1 COIMBATORE INDUSTRIAL INFRASTRUCTURE ASSOCIATION (COINDIA) Pump, Motor and Foundry Cluster – Coimbatore – Tamil Nadu PROJECT IMPLEMENTATION REPORT (PIR)

Similar presentations


Presentation on theme: "1 COIMBATORE INDUSTRIAL INFRASTRUCTURE ASSOCIATION (COINDIA) Pump, Motor and Foundry Cluster – Coimbatore – Tamil Nadu PROJECT IMPLEMENTATION REPORT (PIR)"— Presentation transcript:

1

2 1 COIMBATORE INDUSTRIAL INFRASTRUCTURE ASSOCIATION (COINDIA) Pump, Motor and Foundry Cluster – Coimbatore – Tamil Nadu PROJECT IMPLEMENTATION REPORT (PIR) FOR THE IIUS PROJECT I.GENERAL As on 12.04.2006 1.Name and location of the Industrial ClusterPump, Motor and Foundry Cluster, Coimbatore. 2.Name and address of the SPV of the (with Telephone / Fax number and email Coimbatore Industrial Infrastructure Association 8/4, Race Course, Coimbatore 641 018 Tel: 0422-4394128, 4394227, Fax : 0422-2223076 Email: info@coindia.ininfo@coindia.in 3.Name, designation and address of the President and Managing Director of the SPV Sri G. Rajendran 46, ATT Colony, Coimbatore 641 018 4.URL address of the Web Site of the SPVWeb: www.coindia.inwww.coindia.in 5.Name, designation and address of the nominee directors of the State Government and other institutions (if any) Govt. of Tamil Nadu has communicated that GM, DIC, Cbe will represent the Industries Commissioner and Director of Industries and Commerce, for the time being in the Committee of SPV (GM – Sri.. S. Asokan) 1.Dr. R. Rudramoorthy, Representing R&D Institution. 6.Date of the last meeting of the Board of Directors (Pl. attach minutes of the meeting) 23 rd January 2006, Minutes of the meeting enclosed. Also available in our Website. 7.Break-up of employment in the SPV Appointed 1. Chief Financial Officer, 2.Project Engineer, 3. Accounts Officer and 4. Office Assistant/Secretary and they have joined duty. The services of SIEMA staff is also being utilized. 8.Whether statutory clearances have been obtained from respective agencies for implementation of the project? Kindly give details thereof. None required for the activities commenced. 9.Whether information about various tenders and contracts of different work are made available on the website of the SPV Yes. All the details of tender and decisions of meeting are available in the website.

3 2 II. FINANCIAL PROGRESS 10.Name and address (with Telephone / Fax numbers and email) of the Bank holding the Project account (Trust and Retention Account ) of the SPV and the Project Account Number. State Bank of India, Commercial Branch Trichy Road, Coimbatore 641 018 Tel: 0422-2302943, 44 Fax : 0422-2301823 Email: sbifbcbe@vsnl.comsbifbcbe@vsnl.com IIUS Grant A/c No.1049607433-6 Project No lien Account viz. Trust and Retention Account No.:1049607434-7 11.Reserve Fund Account Number1049607432-5 12.Project Components and break-up of Project Cost in Rs. Lakh: Sl.Project Component 1 Total Project Cost Total IIUS Grant Amount released / contribution received till dateExpenditure incurred till date IIUS Grant Bank / FI (if any) SPVTotal Expenditure vis-à-vis IIUS Grant Total Expenditure 1)Building for Business Center Training & Information Centre Segment-4 Sl.No.7 of Approval Letter 150113 15114.72242.72113242.72 2)Land for segment 4 and partly for segment 1, Segment-4 Sl.No.5 & Segment-1 Sl.No.1 of Approval Letter. 232Nil 228.84 Nil228.84 3)Administrative Expenses (3.71+2.02+5.52+9.00) -11920.25Nil 20.25

4 3 12.Project Components and break-up of Project Cost in Rs. Lakh: Sl.Project Component 1 Total Project Cost Total IIUS Grant Amount released / contribution received till dateExpenditure incurred till date IIUS Grant Bank / FI (if any) SPVTotal Expenditure vis-à-vis IIUS Grant Total Expenditure 4)Covered Under Tender 1, 2 & 3 of 2005. a) Infrastructure for Business Centre, segment 4 Sl.No.2 of Approval Letter. b) For Purchase of Equipments such as Spectrometer, Equipments for Testing and Upgradation of Si’Tarc Testing Lab Segment 4 Sl.No.3 & 8 of Approval Letter. c) Testing System for 60Hz supply and Equipments for testing Segment 4 Sl.No.9 & 13 of Approval Letter (101.77) + (99.47) + (37.0) + (105.0) 257.43244.70Nil81.55326.25244.70326.25 343.24

5 4 12.Project Components and break-up of Project Cost in Rs. Lakh: Sl.Project Component 1 Total Project Cost Total IIUS Grant Amount released / contribution received till date Expenditure incurred till date IIUS Grant Bank / FI (if any) SPVTotal Expenditure vis-à-vis IIUS Grant Total Expenditure 5.Construction of R.C.C. Building for Office & Library with a plinth area of (Approx) 2000 Sq.ft. / foundation designed for G+2 floors and construction of asbestos cement sheet roof building with a plinth area of 2000 Sq.Ft. at COSMAFAN Foundry & Industrial Park at Arasur, Coimbatore District. (Project Item 1, Sl.No.2 & 5). 29.522.12 6.Construction of R.C.C. framed structure building for Office & Library of Plinth area (Approx) 2000 Sq.ft./foundation designed for G+2 floors and construction of asbestos cement sheet roof building with a plinth area of 2000 Sq.ft. at COFIOA Foundry & Industrial Park at Kallapalayam (Project Item 1, Sl.No.2 & 5). 29.522.12

6 5 12.Project Components and break-up of Project Cost in Rs. Lakh: Sl.Project Component 1 Total Project Cost Total IIUS Grant Amount Released / contribution received till date Expenditure Incurred till date IIUS Grant Bank / FI (if any) SPVTotal Expenditure vis-à-vis IIUS Grant Total Expenditure 7 Laying of roads with culverts at COSMAFAN Foundry Industrial Park at Arasur (Project Item 1, Sl.No.5). 192144.0 8. Laying of roads with culverts at COFIOA Foundry Industrial Park at Kallapalayam (Project Item 1, Sl.No.5). 3022.5 TOTAL = SLNO. 5+6+7+8281.00210.74 162.39NIL54.14216.53162.39 216.53 9. Tender No.8/2005 Construction of buildings and creating infrastructure at an estimated cost of 438 lakhs sl.no.3&4 of item no.I and sl.no.6 of item no.IV. 438.00328.5265.09Nil88.50353.59265.09353.59 10. Registration of land 70 cents for creating common facilities at Arasur at COSMAFAN foundry industrial park. Item I, Sl.No.1 8.75Nil 8.75 - 11. Registration of land 30.3 cents for creating common facilities at Kallapalayam at COFIOA foundry industrial park. Item I, Sl.No.1 3.03Nil 3.03 - 12 Registration of land 40.25 cents for creating common facilities at Manickampalayam COSMAFAN industrial park. Item I, Sl.No.1 8.05Nil 5.03 -8.05 Total Expenditure Rs 1408.01 Total outstanding balance in the IIUS Grant account as on date (Rs. in Lakhs) Rs.494.48 1.a) Sl.No 5 to 8 Cost Estimate is inclusive of office equipments, furniture, library racks Drainage and water supply Other facilities will be included after completion of the building work in II phase. 2) Apart from the utilized funds mentioned above, the Committee (SPV) also approved on 06.04.2006 for the additional eligible items for Rs.465.74 lakhs, which will be utilized on releasing tenders before 30.06.2006.

7 6 III. PHYSICAL PROGRESS 13. Actual project accomplishments till date for each project component and implementation schedule. Sl.NoProject ComponentDate of estimate sanction Date of Tender Issue Date of Work Order Date of Commencement of Work Status of Work Completion in % Likely date of Completion 1.Acquisition of 1.06 acres of land at Avarampalayam, Peelamedu, for segment 4 and partly for segment 1Item IV Sl.No 5 16.07.2005N.A. 03.08.2005100%Document Registered on 01.09.2005 2.Acquisition of building at II floor at Race Course to an extent of 3974 Sq.Ft. built up area Plus 1649 Sq.Ft. Vacant area for creating multiple facilities under Segment 4 of the project. Item IV Sl.No.7 16.07.2005N.AN.A.03.082005100%Document Registered on 03.08.2005 3.Creation of Business Centre Item IV, Sl. No. 2 Tender Notice 3/2005 16.07.200511.08.200518.10.200530.10.200590%30.04.2006 4.Purchase of equipments like Spectrometer, equipments and facilities to upgrade the Si’Tarc Testing Lab Item IV Sl.No. 3 & 8 Tender Notice 1 & 3/2005 16.07.200511.08.200518.10.200530.10.200575%31.05.2006 5.Testing System for 60 Hz Supply and equipments/machineries for Si’Tarc Item IV, Sl.No. 9 & 13 Tender Notice 2/2005 16.07.200511.08.200518.10.200530.10.200575%31.05.2006

8 7 Sl.NoProject ComponentDate of estimate sanction Date of Tender Issue Date of Work Order Date of Commence- -ment of Work Status of Work Completion in % Likely date of completion 6.Acquisition of land for creating common facilities at Arasur at COSMAFAN foundry industrial park. Item I, Sl.No.1 21.09.2005N.A. 27.10.2005100%Land Registered on 07.11.2005 7.Acquisition of land for creating common facilities at Kallapalayam at COFIOA foundry industrial park. Item I, Sl.No.1 21.09.2005N.A. 19.10.2005100%Land Registered on 17.11.2005 8.Creating Infrastructure at Arasur such as a) laying of roads, b) construction of office and c) meeting hall building for an estimate of Rs.180 lakhs. Item I, Sl.No.2 & 5 21.09.200529.10.2005Before Dec 5 th 2005 05.12.2005 40%31.07.2006 9.Creating Infrastructure at a) Kallapalayam such as laying of roads, b) construction of office and c) meeting hall building for an estimate of Rs.50 lakhs. Item I, Sl.No.2 & 5 21.09.200529.10.2005Before Dec 5 th 2005 05.12.2005 40%31.07.2006

9 8 Sl.NoProject ComponentDate of estimate sanction Date of Tender Issue Date of Work Order Date of Commencement of Work Status of Work Completion in % Likely date of Completion 10. Construction of buildings and creating infrastructure in a total building area around 60,000 Sq.Ft. at an estimated cost of Rs.438 lakhs for a)Training centre / seminar hall / small group meetings. Item I, Sl.No. 3 and 4. b)Product Die and Mould Centre.Item IV, Sl.No. 6. c)Skill upgradation – product development facilities including pattern shop and CAD and CAM Training center for engineers / workers / women workers: item No. I, Sl.No 4. 21.09.2005Before 31.12.2005 22.02.06 15%- a) 12 months b) 12 months c) 12 months 11. High Precision Vertical machining centre and CNC Lathes Vertical & Horizontal machines Item No IV Slno. 1 Estimated cost Rs.250 lakhs. 23.01.0610.02.0630.06.06 NilNov 2006 12. Creation of training infrastructure, office facilities including building, false ceiling, A/C,etc., Estimated cost Rs.50Lakhs. Item IV S.No:14 23.01.0615.05.0615.06.0621.06.06NilWithin 6 Months 13. Up-Gradation of SiTarc facilities Construction of buildings Tool Room Machines etc estimated cost Rs.135.54 Lakhs item IV Slno.13 06.04.0605.05.0605.06.0611.06.06NilWithin 6 Months 14 Acquisition of 0.4025 acres land for creating common facilities at Manickampalayam in COSMAFAN Foundry industry park (item no.I, sl.No.1) 06.04.06NA 100%Land registered on 2 nd March 2006 15 Building, drainage, street light, roads, weigh bridge, water supply etc for small foundry industrial park’s requirements (item no.I, sl.no.2 & 5). Estimated cost Rs 243.50 lakhs 06.04.0605.05.0605.06.0611.06.06 Nil 16 Construction of Canteen building at two places for small foundry (item no.I, sl.no.9).Estimated cost Rs 36.7 lakhs 06.04.0605.05.0605.06.0611.06.06 Nil

10 9 14. Any Other Relevant Information : We request GOI – DIPP to release the II installment of IIUS GOI grant at the earliest, so as to enable COINDIA to implement the cluster project with in the projected timeframe. Date : 12.04.2006 Place : Coimbatore