Session 141 Vulnerability to a natural hazard can be defined as to the extent to which people will experience harm and property will be damaged from that.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Session 81 Comparative Emergency Management Session 8 Slide Deck.
Comparative Emergency Management
Establishing Basic Parameters: Risk Assessment
JUNE FLOODS AND STORMS Preliminary Damage Assessment Brief
Building Disaster Resilient Places: Asset Mapping and Data Collection Before A Crisis Deborah Tootle Community & Economic Development.
Vulnerability to Disaster. Vulnerability to Disaster Community Arise 2 Course Purpose Sharpen participants’ ability to plan for and respond to needs of.
Historic Preservation In Light of Historic Devastation: Sacred Sites and Cultural Assets P R E S E N T E D B Y Mike J. Robinson, CFM 4.
Recap of Day 1 Panel Day 1 Panel: Colonel (Sel) Mark Welshinger, OFCM (USAF)
State of Montana Hazard Mitigation Plan and Statewide Hazard Assessment – 2013 Update Montana State Hazard Mitigation Coordinator: Kent Atwood
Protection during Response (Place) – (Date) Day 1 Session 4.1: Protection of At-Risk Groups.
Societal Profile Consider strengths and vulnerabilities of people.
Community-based Disaster Management
Implications for Caribbean Capital Markets 25 May, 2011 Marlene Murray CFA Society of Trinidad and Tobago.
Hazard Mitigation Planning VI Session Name: Hazard Mitigation Planning VI Coastal Hazards Management Course Task 7.1: Monitor implementation Task 7.2:
Risk Evaluation Determines the relative seriousness of hazard risks as they affect the local community Session 20.
Research in State and Provincial Travel Offices Chapter 15 Research Methodologies.
Tasks in Step Two: Assess Hazard Vulnerability Session Name: Hazard Mitigation Planning II Coastal Hazards Management Course 2.1 Describe the community.
Historical Disaster Information System in Sri Lanka (Disaster Inventory Database Based on Desinventar) Anoja Seneviratne Director (Mitigation Research.
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
Implementing HAZUS-MH in Pre-Disaster Mitigation
Session 16: Distribution of Geospatial Data 1 Distribution of Geospatial Data in the Public Environment Hazard Mapping and Modeling.
Fostering New Ways of Working: New Practices Session 32.
Business Crisis and Continuity Management (BCCM) Class Session
Earthquake Loss Estimation
Hazards, Climate, and Environment Program Social Science Research Institute, University of Hawai`i at Mānoa FLASH FLOOD CONFERENCE SAN JOSE, COSTA RICA,
National Hurricane Conference Training Session Panel: Decision-Making Tools for Risk Management & Assessment Claire Drury, HAZUS Program Manager.
WMD & Emergency Planning Steps Session 12. Emergency Planning Steps Vulnerability Assessment Mitigation Efforts Emergency Response Planning Recovery.
Dam Hazard Consequences Assessment
Writing your Electric Cooperative Chapter July 7, 2011.
Knowing Your Own Community: Conducting a Social Vulnerability Assessment Sessions
Dr. Shane Parson, PE, CFM, URS (RAMPP Team)
HAZUS-MH is a multi-hazard risk assessment and loss estimation software program developed by the Federal Emergency Management Agency (FEMA). (animate on.
Hazard Mitigation Planning and Project Funding. Agenda Objectives Overview of Hazard Mitigation Hazard Mitigation Planning Mitigation Project Funding.
Strategies and Implications for Integrating GeoSpatial Technologies in Emergency Management Education Programs National Emergency Management Institute.
Romania Hazard Risk Mitigation & Emergency Preparedness Project Aurel Bilanici Ministry of Interior and Administrative Reform.
Infrastructure Profile Consider strengths and vulnerabilities of the built environment.
Estimation of Future Earthquake Annualized Losses in California B. Rowshandel, M. Reichle, C. Wills, T. Cao, M. Petersen, and J. Davis California Geological.
Our Mission MITIGATIONS. MEANING OF MITIGATION MITIGATION IS THE PERMANENT REDUCTION OF THE RISK OF DISASTER MITIGATION IS THE PERMANENT REDUCTION OF.
US Army Corps of Engineers BUILDING STRONG ® Texoma and Missouri Region JETS Training Symposium Resiliency Planning Through Hazard Vulnerability Analysis.
Session 181 Risk Analysis RISK = LIKELIHOOD X CONSEQUENCE.
THE LOW DOWN ON RISK ASSESSMENT HOW SAFE ARE OUR CITIES?
1 Welcome North Dakota State University Emergency Management & Planning Donald Borgen ND Division of Emergency Services ND GIS Users Conference.
Emergency Preparedness Demonstration (EPD) Project Community Leadership & Emergency Management Agencies.
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES The Disaster Mitigation Act of 2000.
City of Santa Rosa Hazard Mitigation Plan Project Kickoff.
US Army Corps of Engineers Coastal and Hydraulics Laboratory Steven A. Hughes, PhD, PE Coastal and Hydraulics Laboratory US Army Engineer Research and.
Damage Overview Overall damages assessment Environment Productive Social Infrastructure Total Damage.
Key Words in disaster Management Dhammika Mahendre.
Infrastructure Vulnerability Profile. Objectives: To identify key infrastructure concerns related to the pre-defined hazards and issues Identify needed.
Saving lives, changing minds. Gender and Diversity Applying a gender and diversity analysis to VCA Introduction to Resilience Training Thai.
Information Security Governance and Risk Chapter 2 Part 2 Pages 69 to 100.
Draft Recommendations from the NH Coastal Risks and Hazards Commission Sherry Godlewski Department of Environmental Services Coastal Adaptation Workgroup.
Session 7 Crisis and Risk Communication Session 7 Slide Deck Slide 7-1.
Risk assessment and Natural Hazards. Concept of vulnerability (e.g. fatalities in two contrasting societies) Deaths 1 …………………………………………
S3.1 session day 3 1 training delivered by Oxfam GB, RedR India and Humanitarian Benchmark; January 2012, Yangon, Myanmar approved by the Advisory.
Risks and Hazards to Consider Unit 3. Visual 3.1 Unit 3 Overview This unit describes:  The importance of identifying and analyzing possible hazards that.
Tourism Master Plan A master plan for tourism destinations usually incorporates concerns that includes all aspects of Tourism development process. Factors.
DISASTER VULNERABILITY, RISK AND CAPACITY
“Protecting the Public through Hazard Mitigation Planning”
Risk Assessment OSHA 21/09/ WHAT IS RISK ASSESMENT? Risk Assessment is the process of determining the possibility of short and long term unfavorable.
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES
Risk Assessment.
Risk Assessment.
Research Project Overview
DISASTER MANAGEMENT – WITH SPECIAL EMPHASIS ON EARTHQUAKE
Mass Movement Hazards and Risk
Hazards Planning and Risk Management Risk Analysis and Assessment
Group B – ranking criteria and prioritization
Presentation transcript:

Session 141 Vulnerability to a natural hazard can be defined as to the extent to which people will experience harm and property will be damaged from that hazard.

Session 142 HAZUS – A Risk Assessment Tool Hazards U.S. (HAZUS), is a standardized, nationally applicable earthquake loss estimation methodology that uses PC-based GIS software. HAZUS contains an extensive inventory of data that can help you conduct your loss estimation in a timely, cost-efficient manner.

Session 143 Task A: Determine the proportion of buildings, the value of buildings and the population in your community or state that are located in hazard areas. 1.Estimate or count total number of buildings, value of buildings and number of people in your community. 2.Estimate the total number of buildings, total value of buildings and number of people in each of your hazard areas. 3.Calculate the proportion of assets located in hazard areas. 4.Determine the location of expected growth in your community.

Session 144 Task B: Determine whether (and where) you want to collect additional inventory data. 1.Is there enough data to determine which assets are subject to the greatest potential damage? 2.Is there enough data to determine whether significant elements of the community are vulnerable to potential hazards? 3.Is there enough data to determine whether certain areas of historic, environmental, political and cultural significance are vulnerable to potential hazards? 4.Is there concern about a particular hazard because off its severity, repetitiveness or likelihood of occurrence? 5.Is additional data needed to justify the expenditure of community or state funds for mitigation initiatives? As you decide how much (additional) information to collect ask yourself these questions:

Session 145 Task C - Compile a detailed inventory of what can be damaged by a hazard event. Critical facilities Vulnerable populations Economic elements Special considerations Historic, cultural and natural resource areas Important facilities Determine the priorities for your inventory collection efforts.

Session 146 Task C – Continued Determine the size of the building Determine the replacement value Determine the content value Determine the function use or value Determine the displacement cost Determine the occupancy or capacity Gather building-specific information about the assets.

Session 147 Task C – Continued Gather hazard-specific information about the assets.

Session 148 Social Vulnerability Factors Income distribution Elderly populations Disabled populations Children Minority neighborhoods Language and cultural barriers Housing

Session 149 Infrastructure Vulnerability Factors Interdependence Age and state of repair Maintenance schedules Location Repair capabilities

Session 1410 Economic Vulnerability Factors Small businesses Jobs Insurance Lost wages Lost production Lost suppliers Lost market share

Session 1411 Environmental Vulnerability Factors Damage from a hazard event Development plans Damage from commerce Value Reduce impacts