Received bricks: 94 (17 + 77) (5 black CS) Extracted by mistake 1 ( 1 + 0) 93 ( 16 + 77) Located in ECC: 72 ( 11 + 61) (2 black CS) Located in dead material.

Slides:



Advertisements
Similar presentations
Regina Rescigno, Giustino DAmato, Cristiano Bozza – Salerno Emulsion Group – Jan 2009 Scanning Report from Salerno Brick scanning overview Event gallery.
Advertisements

1 Status report of the PEANUT analysis Giovanni De Lellis Collaboration Meeting, June 5th 2007, Maiori.
Π 0 search N.Kitagawa Flab Nagoya University OPERA Emulsion Workshop 2008/01/22-23.
SUTS data taking and processing K.Morishima. Introduction to Morishima ・ Refresh ・ Development of Plate Changer ・ Development of Dry lens scanning ・ Development.
Slides for the discussion Cosmic ray density. Cosmic ray density. Cosmic ray is  useful for the alignment between plates. Decay search Momentum measurement.
Emulsion scanning: present status and plans for the coming run Giovanni De Lellis.
Vertex location status of Japan Nagoya vertex hunting team Y.Nonoyama, K.Hamada, S.Takahashi, H.Kubota, R.Komatani 2009 Jan 22 OPERA Japan Meeting.
Support to the event location in CS Scanning Station Fabio Pupilli LNGS Scanning Team OPERA Collaboration Meeting 20/01/2009 MIZUNAMI.
WG-3 summary CS scanning. People O.SatoNagoya Y.NonoyamaNagoya S.MiyamotoNagoya J.YoshidaNagoya T.FukudaNagoya T.NakanoNagoya S.AokiKobe Luigi Salvatore.
OPERA experiment T.Toshito (Nagoya univ. Japan) for the OPERA collaboration Apr
Volume Scan 福田 努 (Tsutomu Fukuda) Nagoya-univ.. Event Brick#CC/NC Stop Plate CC PL CC PL NC PL
OPERA brick (16215) scanning results Luisa Arrabito on behalf of Lyon Scanning Group Emulsion Workshop Nagoya 22th-23th January 2008.
Automatic Track Follow Program A program to trace a given set of tracks automatically –Event location for PEANUT and OPERA –DONUT “not-located” events.
CSd analysis Natalia for the European CS Scanning Team.
OPERA 2008 run: a report from the Swiss scanning lab Ciro Pistillo LHEP Bern university for the Swiss scanning team OPERA Collaboration meeting Ankara,
CS LNGS Current status and perspectives.
Regina Rescigno, Cristiano Bozza – Salerno Emulsion Group – Apr Scanning Report from Salerno Brick scanning overview Pending Events An Interesting.
I. Kreslo, LHEP, Bern Bern Scanning Laboratory Hunting muonless interactions...
Summary of the event location in Europe Giovanni De Lellis.
Emulsion scanning in Napoli Status of net-scan data taking Overview and perspectives Giovanni De Lellis.
E-pair Search in CSD Tsutomu Fukuda Nagoya-univ..
Film Storage and book-keeping Scanning Quality Control Cosmic Ray Density Vertex Confirmation Vertex Location WG4 summary.
NC like event location 9 th /Dec/2006 OPERA Emulsion Work Shop T. Fukuda, K. Morishima, N. Nagoya univ.
Support to the event location in CS Scanning Station Fabio Pupilli LNGS Scanning Team OPERA Collaboration Meeting 02/04/2009 ANKARA.
CS LNGS Current status and perspectives Luigi Esposito (European CS Scanning Team)
CS to TT connection – event display A. Chukanov, Yu. Gornushkin, S. Dmitrievsky 22 nd January, 2008 OPERA Emulsion Workshop, Nagoya, Japan.
Neutrino Event location Connection from Electric Detector to Emulsion Detector Tsutomu FUKUDA Fundamental Particle Physics Lab, Nagoya-univ 9th March,
Rome scanning report After training ( Brick # , ev. # from Salerno: relocated ), 4 bricks assigned - 3 in this report [1 more assigned.
CS general status on behalf of JAPAN CS Analysis task force team T.Fukuda, S.Miyamoto, Y.Sakatani, Y.Taira 2nd April, OPERA Collaboration
Umut Kose Neutrino interaction location in the OPERA Experiment New Development of Flavor Physics, , Tennomaru, Gamagori Nagoya University.
1 Status of Located Event Analysis On behalf of Nagoya Scanning Group Umut KOSE OPERA Emulsion Workshop, January 2008, Nagoya, JAPAN.
The OPERA Experiment 12 th Topical Seminar on Innovative Particle and Radiation Detectors (IPRD10) 7-10 June 2010, Siena, Italy Jonas Knüsel Albert Einstein.
Tomokazu Matsuo TOHO University.M2 Experience: CS Production in Gran Sasso CS Scan, Manual check ECC Vertex analysis Main works: Make plate changer #2.
Scanning status in Salerno Chiara Sirignano Chorus Collaboration Meeting Ishigaki, 7-8 April 2003.
Research History of Tsutomu FUKUDA Tono-Refresh facility Facility construction Mass production shift leader Refreshing control Sensitivity.
CSd scanning report from LNGS Nagoya OPERA workshop January 22 nd, 2008.
CS Brick connection at Nagoya O.Sato
Status of the OPERA experiment Yoshiaki Nonoyama Nagoya Univ.
EM shower reconstruction and located neutrino event analysis Ciro Pistillo (Bern LHEP) on behalf of the Swiss OPERA groups.
DONUT Reinhard Schwienhorst DOE review 7/28/1999.
BOLOGNA Scanning Lab INFN - Sezione di BOLOGNA Physics Dep. of Alma Mater Studiorum Università di Bologna M.Pozzato – Ankara – 09/04/02.
Status and results from the OPERA experiment Tsutomu FUKUDA ( Nagoya University ) On behalf of the OPERA Collaboration NNN10, 14 Dec 2010, Toyama International.
LNGS Scanning Station Nicola D’Ambrosio (LNGS group) Maiori, 4-6 June 2007.
1 RUN 2008 OPERA events: Status Report M. Ieva on behalf of Bari Emulsion Lab OPERA Collaboration Meeting, April 1st - 5th, 2009.
Status of the OPERA experiment Akitaka Ariga LHEP, University of Bern on behalf of the OPERA collaboration  CC event with charm production Candidate (Data)
Tsutomu Fukuda Nagoya University, JAPAN
Status and results from OPERA Tomoko Ariga LHEP, University of Bern on behalf of OPERA Swiss groups of Bern and ETHZ.
Bologna Report M. Pozzato on behalf of Bologna Group Cetara Meeting – 13/09/2010.
DE/dX measurement by OPERA film Tsutomu Fukuda (Nagoya Univ) Emulsion work shop (11/12,2005)
OPERA Emulsion Workshop – Nagoya, 7-9 Dec From CS to Brick: first results from low density cosmic ray exposure at LNGS M. De Serio from Bari emulsion.
LNGS Scanning Station Status Nicola D’Ambrosio (LNGS Group) Ankara, 2 April 2009.
Event location and decay search in Switzerland Swiss group.
European Scanning System: status report. DRY Fill factor 92.4 ± 1.6 % DB-driven Scan-back and Total Scan in Bari OIL Fill factor 93.1 ± 1.2 % Brick #8,
NUCLEAR FRAGMENT SEARCH IN HADRON INTERACTIONS JIRO KAWADA(LHEP, BERN) ANIS BEN DHAHBI (F.S.T *, LHEP) JONAS KNUESEL (LHEP) * Faculty Science of Tunis.
Swiss Scanning lab report A. Ariga for Swiss group.
3:00. 2:59 2:58 2:57 2:56 2:55 2:54 2:53 2:52.
CCbar analysis M. Guler, METU, Ankara. 0mu/1mu selection I: If (a vertex with one TT-matched track & Parent track (at least 0ne- segment) & at least two-segment.
G.Sirri – INFN Bologna LNGS /19 Status Report of the Bologna Scanning Lab Bologna Scanning Lab Last activities in the Bologna scanning lab.
Status and results from the OPERA experiment Tomoko Ariga on behalf of the OPERA collaboration A. Einstein Center for Fundamental Physics LHEP, University.
Status of the OPERA experiment
OPERA Stato dell’esperimento Run 2007
Results from OPERA Pablo del Amo Sánchez for the OPERA collaboration
Top Fire Protection Services Ottawa available on Dubinskyconstruction
Tips Need to Consider When Organizing a College Event
ماجستير إدارة المعارض من بريطانيا
Working Near Services.
Bari emulsion lab: status report
Location summary.

Italian Lab Meeting-CETARA September 2010
Presentation transcript:

Received bricks: 94 ( ) (5 black CS) Extracted by mistake 1 ( 1 + 0) 93 ( ) Located in ECC: 72 ( ) (2 black CS) Located in dead material 2 ( 1 + 1) Passing through 6 ( 1 + 5) 80 ( ) (80 / 91 = 88%) Connected 82 ( ) (82 / 86 = 95%) Under study 11 ( 3 + 8) (3 black CS) Waiting 2 ( 0 + 2) Status of event location in the Swiss scanning station

List of passing through CC: 25308, *, , 6482, NC: has no brick upstream

Open questions: CC black CS, under study CC black CS, under study CC black CS, under study CC scanning now CC not connected (mu+2) two trials (Lyon event) CC connected (0+2) only one BT found only in 57, under study CC connected (0+3) 2/3 in 57 and 56, no mu and no VTX found (¾ done) NC not connected (2), two trials ¾ req. under study CC scanning now NC connected (2) 2 tracks found (e pair) searching for VTX ups. under study NC connected (1) isolated stop but e pair. No VTX upstream found CC not connected (mu), two trials CC not connected (mu+2), near the edge, prob. with marks, under study