bhusan Sen (Principal.
Remsenburg – Speonk Union Free School District Elementary School Bond Planning Presentation October 12, 2010 BBS Architects and Engineers and Triton Construction.
DUBAI STAR WORK PROGRESS DATE 23 JULY Material At Site.
Montoursville Area High School – Additions and Renovations Act 34 Public Hearing February 24, 2015.
Florida State University Parking Analysis. Overview The designated site in question The designated site in question Data observed Data observed The “parking.
3a. Pursue funding for the program plan to effect a transformation that is almost complete…Information Commons.
GATEWAY CENTER SPACE UTILIZATION STUDY September 17, 2007.
SWACHH BHARAT ABHIYAN ( – ) ON OBSERVED SWACHH BHARAT ABHIYAN AT BHEL PSSR SALES AFTER SERVICES SECUNDERABAD.
Construction Drawings for Graphic Communication A building or construction project requires a complete set of specialised drawings. These drawings are.
Volcanes Education Project Community Library Visit and Opening November 2013.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
March 17, Radiation Shielding Update and Guidance Don Parry, MHP, CHP Region I Physicist Michigan Department of Community Health Radiation Safety.
Wayone smart villa’s There comes a time when we all need more from life. Space to think, Room to grow. The opportunity to enjoy our independence and.
ADDITION & REMODEL Eugene Field Elementary School.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Visit of Vishwas More Rotary Club of Alamo, CA,USA 23 rd November, 2009.
Space Planning and Construction. LDR Room Renovations Completed on August 21, 2013 Microbiology Lab Reorganization Completed on October 9, Willard.
1 COIMBATORE INDUSTRIAL INFRASTRUCTURE ASSOCIATION (COINDIA) Pump, Motor and Foundry Cluster – Coimbatore – Tamil Nadu PROJECT IMPLEMENTATION REPORT (PIR)
Solar Panels are Solar power is the conversion of sunlight into electricity.
Eden Central School District Board of Education Meeting Eden CSD 2020 Project Update September 16, 2015.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
1 COIMBATORE INDUSTRIAL INFRASTRUCTURE ASSOCIATION (COINDIA) Pump, Motor and Foundry Cluster – Coimbatore – Tamil Nadu PROJECT IMPLEMENTATION REPORT (PIR)
WE ARE MOVING! MOVING DATE: NEW OFFICE: COMPANY NAME.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. November 5, 2007 Prepared.
Shristi Updates – September ‘08 New Building Update Other Updates Teacher Salaries.
Washington,D.C.. h The District of Columbia was founded on July 16, It was established by the Constitution of the United States to serve as the.
1 COIMBATORE INDUSTRIAL INFRASTRUCTURE ASSOCIATION (COINDIA) Pump, Motor and Foundry Cluster – Coimbatore – Tamil Nadu PROJECT IMPLEMENTATION REPORT (PIR)
Science Complex Renovation Science, SR I, and Fleming Board of Regents Administration & Strategic Planning Committee April 28, 2008.
Major projects carried out by Design cell ( July 2015 ) 12/22/20151Design cell IIT,Bombay Aug 2015.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
2 nd phase I.Classrooms, toilets, dinning hall, computer rooms and library for the primary students II.Expansion of the high school library and relocate.
Work Progress Photos From 1 ST To 15 TH NOV 2015.
INDEPENDENCE DAY CELEBRATION PSSR HQ., CHENNAI
Making Education More Engaging in Schools - by M. V. Vishali.
Olson Hall Classroom Renovations Rooms 101, 105, 118, 125, 141, 163, 227.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 02.
KAKATIYA THERMAL POWER PROJECT 1X600 MW TG PUT ON BARRING GEAR ON AT AM.
A Corporate Social Responsibility Initiative Construction of Compound Wall, Toilet blocks, and roof water proofing, and renovation of school building.
where space meets performance
OABCIG General Obligation Bond Referendum Presentation
Occupational Therapy Classroom Proposal
Introduction Lotus Srishti Location Map Floor Plans Numbering Plan
February 13, 2017.
Bensalem Township School District Business Affairs Committee Meeting
Construction Drawings for Graphic Communication
A10.01 Project Description:
SSEBE ECEE CIDSE SEMTE primary SBHSE
Troy School District Bond Program – Series 1 Construction Update
Ross St Elementary School Referendum
2007 Bond Issue Capital Improvement Program
BOARD WORK SESSION TUESDAY, JANUARY 26, :30-7:30.
DOVER ELEMENTARY Existing MPB (2/14/12).
Where …? Unit 2 Open Day.
1st Floor Spaces Layout Latrine Latrine TTF Office TTF Office SQ SQ SQ
When all the first fix electrical and plumbing is finished the roofers return to fix the ceiling sheeting in place so the plasterers can arrive on site.
HOTEL ADDRESS, CITY, STATE & ZIP
RECEIPT [Receipt description]
[Payee Name] [Street Address] [City, ST ZIP Code]
Prize Distribution of Blind School
1.
Presentation transcript:

Activity at: AVS PRIMARY SCHOOL, Muthaiyapuram, Tuticorin District Contribution by BHEL: Construction of First floor in Existing School Sqft Amount Incurred : Rs. 14,00,000.00/- Inaugural Date: 14/05/2015 Inaugurated by: Smt. Madhumathi IAS, Tuticorin Corporation Commissioner Shri. George Simon GM – HR & SCT BHEL PSSR CSR ACTIVITIES

AVS – PRIMARY SCHOOL – EARLIER DAYS No enough space for students Classrooms were held at open spaces Open Terrace - Proposed area for Class Room construction

No of Class Rooms: 8 Total No of Students Beneficiary : 425 Description: Civil Construction of 1 st floor with plinth area of 1850 Sqft comprising of 7 class rooms and 1 computer lab, Plastering, Flooring, Painting with Electrical & Plumbing works. CSR PROJECT – AVS PRIMARY SCHOOL UPGRADATION - PLAN 2X500 MW NTPL Tuticorin Site - CSR Activity

First Floor Construction works – Pooja held on 24/11/14 AVS Primary School – During Construction 2X500 MW NTPL Tuticorin Site - CSR Activity

AVS Primary School – During Construction 2X500 MW NTPL Tuticorin Site - CSR Activity

NEWLY CONSTRUCTED SCHOOL 1 ST FLOOR AVS PRIMARY SCHOOL MUTHAIYAPURAM, TUTICORIN 2X500 MW NTPL Tuticorin Site - CSR Activity

FIRST FLOOR CLASS ROOMS

GM/HR&SCT,GM/TUTICORIN SITE INTERACTION WITH SCHOOL OFFICIALS OPENING OF SCHOOL FOUNDERS PORTRAITS BY IAS SHRI MADHUMATHI,IAS ARRIVAL AT THE INAUGURATION FUNCTION SHRI GEORGE SIMON,GM/HR&SCT-PSSR ARRIVAL AT THE INAUGURATION FUNCTION

UNVEILING OF CSR NAME PLAQUE BY GM/HR & SCT

SHRI.MADHUMATHI,IAS INTERACTING WITH SCHOOL CHARIMAN 2X500 MW NTPL Tuticorin Site - CSR Activity

INAGURATION BY GM-HR&SCT, PSSRINAGURATION BY GM/TUTICORIN 2X500 MW NTPL Tuticorin Site - CSR Activity

GM HR&SCT ADDRESSING – GUESTS AND SCHOOL STUDENTS

GM TUTICORIN ADDRESSING THE GATHERING