ACTION PLANNING FOR POST- QUALITY ASSURANCE REVIEWS*

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Facilitated by Joanne Fraser RiverSystems
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Project Management.
Results-Based Management: Logical Framework Approach
Degree and Graduation Seminar Scope Management
Supporting people with a learning disability Introduction to Project Management Presenter: Steve Raw FInstLM, FCMI.
SEM Planning Model.
Project management methodology Project Cycle Management A short training course in project cycle management for subdivisions of MFAR in Sri Lanka.
INSTITUTO DE ESTUDIOS POLÍTICOS PARA ÁMERICA LATINA Y ÁFRICA LOGICAL FRAMEWORK APPROACH HUMANA.
What is a project? Project Management Institute definition
Logic Modeling for Success Dr Kathryn Wehrmann Illinois State University.
Introduction to Project Management. What is a Project? “A planned undertaking of related activities to reach an objective that has a beginning and an.
HOW TO WRITE A GOOD TERMS OF REFERENCE FOR FOR EVALUATION Programme Management Interest Group 19 October 2010 Pinky Mashigo.
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
1 Module BASICS OF PLANNING. 2 Content Overview Planning principles Gantt charts.
@ Industrial Engineering by Bopaya Bidanda David I. Cleland.
Project Management Lecture 5+6 MS Saba Sahar.
CASE STUDIES IN PROJECT MANAGEMENT
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Monitoring Evaluation Impact Assessment Objectives Be able to n explain basic monitoring and evaluation theory in relation to accountability n Identify.
Systems Analysis and Design in a Changing World, 6th Edition
United Nations Statistics Division
May 12 th Monitoring and Project Control. Objectives Anticipated Outcomes Express why Monitoring and Controlling are Important. Differentiate between.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
Do it pro bono. Strategic Scorecard Service Grant The Strategy Management Practice is presented by Wells Fargo. The design of the Strategic Scorecard Service.
Project Management Skills & Tools Michelle Sced Research Development Coordinator Division Research Skills Day – 9 March 2007.
RESULTS BASED MANAGEMENT IN TANZANIA. STAGE 1 Service Delivery Survey - MDAs have to undertake these surveys which focus on external customers and are.
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
IPA Funds Programme Management sept Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına.
Project design & Planning The Logical Framework Approach An Over View Icelandic International Development Agency (ICEIDA) Iceland United Nations University.
KEYWORDS REFRESHMENT. Activities: in the context of the Logframe Matrix, these are the actions (tasks) that have to be taken to produce results Analysis.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
National Commission for Academic Accreditation & Assessment Developmental Reviews at King Saud University and King Faisal University.
Chapter 11. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Geog 469 GIS Workshop Project Management.
Project Life Cycle.
On-line briefing for Program Directors and Staff 1.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
Aligning Institutional Strategic and SEM Plans: Indiana State University November 12, 2012 Tom Green, Ph.D. Senior Consultant.
GLOBAL SCHOOL OF PROJECT MANAGEMENT UNIVERSITY FOR INTERNATIONAL COOPERATION Ing. Osvaldo A. Martínez Gómez, MAP, MSc. Essential Topics - Project Management.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
Scheduling and risk Icelandic International Development Agency (ICEIDA) Iceland United Nations University Fisheries Training Programme (UNU-FTP) Iceland.
Module V: Writing Your Sustainability Plan Cheri Hayes Consultant to Nebraska Lifespan Respite Statewide Sustainability Workshop June 23-24, 2015 © 2011.
Preparing proposals for funding RIMC Research Capacity Enhancement Workshops Series : “Achieving Research Impact”
IFAD Reform towards a better development effectiveness How can we all do better? Mohamed Tounessi Bamba Zoumana Virginia Cameroon Retreat 4-5 November.
Project Management Workshop James Small. Goals Understand the nature of projects Understand why Project Management is important Get an idea of the key.
July 2007 National Quality Assurance and Accreditation Committee & Quality Assurance and Accreditation Project Role of Action Planning in The Developmental.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
TANZANIA FELLOWSHIP OF EVANGELICAL STUDENTS (TAFES)
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
Managing programs that promote personal effectiveness.
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
Planning and Organizing Chapter 13. The Planning Function Planning for a business should stem from the company’s Business Plan – The business plan sets.
Presentation to the Ad-hoc Joint Sub-Committee on Parliamentary Oversight and Accountability Wednesday 20 March 2002 PUBLIC SERVICE MONITORING AND EVALUATION.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
PROPOSED STRATEGIC PLANNING PROCESS DECEMBER 3, 2014 Port of Port Angeles.
WORKSHOP ON PROJECT CYCLE MANAGEMENT (PCM) Bruxelles 22 – 24 May 2013 Workshop supported by TAIEX.
1. WELCOME Project Management Cycle (P.M.C.) What is a project? : What is project management?: Project management life cycle : Phase 1 st : Phase 2 nd.
PRESENTATION OF FINDINGS GRANTEES NEED ASSESSMENT
Taught Postgraduate Program Review
Implementation Plan I want to plan a project
Chapter 3 Managing the Information Systems Project
Time Scheduling and Project management
KEC Dhapakhel Lalitpur
How is an M & E framework derived from the logframe?
Presentation transcript:

ACTION PLANNING FOR POST- QUALITY ASSURANCE REVIEWS* Professor Andrew S Downes Pro Vice Chancellor University Office of Planning and Development University of the West Indies *Quality Assurance Unit Workshop on Action Planning for Implementation, March 6, 2015

OUTLINE OF PRESENTATION Quality Issues in Strategic Planning Action Planning Framework Project Management Tools for Action Planning Some Considerations for Departments

QUALITY ISSUES IN STRATEGIC PLANNING Strategic Planning sets out the long term direction for the organization in a coordinated and systematic manner—mission, vision, goals/objectives and broad strategies and initiatives UWI’s Strategic Plan 2012-2017 contains several references to the quality dimension of strategic planning:

QUALITY ISSUES IN STRATEGIC PLANNING The delivery of accredited quality programmes at reasonable cost (basis of competitive advantage) The provision of high quality customer (staff and students) service (IOP perspective) Improvement in the quality of the working conditions of staff (EED perspective) Recruitment and Retention of high quality staff and students (Outreach perspective) Improvement and harmonization of quality assurance practices and processes across the campuses (T&L perspective)

QUALITY ISSUES IN STRATEGIC PLANNING Quality Assurance Review Process involves: Internal Evaluation including the preparation of a Self Assessment Report by department/discipline members External Evaluation by an external review team Action Plan to respond to the agreed recommendations of the review process The key objective of the exercise is to enhance the academic and administrative quality of the department/discipline’s operations

ACTION PLANNING FRAMEWORK Action Planning is a key element of the overall planning process in an organization especially during the implementation or execution phase. McChesney-Covey’s Four Disciplines of Execution: Focus on the wildly important goals/objectives Act on ‘lead’ indicators which measure the key activities that must be undertaken to achieve goals/objectives Keep a compelling scorecard to monitor progress and communicate to stakeholders Create a cadence of accountability

ACTION PLANNING FRAMEWORK In the context of the QARs, action planning refers to the process whereby a department translates the agreed recommendations into executable, measurable and accountable actions to achieve the goal of enhancing the quality dimension of its operation. Action planning is also part of the institutional effectiveness process and proposed Quality Management System.

ACTION PLANNING FRAMEWORK For each recommendation, the action planning process requires the specification of Key objectives of actions ( what); Output(s) ( what for); Strategies/activities (how) Responsibilities (who) Timelines (when) The Template for an Action Plan is given as:

Recommendation/Action to be taken Objective(S) Initiative(s) Success Indicator(s) Resources Required (budget) Start Date Completion date Party(ies) Responsible Collaborators Risk Factors

ACTION PLANNING FRAMEWORK Over the planning period, progress with the activities/initiatives will be monitored and evaluated— measurement and data collection will be critical The Reporting Template for the Action Plan would cover: Action Initiative Progress to date Reason for Variance

PROJECT MANAGEMENT TOOLS FOR ACTION PLANNING Action Planning involves the design and management of projects (i.e. a series of tasks directed towards a specific outcome/goal) Action planning therefore involves the use of three (3) key project management tools: Logical Framework (LF) Work Breakdown Structure (WBS) Gantt Chart (GC)

PROJECT MANAGEMENT TOOLS FOR ACTION PLANNING The Logical Framework (Logframe): A methodology/tool for planning, managing and evaluating programmes, projects and operations and involves the following: Problem analysis Analysis of objectives Analysis of strategies Design of activity and resource schedules Stakeholder analysis Preparation of the Logframe

LOGICAL FRAMEWORK MATRIX

Project Structure Indicators of Achievement Means of Verification Important Assumptions and Risks GOAL: What are the wider objectives which the activity will help achieve? (Longer term impact) What are the measures/indicators/judgement to determine goal achievement? What sources of information exist or can be provided to allow the goal to be measured? What external factors are necessary to sustain the objectives in the long run? PURPOSE: What are the intended immediate effects of project? What changes will activity bring? What are the benefits, to whom? What are the measures/indicators to judge achievement of purpose? What sources of information exist or can be provided to allow the achievement of purpose to be measured? What external factors are necessary if the purpose is to contribute to achievement of the goal? OUTPUTS: What deliverables are to be produce to achieve the purpose What kind and quality of outputs and by when will they be produced? ( Quantity/Quality/Time) What are the sources of information to verify the achievement of the outputs? What are the factors not in control of the project which are liable to restrict the outputs achieving the purpose? ACTIVITIES: What must be achieved to get the outputs What kind and quality of activities and by when will they be produced? What are the sources of information to verify the achievement of the activities? What factors will restrict the activities from creating the outputs?

PROJECT MANAGEMENT TOOLS FOR ACTION PLANNING Work Breakdown Structure(WBS) Simply subdivides a complicated task into smaller tasks until a level is reached where further subdivision is not feasible. It assist with the estimation of time, costs and resources associated with the project/tasks WBS does not show the sequence in which work is performed hence a scheduling tool is needed.

PROJECT MANAGEMENT TOOLS FOR ACTION PLANNING Gantt Chart: Show the amount of work done or task completed in certain periods of time in relation to the amount planned for those periods A graphical method of presenting information on work completed within a scheduling arrangement Drawback of Gantt chart—determining the impact of a slip of one task on the other tasks of a project can be difficult. Other scheduling tools have been developed: Critical Path Method (CPM) Performance Evaluation and Review Technique(PERT)

SOME CONSIDERATIONS FOR DEPARTMENTS Carefully review the recommendations of the QA of discipline/department Identify reasonable/doable key recommendations in light of the strategic/operational plans---use retreat, brainstorming etc List the benefits of the undertaking the agreed recommendations—VC’s Award for Excellence!! Develop an Action Plan using the PM tools—measurement, data collection, accountability Review progress with the Action Plan.