Submission doc.: IEEE 11-10/0897r0 July 2014 Jon Rosdahl, CSRSlide 1 802-11 PAR Review – July 2014 Date: 2014-07-15 Authors:

Slides:



Advertisements
Similar presentations
PAR Review – July 2014 Date: Authors: July 2014
Advertisements

Doc.: IEEE /0085r2 Submission July 2011 Gerald Chouinard, CRCSlide Response to Comments received on the proposed a PAR and 5C Date:
CSD for P802.1AS-REV WG Wednesday, 05 November 2014.
Submission doc.: IEEE /0230r1 March 2015 Jon Rosdahl, CSRSlide 1 PAR Review SC – Closing Report – March 2015 Date: Authors:
Submission doc.: IEEE /0229r1 March 2015 Jon Rosdahl, CSRSlide PAR Review March 2015 Date: Authors:
Submission doc.: IEEE r PAR Review March 2015 Date: July 2015 Jon Rosdahl, CSRSlide 1 Authors:
Submission doc.: IEEE r PAR Review July 2015 Date: July 2015 Jon Rosdahl, CSRSlide 1 Authors:
Report doc.: IEEE 11-14/0843r0 July 2014 Jon Rosdahl, CSRSlide 1 1st Vice Chair Report July San Diego Date: Authors:
Doc.: IEEE wng0 Submission January, 2015 Shoichi Kitazawa, ATRSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
Submission doc.: IEEE 11-13/0333r1 March 2013 Jon Rosdahl, CSR Technology Inc.Slide Review of March 2013 Proposed Pars Date: Authors:
Submission doc.: IEEE r2 Comments From IEEE with Resolution July 2015 Slide 1.
PAR and CSD for P802.1Qxx WG January PAR (1) 1.1 Project Number: P802.1Qxx 1.2 Type of Document: Standard 1.3 Life Cycle: Full Use 2.1 Title:
Submission doc.: IEEE 22-14/0103r1 Apurva N. Mody, BAE SystemsSlide EC Closing Motions Package Date: Authors:
Report doc.: IEEE 11-14/0843r0 July 2014 Jon Rosdahl, CSRSlide 1 1st Vice Chair Report July San Diego Date: Authors:
Submission doc.: IEEE 11-14/0319r1 March 2014 Jon Rosdahl, CSRSlide Proposed PAR Review March 2014 Date: Authors:
Consolidated comments on LASG 802c PAR and CSD Stephen Haddock March 11,
Submission doc.: IEEE r PAR Review July 2015 Date: July 2015 Jon Rosdahl, CSRSlide 1 Authors:
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
IEEE Std revision P802.3REV includes merge of: –IEEE Std (minus Link Aggregation) –Approved amendments 802.3an, 802.3aq, 802.3as.
Doc.: IEEE /0748r2 Submission May 2011 Tom Siep, CSRSlide 1 Process for Creating TGai Draft Date: Authors:
Doc.: IEEE /0943r0 Submission July Vertical Applications Technical Advisory Group Liaison Report Date: Slide 1 Author:
Submission doc.: IEEE 14-22/0098r0 July 2014 Slide 1 P PAR and CSD Comment Resolution Date: Authors:
Doc.: IEEE /1220r0 Submission November 2009 Jon Rosdahl, CSRSlide 1 WG11 Comments on PARs submitted Nov 2009 Date: Authors:
Doc.: IEEE /1109r0 Submission Month Year Tom Siep, CSRSlide 1 Amendment Creation Process Date: YYYY-MM-DD Authors:
Submission doc.: IEEE r PAR Review SC November 2015 Date: November 2015 Jon Rosdahl, CSR-QualcommSlide 1 Authors:
Doc.: IEEE /0904r1 Submission July 2012 Jon Rosdahl (CSR)Slide Review of July 2012 Proposed Pars Date: Authors:
Submission doc.: IEEE r PAR Review SC November 2015 Date: November 2015 Jon Rosdahl, CSR-QualcommSlide 1 Authors:
Submission doc.: IEEE 11-14/1339r1 November 2014 Jon Rosdahl, CSRSlide PAR Review November 2014 Date: Authors:
Submission doc.: IEEE 14-22/0098r0 July 2014 Slide 1 P PAR and CSD Comment Resolution Date: Authors:
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
Submission doc.: IEEE 11-14/0319r0 March 2014 Jon Rosdahl, CSRSlide Proposed PAR Review March 2014 Date: Authors:
Doc.: IEEE /0356r0 Submission March 2009 Jon Rosdahl, CSRSlide 1 New WG PARs that WG11 must consider in March 2009 Date: Authors:
Doc.: IEEE /0860r0 Submission July 2010 Jon Rosdahl, CSRSlide 1 Comments for p New PAR – July 2010 Date: Authors:
Submission doc.: IEEE r3 PAR Review - Agenda and Meeting slides - March 2016 Date: March 2016 Jon Rosdahl (Qualcomm) Authors:
Submission doc.: IEEE 11-14/1339r4 November 2014 Jon Rosdahl, CSRSlide PAR Review November 2014 Date: Authors:
Submission doc.: IEEE 11-14/1339r3 November 2014 Jon Rosdahl, CSRSlide PAR Review November 2014 Date: Authors:
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
Doc.: IEEE /1373r1 Submission November 2008 Jon Rosdahl, CSRSlide 1 Feedback received on Revision PAR Date: Authors:
PAR Review - Agenda and Meeting slides - March 2016
PAR Review - Meeting Agenda and Comment slides - Vancouver 2017
PAR Review - Meeting Agenda and Comment slides - San Antonio 2016
PAR Review - Meeting Agenda and Comment slides - July Berlin
P802.11aq Waiver request regarding IEEE RAC comments
Review of March 2013 Proposed Pars
July 2017 Response to comments on 802.1ACct - Amendment: Support for IEEE Std  PAR and CSD July 2017 Thomas Kürner, Chair TG3d .
Sub-1 GHz Study Group Closing Report Sept 2018
Response to Comments Received on the a PAR and CSD
Comments for Nov 2010 EC PAR proposals.
July 2017 Response to comments on 802.1ACct - Amendment: Support for IEEE Std  PAR and CSD July 2017 Thomas Kürner, Chair TG3d .
WG11 response to Proposed 802 PAR - March Orlando Plenary
Privacy Recommendation PAR Proposal
comments on Pending 802 PARs – July 2011
Feedback received on Revision PAR
Response to Comments on P802.22b PAR and 5C
comments on Pending 802 PARs – July 2011
July doc.: IEEE /0997r0 July Response to Comments received on the proposed a PAR and 5C Date: Authors: Gerald.
Comments for p New PAR – July 2010
Report on Date: Authors: January 2019 July 2013
PAR Review - Meeting Agenda and Comment slides - Vancouver 2017
March 2019 doc.: IEEE /r2 March 2019
PAR Review - Agenda and Meeting slides - March 2016
Comments for Rev PAR – July 2010 Plenary
Comments for Nov 2010 EC PAR proposals.
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Response to PAR and 5C Comments.
March 2012 doc.: IEEE /0368r1 March 2012
MArch 2019 doc.: IEEE /r0 March 2019
P802.11aq Waiver request regarding IEEE RAC comments
March 2019 doc.: IEEE /r1 March 2019
Comments for Rev PAR – July 2010 Plenary
PAR Review SC – Closing Report – March 2015
Presentation transcript:

Submission doc.: IEEE 11-10/0897r0 July 2014 Jon Rosdahl, CSRSlide PAR Review – July 2014 Date: Authors:

Submission doc.: IEEE 11-10/0897r0 July 2014 Jon Rosdahl, CSRSlide 2 Abstract Review of the PARS for consideration for July

Submission doc.: IEEE 11-10/0897r0July 2014 Jon Rosdahl, CSRSlide II PARs for review this week 802.1ARce - Secure Device Identity, Amendment 1: Amendment 1: SHA-384 and P-384 Elliptic Curve, PAR and CSDPARCSD 802.1AEcg - Media Access Control (MAC) Security - Amendment: Ethernet Data Encryption devices, PAR and CSDPARCSD 802.3bv- amendment, 1000 Mb/s Operation Over Plastic Optical Fiber, PAR and CSDPARCSD 802.3bw - amendment, 1 Twisted Pair 100 Mb/s Ethernet, PAR and CSDPARCSD ah, Sub 1 GHz, PAR extension request, PAR and CSDPARCSD ai, Fast initial link setup, PAR extension request, PAR and 5C (grandfathered)PAR5C (grandfathered) , amendment enabling Spectrum Resource Measurement Capability, PAR and CSD PARCSD , Specifying Spectrum Occupancy Sensing (SOS) Measurement Devices and Means that Enable Coalescing the Results from Multiple Such Devices, PAR and CSDPARCSD

Submission doc.: IEEE 11-10/0897r Charter Change In the proposed process for creating Task Groups (TGs) under , a proposed TG scope document is circulated 30 days in advance of a plenary to solicit comments from the WGs. According to the proposed process, this follows the PAR process in that comments are due by 5 pm Tuesday of the plenary week and responses are due by 5 pm on Wednesday. The Smart Grid TAG approved a TG scope document for a Smart Grid TG, Smart-Grid-TG-Scope.pdf, which can be found at: smart-grid-tg-scope.pdf smart-grid-tg-scope.pdf Slide 4Jon Rosdahl, CSR July 2014

Submission doc.: IEEE 11-10/0897r0 COMMENTS FOR JULY 2014 PARS FOR CONSIDERATION. Comments from PAR AdHoc Committee July 2014 Jon Rosdahl, CSRSlide 5

Submission doc.: IEEE 11-10/0897r ARce - Secure Device Identity, Amendment 1: Amendment 1: SHA-384 and P-384 Elliptic Curve, PAR and CSDPARCSD 1. Expand Acronyms for first usage in Scope/Title/Purpose. “SHA-384, P-384, ECDSA” Slide 6Jon Rosdahl, CSR July 2014

Submission doc.: IEEE 11-10/0897r AEcg - Media Access Control (MAC) Security - Amendment: Ethernet Data Encryption devices, PARPAR 4.1 and 4.2: Check the Start of Sponsor Ballot and the Submission to RevCom dates…They do not seem reasonable. Note that the dates that are listed seem to be close to date that a new revision is needed. Have you considered just getting this amendment done in conjunction with a Revision PAR? 5.5 Change “separate bridging systems (Ethernet Data Encryption devices, EDEs) “ to separate bridging systems, Ethernet Data Encryption devices, (EDEs) 8.1 Add the full name of the 802.1AE, 802.1X, and 802.1Q standards. 8.1: Where is “#7.3”? This comment may be a hold over, or miss labeled. 5.6 – consider making the Stakeholders: Developers and users of secure networking equipment. Slide 7Jon Rosdahl, CSR July 2014

Submission doc.: IEEE 11-10/0897r AEcg - Media Access Control (MAC) Security - Amendment: Ethernet Data Encryption devices, CSDCSD 1.2 Broad Market Potential: “…number of significant users…” what number? Who are these significant users? 1.2.2/1.2.3 missing “Std” on several of the standards cited change “802.1AE-2006” to “IEEE Std 802.1AE-2006” Please check in the CSD for other instances of missing proper citation. Slide 8Jon Rosdahl, CSR July 2014

Submission doc.: IEEE 11-10/0897r bv- amendment, 1000 Mb/s Operation Over Plastic Optical Fiber, PARPAR 5.6 change Stakeholder list: “Stakeholders identified to date include but are not limited to: user…s” to “Users…” 7.1 expand the acronym “VDE”… (not sure what VDE is). 7.1 From the CSD – “There are standardized specifications for data transmission over POF…leveraging those…” need to indentify the “other” standards that are similar that make up “those”. 8.1 suggest a bit of explanation on what is being stated… “. Its specifications” is this the VDE Document? Is the withdrawn standard being incorporated into this amendment? Slide 9Jon Rosdahl, CSR July 2014

Submission doc.: IEEE 11-10/0897r bv- amendment, 1000 Mb/s Operation Over Plastic Optical Fiber, CSDCSD From the title page “The following are the CSD Responses in relation to the IEEE P802.3xx PAR” this seems a bit Generic..Was the correct CSD provided? Slide 10Jon Rosdahl, CSR July 2014

Submission doc.: IEEE 11-10/0897r bw - amendment, 1 Twisted Pair 100 Mb/s Ethernet, PAR and CSDPAR CSD No Comment Slide 11Jon Rosdahl, CSR July 2014

Submission doc.: IEEE 11-10/0897r ah, Sub 1 GHz, PAR extension request, PAR and CSDPARCSD No comment Slide 12Jon Rosdahl, CSR July 2014

Submission doc.: IEEE 11-10/0897r ai, Fast initial link setup, PAR extension request, PAR and 5C (grandfathered)PAR5C (grandfathered) No comment Slide 13Jon Rosdahl, CSR July 2014

Submission doc.: IEEE 11-10/0897r , amendment enabling Spectrum Resource Measurement Capability, PAR and CSDPARCSD b) needs a response: b)Proven similar technology via testing, modeling, simulation, etc. Slide 14Jon Rosdahl, CSR July 2014

Submission doc.: IEEE 11-10/0897r , Specifying Spectrum Occupancy Sensing (SOS) Measurement Devices and Means that Enable Coalescing the Results from Multiple Such Devices, PAR and CSDPARCSD 2.1 Title – Consider that “SOS” is a internationally recognized acronym for emergency requests. Consider changing or eliminating the acronym… 5.2 The Scope should not talk about the “project”, but rather describe the document that will be created. Please remove project specific definitions and instead describe what the standard will be defining. 5.2 “initially” defines? The Standard will have a set definition that as far as this revision is concerned is the only one that will exist. Do not describe or promise future enhancements. 8.1 is for extra explanation for identified clauses. The clause id is not included. Generally a history is not included in 8.1 CSD: – Cite standards correctly. CSD: Seems the History is repeated for several responses. CSD: Seems overly verbose Slide 15Jon Rosdahl, CSR July 2014

Submission doc.: IEEE 11-10/0897r Charter Change In the proposed process for creating Task Groups (TGs) under , a proposed TG scope document is circulated 30 days in advance of a plenary to solicit comments from the WGs. According to the proposed process, this follows the PAR process in that comments are due by 5 pm Tuesday of the plenary week and responses are due by 5 pm on Wednesday. The Smart Grid TAG approved a TG scope document for a Smart Grid TG, Smart-Grid-TG-Scope.pdf, which can be found at: smart-grid-tg-scope.pdf smart-grid-tg-scope.pdf Slide 16Jon Rosdahl, CSR July 2014

Submission doc.: IEEE 11-10/0897r Comments Concern: Not seen large numbers interested in attending If we are creating White papers instead of Standards, then are we needing to create a new process. Can the Industry Connection be a process that is sufficient rather than change ? Slide 17Jon Rosdahl, CSR July 2014

Submission doc.: IEEE 11-10/0897r0July 2014 Jon Rosdahl, CSRSlide 18 References