Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.
Advertisements

1.040/1.401 Project Management Spring 2007 Lecture 9 Deterministic Planning Part II Dr. SangHyun Lee Department of Civil and Environmental.
Precedence Diagramming
WBS: Lowest level OBS: Lowest level
ES=32 EF=34 LS=33 LF=35 ES=10 EF=16 LS=10 LF=16 ES=4+6=10 EF=10 LS=4
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Network Diagramming Network Analysis  The common term for network analysis is PERT  PERT stands for Program Evaluation and Review Technique  The word.
CSSE Sep.2008 Constructing and Analyzing the Project Network Diagram Chapter 6.
1 Project Planning BA Project Planning and Control Definition of Project Management Work Breakdown Structure Critical Path Scheduling Ideal Completion.
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
1 University of Wales Bachelor of Science (Industrial Engineering and Management) Year 3 Copyright © 2012 MDIS. All rights reserved.Section
PREPARED BY : NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH PROJECT NETWORK DIAGRAM.
5/4/20151 NETWORK SCHEDULING TECHNIQUES. 5/4/20152 Network Diagrams  PMI defines the scheduling process as: “the identification of the project objectives.
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Network planning Learning objectives After these lectures you should be able to: - Produce and analyse activities networks - Calculate earliest and latest.
Precedence Network Calculations the basic information that should be calculated in the precedence network are: 1) Early activity start (ES) 2) Early activity.
Project Time Management
Project Management Chapter 3 BUSI 2106 – Operations Management.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
The Critical Path – Precedence diagram method Luise Lorenz Christina Mohr.
Time Planning and Con trol Precedence Diagram.  Precedence Diagramming  An important extension to the original activity-on-node concept appeared around.
Software Project Management Task Sequencing Activity Sequencing Concepts PERT charts Critical Path Analysis.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
TIME MANAGEMENT Definition: Time management is a set of principles, practices, skills, tools, and systems that work together to help you get more value.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
ENGM91 ACTIVITY PLANNING Unit 2
© Construction Management Association of America. Do Not Duplicate or Reproduce. Standards of Practice Course CPM Scheduling Lab.
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
Rights Reserved 1 CPM-200: Principles of Schedule Management 15 th Annual International Integrated Program Management Conference November 16-19, Tyson’s.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
PMP, CAPM, PgMP, PMI-SP, PMI-RMP, OPM3 and PMBOK are registered marks of Project Management Institute, Inc Inov8Solutions Inc – Quality Educational Services.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Project Management May 5, 2008 Eric Verzuh Project Management May 5, 2008 Eric Verzuh.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
PROJECT MANAGEMENT Definitions WBS = Work Breakdown Structure
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
Irwin/McGraw-Hill  The McGraw-Hill Companies, Inc Project Scheduling IENG 321 IENG 321.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Dr. Hany Abd Elshakour 2/18/ :27 PM 1. Dr. Hany Abd Elshakour 2/18/ :27 PM 2 Time Planning and Control Activity on Arrow (Arrow Diagramming.
Project Management – Part 1. Overview What is a project? Project management techniques Activity lists Network diagrams Critical path analysis Gant charts.
PROJECT MANAGEMENT ENCE-7323 TO 763-N CLASS 3 September 17, 2001 Carl E. Edlund
Project Management Fundamentals - Planning Tools 1.
Project Management MGT 30725
Project Management: PERT/CPM
Project Planning & Scheduling
Project Planning & Scheduling
Project scheduling Precedence diagram method & Resource scheduling
Project Management Critical Path Method Demonstration
Project Scheduling Chapter 14.
Chapter 6: Project Time Management
Introduction to Project Planning & Scheduling Software Microsoft Project Prepared by; Emedya Murniwaty Samsudin emedya murniwaty samsudin_msp2013 sem 2.
Project Management CPM Method Tutorial-p2
Project Planning and Budgeting
Time Planning and Control Precedence Diagram
Project Scheduling Basics Activity on Node Precedence Diagrams
Project Management CPM Method Tutorial-p1
Project Time Management
BEST VIEWED IN SLIDE SHOW MODE
Project Time Management
Lecture 5: Project Time Planning (Precedence Diagramming Technique)
In-Class Scheduling Exercise
LECTURE 3.
Project Time Management
Project Time Management
Exercise – A small building.
Project Time Management
Time Planning and Control Precedence Diagram
Presentation transcript:

Time Management Ahmed Awad, Ph.D., PMP

Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition. b Activity Sequencing. b Activity Duration Estimating. b Schedule Development. b Schedule Control.

Time Management Techniques b Bar Chart. b Line of Balance. b Time Location Diagram. b Network Analysis (CPM).

Time Management Activity List b Scope of Work, Specs, and Drawings. b CSI Format. b Work Breakdown Structure (WBS). b Activity List. b CSI, WBS, Activity ID, Cost Accounts, & Activity Codes.

Time Management b Activity Duration Estimating b Quantity Take Off. b Resources (Labor, Material, Equipment & Subcontractors). b Productivity Rates. b Duration.

Network Analysis (Critical Path Method) (Schedule Development)

Network Analysis (Critical Path Method)

b Early Finish (E.F.)= Early Start (E.S.) + Duration (Forward) b Late Start (L..S.)= Late Finish (L.F) - Duration (Backward) b Total Float= L.S. – E.S. = L.F. – E.F. b If total float (T.F.) = 0 (Critical Activity)

Methods of Presentations b Arrow Diagram b Precedence Diagram

Precedence Diagram E.S.ID.E.F. Activity Description L.S.T.F.L.F.

Relationships Types b FS = Finish - Start b SS = Start - Start b FF = Finish - Finish b SF = Start - Finish

Schedule Control b Target Schedule (Time Base Line, Original T. S., Rev. 0………….) b Current Schedule (Actual Schedule, Updated Schedule, Rev.1, 2…..) b Comparison (Target vs. Current) b Reasons. b Corrective Action. b Change Orders.