Decision XXVI/9 progress Lambert Kuijpers Bella Maranion Roberto Peixoto Co-chairs XXVI/9 Task Force XXVI/9 Task Force1.

Slides:



Advertisements
Similar presentations
Report of the TEAP XXI/9 Task Force
Advertisements

T E A P a n d T O C s - A s s e s s m e n t , M O P - 20, D o h a 1 The TEAP and TOC 2010 Assessment Reports Timelines and issues that will be dealt.
Best Available Techniques (BAT)
T E A P a t M o n t r e a l P r o t o c o l M O P - 2 0, N o v , D o h a 1 TEAP Update Presentation for MOP-20.
Report of the Scientific Assessment Panel 20th Meeting of the Parties to the United Nations Montreal Protocol November 2008 Doha, Qatar Cochairs:
WP3: Fixing RES-H/C targets Lukas Kranzl, Andreas Müller RES-H Policy Kick-off, October 2008.
M o n t r e a l P r o t o c o l O E W G - 32, July 2012, Bangkok (Thailand) Response to Decision XXIII/5: Quarantine and Pre-shipment uses of Methyl.
Decisions of the Parties Related to Essential Use Nominations (EUNs) Ozone Secretariat 6 July 2008 Bangkok.
MBTOC Cochairs :  Mohammed Besri  Marta Pizano  Ian Porter Methyl Bromide CUE: Final Recommendations M o n t r e a l P r o t o c o l 26 th MOP,
INTERNATIONAL SCENARIO HPMP APPROVALS AND TECHNOLOGY.
1 HFC demand Lambert Kuijpers TEAP co-chair Workshop on HFC Management Paris, 11 July 2014.
Current and Future HFC Demand
Overall issues for adequate design for high-ambient temperature operation by: Samir Hamed Petra Engineering Ind. Co. Rtoc member.
1 Current and Future HFC Demand by Sectors Bella Maranion TEAP co-chair OEWG-35, Bangkok, 22 April 2015.
H F C M a n a g e m e n t W o r k s h o p, J u l y , P a r i sRoberto Peixoto - IMT Roberto A. Peixoto Maua Institute of Technology - IMT.
Summary of the rapporteurs Key conclusions of the Workshop on HFC Management: Technical issues K. Shepardson / S. Sicars OEWG Bangkok 22 April 2015.
Suitable alternatives at high-ambient temperatures for small and middle- size AC equipment By: Bassam Elassaad, Consultant - Lebanon Workshop on Management.
REPORT TO GRPE 71 ST SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE st GRPE, 8-12 June 2015, agenda.
UNEP Ozone Secretariat Workshop on HFC management: technical issues Overview of HFC Market Sectors Presentation by Lambert Kuijpers, Ray Gluckman and Sukumar.
ROADMAP FOR IMPLEMENTATION OF HCFC PHASE-OUT IN INDIA OZONE CELL GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT AND FORESTS.
Decision XXVI/7 HTOC.
1 ALTERNATIVE TECHNOLOGIES TO CFCs AND HCFCs OZONE CELL GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT & FORESTS.
TEAP XXVI/9 Task Force Report
Overview of the CFC MDI essential use process Prof Ashley Woodcock MD FRCP FMedSci University of Manchester.
Dr Daniel Colbourne 36th Meeting of the Open-ended Working Group of the Parties to the Montreal Protocol – Side Event UNEP.
Final TEAP XXV/5 Task Force report Presentation to MOP-26 Paris, 17 November 2014.
36th OEWG UNEP SIDE EVENT 22 J u l y , P a r i sRoberto Peixoto - IMT Roberto A. Peixoto Maua Institute of Technology – IMT Brazil Disclaimer: The.
TEAP Assessment Report 2014 M o n t r e a l P r o t o c o l M O P - 2 6, N o v e m b e r , P a r i s.
Availability of Low-GWP Alternatives Options for Near Term & Longer Term Transitions OZONACTION NETWORK FOR LATIN AMERICA AND THE CARIBBEAN OCTOBER 6-8.
Draft TEAP XXV/5 Task Force report Presentation to OEWG 34 Paris, 14 July 2014.
Secretariat’s report on ODS sales for uses onboard ships As requested by Decision XXIII/11, the As requested by Decision XXIII/11, the Secretariat’s report.
Using Montreal Protocol to Protect the Climate Kristen N. Taddonio U.S. Environmental Protection Agency Stephen O. Andersen Co-Chair, Technology & Economic.
1 1 Technology and Economic Assessment Panel Report on 2014 Assessment M o n t r e a l P r o t o c o l M O P - 2 5, O c t o b e r , B.
11 Response to Decision XXIV/8 TEAP Terms of reference, code of conduct, and disclosure and conflict of interest guidelines for the TEAP and its TOCs and.
Nano Draft Guidance and Pilot Projects Rob Visser UNITAR Senior Advisor Nano African Regional Meeting April 2011, Nairobi.
M o n t r e a l P r o t o c o l O E W G m e e t i n g, J u l y , P a r i s 1 TEAP Replenishment Task Force Report Assessment of.
Summary of Timeline Discussion: The three timeline options in the following slides reflect opportunities to evaluate progress on the draft and potential.
State of implementation of the decision III/6f regarding Ukraine (MOP 2, June, , 2008, Riga, Latvia)
1 1 Technology and Economic Assessment Panel M o n t r e a l P r o t o c o l M O P - 2 4, N o v e m b e r , Geneva.
44th GRSP Session Status report of Informal Group on FI Pierre CASTAING Chairman Informal Document No. GRSP (44th session, December 2008, agenda.
Maximising the climate benefits of the HCFC phase-out European Commission 36th OEWG, Paris, 20 July 2015 Lunch time Meeting: The EU amendment proposal:
Challenges Faced by Companies in Article 5 Parties in Converting to Low-GWP options R K Mehta RAMA – INDIA 20 th & 21st April 2015 Bangkok.
Draft Report - June 2013 OEWG-33 – Bangkok, Thailand.
1 OZONE CELL GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT & FORESTS INDIA’S PERSPECTIVE ON PHASE DOWN OF HYDROFLUOROCARBONS (HFCs) UNDER THE AMBIT OF VIENNA.
TEAP XXVI/9 Updated Task Force Report Lambert Kuijpers Bella Maranion Roberto Peixoto TF co-chairs T E A P MOP-27 Dubai, 2015.
M o n t r e a l P r o t o c o l M O P - 2 6, N o v e m b e r , P a r i s 1 TEAP XXV/8 Task Force Report SUPPLEMENT to the Assessment of.
T E A P, R e p l e n i s h m e n t T F, P r e s e n t a t i o n a t O E W G TEAP Replenishment Task Force Report Assessment of the Funding Requirement.
TECHNOLOGY TRANSFER AND NATIONAL COMMUNICATIONS UNFCCC /UNDP EXPERT MEETING ON METHODOLOGIES FOR TECHONOLGY NEEDS ASSESSMENTS SEOUL, KOREA April.
. Thematic Working Group 4 Possible Elements – Chapter VI: Constraints, gaps and related financial, technical and capacity needs CGE Workshop to exchange.
The Committee on Technical Barriers to Trade Good Regulatory Practice Presentation by Mr. Margers Krams Chairman of the TBT Committee.
The FDES revision process: progress so far, state of the art, the way forward United Nations Statistics Division.
1 1 TEAP Progress Report vol. 5 TEAP Response to Decision XXV/6 M o n t r e a l P r o t o c o l O E W G m e e t i n g, J u l y ,
1 Vienna Convention for the Protection of the Ozone Layer/Montreal Protocol: lessons learned from the phase-out of ozone-depleting substances process and.
THE SIWG ON LEGAL CLARITY: FROM COP-10 to SIWG-3 Juliette Voinov Kohler Legal and policy advisor Third meeting of the SIWG, Geneva, September 2015.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
Update on HPMP preparation Art. 5 and CEIT ECA Network meeting - May 18-22, 2009 Yerevan, Armenia.
Paragraph 29 Study: Study on the various types of mercury- emitting sources, current and future trends of mercury emissions, including analyzing and assessing.
International Environmental Update Tom Cortina Halon Alternatives Research Corporation IASFPWG Meeting November 5-6, 2003 Atlantic City, New Jersey.
REPORT OF THE ELECTRONIC WORKING GROUP UNEP(DEC)/CAR WG.29/INF.12
TEAP Assessment Report 2014
Report of the XXII/10 Task Force
EU Reference Centres for Animal Welfare
TEAP XXV/8 Task Force Report
Decision XXV/5 Final TEAP XXV/5 Task Force report
Progress in Replacing Halons in Civil Aviation
Javier Hanna, UNFCCC secretariat, MDA
Radiation Safety Information Management System (RASIMS)
South Asia Ozone Officers Network Meeting
Surveys on ODS alternatives
Presentation transcript:

Decision XXVI/9 progress Lambert Kuijpers Bella Maranion Roberto Peixoto Co-chairs XXVI/9 Task Force XXVI/9 Task Force1

Outline Introduction Decision XXVI/9 Decision XXVI/9 Task Force Topics: – Refrigerants – RAC subsector information – BAU and MIT scenario revision – High ambient temperatures – Fire protection – Medical uses Concluding remarks XXVI/9 Task Force2

Introduction Decision XXVI/9 requested a draft report from TEAP for consideration at the OEWG planned for July 2015 The draft report responding to Decision XXVI/9 is still to be completed and then reviewed by the TEAP according to its Terms of Reference and will be available at the beginning of June 2015 The draft report will be presented to Parties for consideration and full discussion at the OEWG in July 2015 XXVI/9 Task Force3

Introduction (2) Owing to resourcing issues, the Task Force could not start work until mid-February 2015 The Ozone Secretariat informed TEAP that an extract of the work in progress would be required from the Decision XXVI/9 Task Force by the end of March 2015 The only purpose of the extract was to assist in the discussions at the OEWG in April 2015, and TEAP has not reviewed it TEAP understands that Parties need accurate data in a timely fashion. TEAP does need adequate time to be able to deliver reliable information. TEAP requests coordination of reasonable timelines for these outputs in the future Information will change as work proceeds towards the finalisation of the Decision XXVI/9 Task Force Report XXVI/9 Task Force 4

Decision XXVI/9 The XXVI/9 report will build on previous reports on alternatives to ODS (Decisions XXIII/9, XXIV/7, XXV/5) The Decision requests a draft report from TEAP for consideration at OEWG-36 and an updated report for MOP-27 – Request for “a report identifying the full range of alternatives, including not-in-kind technologies, and identifying applications where alternatives fulfilling the criteria identified …in the present decision are not available” – Provide information on energy efficiency levels in the refrigeration and air-conditioning sector referring to high- ambient temperature zones in international standards; – Taking into account the uptake of various existing technologies, revise the scenarios for current and future demand elaborated in the October 2014 final report XXVI/9 Task Force5

Decision XXVI/9 (cont’d) a) Update information on alternatives to ozone-depleting substances in various sectors and subsectors and differentiating between parties operating under paragraph 1 of Article 5 and parties not so operating, considering energy efficiency, regional differences and high ambient temperature conditions in particular, and assessing whether they are: (i) Commercially available; (ii) Technically proven; (iii) Environmentally sound; (iv) Economically viable and cost effective; (v) Safe to use in areas with high urban densities considering flammability and toxicity issues, including, where possible, risk characterization; (vi) Easy to service and maintain; and describe the potential limitations of their use and their implications for the different sectors, in terms of, but not limited to, servicing and maintenance requirements, and international design and safety standards; XXVI/9 Task Force6

Decision XXVI/9 (cont’d) (b) Provide information on energy efficiency levels in the refrigeration and air-conditioning sector referring to high-ambient temperature zones in international standards; (c)Taking into account the uptake of various existing technologies, revise the scenarios for current and future demand elaborated in the October 2014 final report on additional information on alternatives to ozone-depleting substances of the TEAP’s task force on XXV/5, and improve information related to costs and benefits with regard to the criteria set out in paragraph 1 (a) of the present decision, including reference to progress identified under stage I and stage II of HCFC phase-out management plans; XXVI/9 Task Force7

Decision XXVI/9 Task Force CO-CHAIRS: Lambert Kuijpers (The Netherlands, TEAP/RTOC) Bella Maranion (USA, TEAP) Roberto Peixoto (Brazil, TEAP/RTOC) MEMBERS: Daniel Colbourne (UK, RTOC) Martin Dieryckx (Belgium, RTOC) Rick Duncan (USA, FTOC) Bassam Elassaad (Lebanon, RTOC) Samir Hamed (Jordan, RTOC) Yilhan Karaagac (Turkey, FTOC) Tingxun Li (China, RTOC) Carloandrea Malvicino (Italy, RTOC) Keiichi Ohnishi (Japan, TEAP/CTOC) Alaa A. Olama (Egypt, RTOC) Fabio Polonara (Italy, TEAP/RTOC) Rajan Rajendran (USA, RTOC) Helen Tope (Australia, TEAP/MTOC) Dan Verdonik (USA, TEAP/HTOC) Richard Lord (USA, outside expert) Samuel Yana-Motta (Peru, outside expert) Denis Clodic (France, outside expert) XXVI/9 Task Force8

R/AC: Refrigerants  The extract contains preliminary information on key performance parameters based on modeling  Key outcomes for the July OEWG report will include:  An update of the list of all low-GWP refrigerants currently being considered  An analysis of potential performance of low-GWP refrigerants under high ambient temperature conditions XXVI/9 Task Force9

R/AC: applications  The extract contains summary information from the latest Task Force reports as well as from the TEAP and RTOC 2014 Assessment reports, including new information on high ambient temperature in a dedicated chapter  Key outcomes for the July OEWG report will include:  Options for new and existing equipment by subsector including performance characteristics and safety considerations  Specific information related to equipment performance under high ambient temperature conditions XXVI/9 Task Force10

R/AC: BAU and mitigation  The extract contains new information on BAU and mitigation scenarios, with emphasis on the impact of the length of the equipment manufacturing conversion period. The Task Force has not yet considered different assumptions for mitigation scenarios  Key outcomes for the July OEWG report will include:  Elaboration on the impact of the various refrigerants as well as the R/AC subsectors  A more precise investigation of the impact of the length of the conversion period in mitigation scenarios for the RAC sector in non Article 5 and Article 5 countries XXVI/9 Task Force11

Mitigation (refrigerants-subsectors) XXVI/9 Task Force12

Impact of conversion period (work in progress) XXVI/9 Task Force13

Impact of conversion period (work in progress) XXVI/9 Task Force14

Medical uses  The extract contains some new relevant information compared to the info provided in the XXV/5 report, in particular on medical aerosols other than MDIs, and updated information based on the 2014 assessment  The report for the July OEWG will contain new updates XXVI/9 Task Force15

Fire protection  The extract contains a summary of information taken from HTOC Technical Note #1, which was updated during the 2014 assessment process, available on the UNEP MP website  All Civil Aviation information has been moved to the report XXVI/7, which will be presented separately  The report for the July OEWG will contain any new updates that become available XXVI/9 Task Force16

Concluding remarks  Decision XXVI/9 requested a report from TEAP for consideration at the July 2015 OEWG  The extract gives a status report of the work in progress for the XXVI/9 Task Force report. This is unprecedented because it was not reviewed by TEAP and is only provided for information for this April OEWG.  Information will change as work proceeds towards the finalisation of the XXVI/9 Task Force Report  The final draft report needs to be submitted to TEAP for review and consensus  The TEAP XXVI/9 Task Force report will then be available by the beginning of June 2015 for consideration at the July 2015 OEWG  TEAP emphasises the need for close coordination of timelines for its outputs in future XXVI/9 Task Force17