Project Nexus Workgroup Unique Sites 4 th November 2014.

Slides:



Advertisements
Similar presentations
Third Energy Package for Change of Supplier 2009/73/EC.
Advertisements

12/10/20141 Project Nexus Workgroup Settlement Issues 15 th May 2012.
Application of User Pays Principles to Existing Service Lines 22nd November 2006.
COR2557: Revisions to the Metering Charges Pricing Module on Unique Sites UK Link Committee – January 2014.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
Implementation of Non Effective Days Nexus Workgroup – March
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
CSEP Transportation Charges 11 th August Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
PN UNC Workgroup Supply Point Register 25 th October 2011.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Project Nexus Workgroup Read Validation following Transfer of Ownership 13 th October
Nexus Workgroup CSEP Transition Topic June
IGT Single Service Provision Requirements Update – 27 th March 2013.
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UP presentation Transmission wstream Jan 08 1 user pays services implementation January 2008.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
PN UNC Workgroup iGT Services 7 th February 2012.
Distribution Network Interruption - Initialisation 28 September 2010.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Project Nexus Workgroup – Invoicing 11 th August 2014.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
PN UNC 4 th September 2012 Reconciliation Issues (Action: NEX06/02)
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Connected System Exit Points Options for strategic regime change Chris Warner.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
IGT and Shipper Workgroup meeting 28 th February 2011.
User Pays User Committee 12th November 2013
Modifications iGT 039 and GT 0440 re iGT Agency Services background
Non-Standard Sites Administration Processes Reference Guide
Non-Standard Sites Administration Processes Reference Guide
Unique Sites End to End Process Walkthrough
Must Read Process Guide For Shippers
Confirmation Notice Period for Certain ‘Unique’ Sites
Project Nexus Workgroup MPRN Lifecycle 11th August 2014
iGT Agency Services Background
Project Nexus Workgroup
Project Nexus Workgroup
Industry Shipperless & Unregistered Working Group
CSS Consequential Change CoS Shell Record Submission for Discussion at 630R 27th April 2018.
Project Nexus Workgroup
PN UNC Workgroup iGT Services
UKL Committee - DN Interruption Update
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Project Nexus Workgroup
UK Link Replacement Programme additional supporting UNC modifications
SPA Processes for DM Sites
Deferral of Retrospective Updates Functionality
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
Joint Theft Reporting Review (from meeting 1st March 2019)
Project Nexus Workgroup
DN Interruption Phase II
Invoicing Proposals 20th May 2013
Implementation Approach Distribution Workgroup – June 2014
Meter Reads.
Project Nexus Workgroup
Modification 440 Project Nexus iGT Single Service Provision
PN UNC Workgroup (AQ topic)
High Level System Solution Impact Assessment
Customer Issue Management CoMC Update for April & May 2019
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
Customer Issue Management Dashboard CoMC
Presentation transcript:

Project Nexus Workgroup Unique Sites 4 th November 2014

Key Points Unique Sites are currently maintained ‘offline’ to UKLink due to complex processes. Requirement from PN UNC for Unique Sites to be held and maintained on the Supply Point Register (UKLink). All existing Unique Sites will be migrated to UKLink for Go Live All SPA and update processes will be managed via file interface with a few exceptions All transportation charges will be included on the standard invoices. All LDZ Unique Sites will have a Confirmation Reference Number allocated, not an LMN (Logical Meter Number). NTS and LDZ Telemetered sites will continue to be allocated an LMN.

Overview of Changes – MPRN Creation For LDZ Supply Meter Points the MPRN will be created as per the existing process for directly connected sites, For NTS Supply Meter Points the MPRN will be created via liaison with National Grid Transmission. All Supply Meter Points will be assigned an MPRN. Currently NTS sites do not have an MPRN but a notional MPRN will be allocated in order that standard file flows can be utilised

Nominations will be submitted via the standard SPA file flows except for Shared Supply Meter Points (SSMPs) and Interconnectors (to be covered in a later slide) Nominations will be Referred to the appropriate Network/NGT for the following checks: –Contract i.e. NEXA –MNEPOR (NTS) –NEXA Max SOQ value is not available (CSO) –NTS/ LDZ Optional Commodity requested –Capacity revisions Overview of Changes – Nominations

Overview of Changes – Confirmations Confirmations will be submitted via the standard SPA file flows except for Shared Supply Meter Points (SSMPs) and Interconnectors (to be covered in a later slide) Objections will be processed as per SPA file flows For LDZ Supply Meter Points a Confirmation reference will be allocated & notified via SPA file flows For NTS and Telemetered Supply Meter Points an LMN will be allocated & notified via SPA file flows Standard transfer of ownership files will be issued to the Proposing & Outgoing Shipper

Overview of Changes – Supply Point Updates With the exception of SSMPs, all updates to the Supply Meter Point will be via the SPA file flows –Capacity requests will be via SPA file flows and will be Referred as required to the relevant Network for approval An AQ will be calculated monthly, subject to a valid read being received, and notifications issued Ratchets (LDZ) and Overruns (NTS) will be calculated as normal and Ratchet notification issued via the Ratchet notification files

Overview of Changes – Asset Updates All asset updates will be submitted via RGMA flows except for Supply Meter Points with ‘Special Metering Arrangements’ For Supply Meter Points with Special Metering Arrangements the GT will submit the asset updates which will be notified to the Shipper (via MRI file)

Shared Supply Meter Points Shared Supply Meter Points (SSMP) will not be included in standard SPA file flows, due to the complexity in time bound activities. It is proposed that the following activities are managed as part of an authorised route using standard templates: –Nominations –Offers –Withdrawal –Confirmation –Asset Updates A separate presentation has been provided regarding communication

Shared Supply Meter Points Cont. Supply Point updates may be made via file except where it would result in an amendment to the set-up of the SSMP i.e. capacity revision/change of Shipper, in which case it must be performed via re-nomination and confirmation. Where a withdrawal occurs at an SSMP, Xoserve will notify all other Shippers via . If as a result the site becomes a single Shipper Supply Meter Point a notification will be issued via SPA files.

Interconnectors Interconnectors have different data requirements to other sites, including the recording of specific contractual agreements, and will therefore be managed separately. Interconnectors will be directly confirmed via in order to provide the contract documentation required for processing.

Transition Requirements Confirmation Numbers will be generated, assigned and communicated in advance of Project Nexus implementation. These will replace the LMN’s for LDZ Supply Meter Points. Outstanding Offers and Referrals will be treated as per all other sites and will not be migrated. Transportation charges for the September billing period will be calculated & issued from legacy systems and files