PALM-3000 PALM3000 Realignment Winter 2007-2008 Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss, R. Dekany, M. Troy Layout.

Slides:



Advertisements
Similar presentations
University College London, Optical Science Laboratory bHROS Progress bench-mounted High Resolution Optical Spectrograph bHROS bHROS Progress General.
Advertisements

January 6. January 7 January 8 January 9 January 10.
TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
X. X September Mo Tu We Th Fr Sa Su
PALM-3000 Status of the PALM-3000 high-order adaptive optics system A.H. Bouchez, R.G. Dekany, J.R. Angione, C. Baranec, K. Bui, R.S. Burruss, J.R. Crepp,
PALM-3000 HOWFS - 2/20/09 C. Baranec. PALM-3000 HOWFS Current optical testing Review of Feb 8 th HOWFS update Detailed future tasks 2.
System-wide issues Before we get to the telescope System integration and verification at the telescope Operations Maintenance and support.
PALM-3000 P3K Team Meeting #9 Stephen Guiwits Team Meeting #9 and 023 Robinson October 22, 2008.
PALM-3000 Management Update A. Bouchez, J. Roberts Team Meeting #15 10/29/09.
PALM-3000 PALM-3000 Management Update Antonin Bouchez, Jenny Roberts Team Meeting #7 27 February, 2008.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
PALM PALM-3000 project status 31 Jan COO All-Hands Mtg. Recent Milestones Requirements review on 12 Nov AO system offline for maintenance.
PALM-3000 P3K Team Meeting #16 Stephen Guiwits Dean Palmer, Ernest Croner, Antonin Bouchez Team Meeting # Cahill March 05, 2010.
PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
PALM-3000 P3K Integration and Test Review Stephen Guiwits P3K System Computers and Electronics 273 Cahill September 22, 2010.
PALM-3000 Integration and Testing Status A. Bouchez Team Meeting #15 10/29/2009.
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
PALM-3000 PALM-3000 Status A.H. Bouchez, J.E. Roberts Project 1640 Las Vegas Summit 1/28/2010.
PALM-3000 P3K Stimulus Design Update Rick Burruss P3K Team Meeting #7 February 27, 2008.
LGS Project Meeting February 1, 2006 Agenda 1.IPT status updates: Laser facility, AO optomechanics, AO software (Bouchez, Roberts, Trinh; 30 min) 2.Sum-Frequency.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
2-Tier Layout (RK 11/20/07). 1-Tier Layout (RK 11/26/07)
PALM-3000 Optical Bench Update Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss Team Meeting #15 10/29/2009.
PALM-3000 Team Meeting #15 – Wavefront Sensor(s) C. Baranec October 29 th 2009.
PALM Project Jan COO All-Hands Mtg. Project 1640 is an infrared, coronographic integral-field spectrograph for high-contrast companion.
LGS Project Meeting November 9, Outline 1.Project infrastructure 2.PALM-3000 update 3.LGS subsystem updates –Optical bench –LGS facility –AO software.
PALM-3000 Instrument commissioning schedule Antonin Bouchez Team Meeting #7 27 February, 2008.
PALM-3000 Budget and Schedule Update A. Bouchez, J. Roberts Team Meeting #10 1/8/2009.
5 th February 2010 FP7 Prep WP9000 Progress Meeting 1 Update Tim Morris Durham University FP7 Prep WP 9340.
Compressor status AWAKE Technical Board meeting 19 May 2015.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
“Milliarcsecond imaging in the UV- Optical domains: Preparing the way to space borne Fresnel Imagers”, Nice, Sept INSTALLING A FRESNEL IMAGER.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
MCAO Adaptive Optics Module Mechanical Design Eric James.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
Compressor status AWAKE Technical Board meeting 19 August 2015.
September 2008 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Laser Notcher Demonstration Experiment Dave Johnson, Todd Johnson, Matt Gardner. Rick Tesarek, Vic Sacrpine.
Current Status of Pepperpot Emittance Measurement System Simon Jolly Imperial College FETS Meeting, 22/02/06.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
DBSP-R Upgrade Progress Review The DBSP-R Team DBSP-R Progress Review.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
1 MICE Hydrogen system Working group mtg – 01/09/14.
New Support Structure 4x4 Beams Existing Stairs per Mr Walter Kellner Cherenkov 32 deg shifted back 4.0 inches to clear existing structure Cherenkov 40.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
CBETA Technical Review
nSW Alignment Installation
Brainstorming on how to best proceed with LESS
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
X-ray Pump-Probe Instrument
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
SNS PPU Cryomodule Vacuum Vessel
2015 January February March April May June July August September
Presentation transcript:

PALM-3000 PALM3000 Realignment Winter Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss, R. Dekany, M. Troy Layout Design: A. Moore

PALM-3000 Background The purpose of the work on the AO bench this winter is to accommodate the SWIFT and P1640 science instruments. This requires: 1.Moving the OAPs, FM2, TTM and DM to new positions for SWIFT focus 2.Making additions to the stimulus capability 3.Re-coating all the mirrors 4.Modifying the enclosure

PALM-3000 Focus Change Changing the location of science focus requires moving PHARO to a new location In order to have room for the SWIFT mounting pads, PHARO will be shifted forward in its support structure The FM3 location will be modified so that only PHARO’s position along the beam will change

PALM-3000 Space Requirements Because the new science instruments will use the entire width of the bench, the following are required in order to make space for the instruments: 1.Removable PHARO FM3 mount Already in the machine shop 2.Removal of part of the current enclosure This requires a removable FM3 enclosure for PHARO

PALM-3000 Other requirements SWIFT has no X-Y adjustment with respect the to beam, so the stimulus must be remotely adjustable in X-Y. In order to complete this work before SWIFT arrives, it will be done in off the bench in parallel with the relay realignment. This means that we will need an interim simulated-telescope-light source to use for the relay alignment while the stimulus package is being modified.

PALM-3000 Schedule Highlights November Stimulus –Review stimulus requirements - DONE –Design stimulus SSMs –Design and procure SSMs Mechanical –Design and build FM3 mount - DONE Optical Bench –Document optic and mount locations, test WFS installation - DONE –Relayout plan review December Stimulus –Stimulus PDR –Procure stimulus components Mechanical –Design PHARO mount modifications –Manufacture PHARO mount parts –Design FM3 enclosure

PALM-3000 Schedule Highlights December cont. Optical Bench –Remove stimulus plate and install temporary stimulus –Replace DM with flat –Unmount PHARO –Remove optics, inspect, mark, pack and ship January Stimulus –Install sources Mechanical –Modify and test PHARO mount –Modify interim main enclosure –Build FM3 enclosure –Design, machine and test fit SWIFT cart standoffs Optical Bench –Install SWIFT mounting pads –Install FM3 mount –Reposition WFS, OAP mounts, FSM, FM2, DM-flat (FARO) –Reinstall OAPs –Realign relay optics

PALM-3000 Schedule Highlights February Stimulus –Integrate and test stimulus with lab system SSMs –Integrate and test SSMs with lab system Mechanical –Test-fit FM3 enclosure and SWIFT cart standoffs Optical –Continue to realign relay optics –Install and align new SSMs –Remount PHARO –Reinstall DM March Optical Bench –Install Enclosures –Reinstall stimulus plate Commissioning –Verify PALM-241 / PHARO laboratory performance April Commissioning –Verify PALM-241 / PHARO on-sky performance (April 9 th )

PALM-3000 Full schedule

PALM-3000 Full schedule (cont)

PALM-3000 New Layout