HMT 1C 24-1 u Chapter 24 –Fixed Facility Incident Consideration Haz Mat Incident Considerations.

Slides:



Advertisements
Similar presentations
Emergency Preparedness and Response
Advertisements

Safety Promotion Basic Health Care; HCE100.
Flammable and Combustible Liquid & Compressed Gas Handling and Storage
Hazardous Materials.
East Carolina University Compressed Gas Safety Training Program
South Old Bridge Vol. Fire Co. Standard Operation Procedures for Hazardous Material Incidents.
Occupational Safety and Health Course for Healthcare Professionals.
Emergency Action Plans
Buildings and Structures 2 Fixed Installations Aim To provide students with information to allow them to recognise the types of fixed fire protection.
1. Glenpool South Tank Farm Glenpool, Oklahoma April 7, 2003 Storage Tank Explosion and Fire ConocoPhillips.
General Rules Compressed gases and cylinders must be properly stored, transported and used to prevent injury and accidents. Compressed gases and cylinders.
Emergencies The overall objective for this module is that participants will recognize the key elements of the emergency planning process and their associated.
9. Storage Tanks.
Petroleum Equipment Institute
Cairo University Faculty of Engineering Petrochemicals Engineering Plant Layout May 2010.
Module 4: Storage and Dispensing Locations. 2 Objective Upon the successful completion of this module, participants will be able to discuss common and.
Suzanne Reister, Program Manager Paula Vanderpool, Program Assistant North Central Washington Workers’ Comp Trust Chemical Hygiene – Hazardous Chemicals.
Lab Inspections State Fire Marshal’s Office. Applicable Codes 1999 BOCA Business Occupancy 1999 BOCA Fire Prevention Code 2000 NFPA 101, Life Safety Code.
1 Module 4: Storage and Dispensing Locations. 2 Objective Upon completion of this module, participants will be able to discuss common locations for storage.
Visual 2.1 Introduction and Unit Overview The role of CERTs in fire safety:  Put out small fires.  Prevent additional fires.  Shutoff utilities  Assist.
Fire Electrical Back Security
Safety, Health, and Environmental Committee
Hazardous Materials Response
Developing a Chemical Risk Management Program
Module 4: Storage and Dispensing Locations
PERMIT REQUIRED CONFINED SPACES PERMIT REQUIRED CONFINED SPACES.
LNG Hazards.
MSDS = Material Safety Data Sheet
Hazardous material Dr. Miada Mahmoud Rady 1. Introduction  The Department of Transportation defines hazardous materials as any substance or material.
Standard 29 CFR Part Flammable & Combustible Liquids.
Patrick Thornton, SNS/FPE June 9, 2008
Release Reporting. Lesson #17 - Release Reporting How Do I Know If I Have a Leak in My UST System?
Identify the Hazards Understanding the hazards will enable you to select best course of action. ◦ Locate pipeline marker ◦ Call Pipeline Operator’s Control.
Fire Prevention for Construction. Four classes of fires  A, B, C, and D 1a.
Safety Training Presentation
Developed by: Purdue University Agricultural Safety and Health Program Department of Agricultural and Biological Engineering West Lafayette, IN This material.
Safe Operation of Storage Tanks: Decommissioning and Repair
1 Welding Module DISCLAIMER This material was produced under grant number SH from the Occupational Safety and Health Administration, U.S.
Anhydrous Ammonia Emergency Preparedness v Information from the 2012 Emergency Response Guidebook v ID # 1005 v Guide # 125 v Name of Material Anhydrous.
02-1 Hazardous Materials Incident Considerations l Chapter 2 –Hazardous Materials Reference Sources.
3.7.3 Student Book © 2004 Propane Education & Research CouncilPage Identifying Safe Handling Practices for Flammable and Combustible Liquids Injecting.
Hazardous Materials Subpart H. Subpart H Standards Compressed Gases Acetylene Hydrogen Oxygen Nitrous Oxide Flammable.
Flammable and Combustible Liquids. Introduction !The two primary hazards associated with flammable and combustible liquids are explosion and fire !Safe.
1 © 2009 Delmar, Cengage Learning Special Concerns in Fire Fighting Chapter 6 Page 133.
Hot Work Procedures Fire Control. Cutting and Welding Where practicable all combustibles shall be relocated at least 35 feet from the work site Where.
Module 3: Planning and Response. 2 Objective Upon the successful completion of this module, participants will be able to develop strategies for preplanning.
March 2004 Material Safety Data Sheets Hazard Communications Training for Employees.
Add name of trust / organisation in box 1 and name of trainer in box 2. Delete THIS box.
HAZWOPER: Awareness Level 29 CFR (q). Headline Stories Ammonia Evacuates Industrial Site Acid Spill Sends Workers to Hospital Fuel Spill Contaminate.
Unit 2: Fire Safety and Utility Controls
Confined Spaces in Construction
Visual 2.1 Introduction and Unit Overview The role of CERTs in fire safety:  Put out small fires.  Prevent additional fires.  Shutoff utilities  Assist.
1 Confined Space Rescue Awareness Massachusetts Firefighting Academy.
Part C: Class D Fires and Tactical Considerations.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
© 2012 Delmar, Cengage Learning Chapter 11 Engineering Controls.
What you will learn in this session 1.The characteristics of fire, smoke and toxic fumes 2.Fire hazards involved in the working environment 3.Significant.
Flammable and Combustible Liquids Standard 29 CFR Part City of Council Bluffs Presented by: SilverStone Group © 2006, 2012 Zywave, Inc. All rights.
IAFF Always on the Front Line 1. Use shipping papers and facility documents to identify hazardous materials. 2. Use the NIOSH Pocket Guide as a chemical.
The Shepherd Chemical Company Lisa Thamann 11/12/2013 AMMONIUM NITRATE A New Understanding.
HAZARDOUS MATERIALS : RECOGNITION & IDENTIFICATION
IAFF Always on the Front Line 1. Identify the purpose of medical surveillance. 3. Relate incident location to type and quantity of hazardous materials.
SERVICES, LLC 1 1.
Flammable and combustible liquids
East Carolina University Compressed Gas Safety Training Program
Fire Safety and Utility Controls
Acrylonitrile.
Module 4: Storage and Dispensing Locations
Hazard Communication II
Presentation transcript:

HMT 1C 24-1 u Chapter 24 –Fixed Facility Incident Consideration Haz Mat Incident Considerations

HMT 1C 24-2 Fixed Facility Incident Consideration u Session Objectives –Identify the impact of fire and safety features on the behavior of the products during an incident –Explain the significance of fire and safety features in the risk assessment process –Identify methods for determining the pressure and amount of lading in facility containers

HMT 1C 24-3 Codes, Ordinances and Regulations u The Uniform Fire Code u Uniform Building Code u NFPA Hazard identification system

HMT 1C 24-4 Codes, Ordinances and Regulations u Health and Safety Code u Locally adopted ordinances u SARA, Title III –Emergency planning, community right to know and emergency notification

HMT 1C 24-5 Pre-Plan –Type(s) and amount(s) of materials –The hazards of each material –Potential health and environmental effects –In-house protection systems, utilities, and facility layout –Response routes, points of entry, barriers, emergency escape routes, and other access information

HMT 1C 24-6 Pre-Plan u Identify potential exposure problems u Identify potential avenues of spread u Determine local capabilities and resources

HMT 1C 24-7 The Pre-Planning Process u Identify target hazards u Compile information on target hazards

HMT 1C 24-8 Sources of information include: u Building permits u Inspection reports u Hazardous materials permits u Past incident reports u Hazardous Materials Management Plan

HMT 1C 24-9 Hazardous Materials Management Plans (HMMPs) u Developed and maintained by personnel at the fixed facility u Must be given to the agency having emergency response authority u Required

HMT 1C HMMP Must Contain: –General Information –Facility Storage Map –Hazardous Materials Inventory Statement –Separation of materials –Monitoring Program –Record Keeping Forms –Emergency Equipment –Emergency Response Plans

HMT 1C Pre-Plans u A pre-plan usually consists of two parts: –Quick access information –Plot plan u Pre-plans should be set up in a standard format for all fixed facilities –exercise the plan

HMT 1C Fixed Facility Systems u Containers and tanks u Piping, valves and fittings u Signage u Security u Ignition sources u Shelf storage u Spill control, drainage and containment u Ventilation

HMT 1C Fixed Facility Systems u Separation from incompatible hazardous materials u Hazardous materials storage cabinets u Fire extinguishing systems u Explosion venting or suppression u Standby power u Limit controls u Manual alarm

HMT 1C Fixed Facility Systems u Supervision u Emergency vehicle access u Toxic gas storage u Gas detection u Local gas shut off u Automatic shut off u Enunciator panel

HMT 1C Fixed Facility Containers

HMT 1C Fixed Facility Containers u Non-bulk containers u Intermediate bulk containers u Fixed storage tanks –Underground tanks –Above ground tanks

HMT 1C Hazardous Materials Storage Tank Regulations u Uniform Building Code (UBC) u Uniform Fire Code (UFC) u Occupational Safety and Health Administration (OSHA) u Locally adopted Hazardous Materials Storage Ordinances (HMSO)

HMT 1C Vertical Atmospheric Fixed Roof Tanks

HMT 1C Vertical Atmospheric Fixed Roof Tanks u Wider then they are tall u Fat roof or an inverted cone shaped roof u May be designed with weak roof-to-shell attachments u Usually contain flammable, combustible and corrosive liquids

HMT 1C Floating-Roof Tanks u Very large tanks u Roofs float on liquid inside –limits the vapor space u Designed for flammable and combustible liquids that readily vaporize

HMT 1C Covered Floating-Roof Tanks u Fixed roof with a inner floating roof u Can be identified by large vent openings around the top of the tank u Designed to contain flammable and combustible liquids

HMT 1C Vertical Low Pressure Fixed- Roof Tanks u Taller than they are wide u Dome top –designed to accommodates changes in vapor pressure u Operate at pressures up to 15 psig u Used for flammable and combustible liquids and other types of haz mats

HMT 1C Horizontal Above Ground Low Pressure Storage Tanks u Above ground tanks that lay horizontally u Potential problems include: –possible failure of supports during a fire –possible inadequate venting u Generally contain gasoline, naphtha or fuel oil

HMT 1C Pressure Horizontal Tank u Cylindrical with rounded ends u Usually mounted horizontally on concrete foundation walls or legs u Generally painted white or another highly reflective color u Contain liquefied gases u May have built-in protection systems

HMT 1C Spherical Tanks u Ball-like shape u Contain high pressure gases u Painted white or other reflective color u Pressure relief valve at the top –No pressure relief valve may indicate cryogenic liquids

HMT 1C Cryogenic Liquid Tanks u Taller than they are wide, and have domed tops u Rest on legs rather than directly on the ground u Store cryogenic liquids

HMT 1C Underground Storage Tanks u Underground storage tanks are at least partially below ground u Advantages - protected from fire and mechanical damage u Disadvantage - cannot be visually inspected for leaks u Subject to corrosion u Contain LPG, gasoline or fuel oil

HMT 1C Bulk Storage Facilities u Safety features that can be found at Bulk Storage Facilities: –Tank Spacing –Drainage Control and Diking –Venting Systems –Monitoring and Detection Systems –Fire Protection Systems –Transfer Options

HMT 1C Fixed Facility Haz Mat Incident Management u Review pre-plans while en route u Determine the best approach route and notify other responding units u Establish Command u Conduct safe size-up u Contact site personnel for information

HMT 1C Fixed Facility Haz Mat Incident Management u Determine if a rescue is involved u Isolate the area u Request assistance as needed u Establish control zones u Have responsible party respond u Identify hazards present at the site

HMT 1C Fixed Facility Haz Mat Incident Management u Alert hospitals if necessary u Consider protective actions u Establish the level of PPE u Contain the material using appropriate measures u Decontaminate personnel, victims and equipment u Owner is responsible for clean up

HMT 1C Incidents With Fire Involvement: u Extinguish vs. let it burn u Steam may volatize and spread contaminants u Use foam, dry chemical or carbon dioxide as appropriate u Oxidizers are difficult extinguish