Sector 13 Canted Undulator Upgrade Hutch Modification Requirements.

Slides:



Advertisements
Similar presentations
Exterior Window and Door Frames
Advertisements

Chapter 29 Electrical Plans. Chapter 29 Electrical Plans.
P4 Shutter Review May, 2005 P4 – ID Movable Beam Stop and Integral Shutters Presented by K. Beyer and T. Lutes.
New Radiation Safety Interlock System for the SPring-8 Accelerator Complex C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S. Hashimoto 1), Y. Hashimoto,
In the user guide section as shown below, please add all four manuals attached with this … Remove the earlier Sonic and Ideos X3 software guides.
AC-SSC-1 Installation and operation manual
737 PNEUMATICS MENU PRINCIPAL.
ICRA Panel System Installation Instructions
Inventor Or How to build things.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
Marshall x10” Combo: Front View Logo Mounting: -Centered and 1-7/8” up from piping (not sure if this is factory placement or not) 14.5” Rubber feet:
Search Teams Training [school’s name here]. Place of the Search in the Plan The search of the school is a crucial part of our bomb threat response plan.
EET Survey of Electronics
David Saenz Far Experimental Hall - June 17, Far Experimental Hall - Hutches Scope Budget Schedule.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements ( )
Electrical Power Systems
Chapter 4: Air Leakage Control: Materials and Techniques
8/10/20151 THE BASICS OF INFRATECH HEATER CONTROLS.
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
Exploring CAD - Architectural Electrical Design. OVERVIEW TWO COMPONENTS –POWER –LIGHTS Power to House –Meter –Distribution Panel Box.
1 Telecom Cabling Patch panels, cabinets and raised floors.
 This is our group project for the assignment.  It is a large house designed to hold 50 people living in the house.  It is a 4,000 square foot house.
The Personnel Safety System (PSS) monitors the state of variables relevant to personnel safety (e.g. station door status, shutter status, water flow to.
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
Best sensitivity in the world. ( Lux F# IRE) Best sensitivity in the world. ( Lux F# IRE) 700 TV line in B/W and 600 TV line.
FAA/NASA Joint University Program for Air Transportation Research Jeff Dickman Chris Bartone June 20, 2003 A New Anechoic Chamber for Nearfield Antenna.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate.
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
FMTV COOLING SYSTEMS 4/23/2017.
EBD existing crane details and future bridge crane upgrade Alev Ibrahimov June
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
SAXS/WAXS Conversion for Beamline Engineering Review.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
1 Remove seat from vehicle and remove seat trim cover.
NSTX NSTX Center Stack Upgrade Ensure fatigue resistant Welds: minimum # of locations shown, could be more. Various Weld Reinforcements & Hardware Replacement.
Electrical Plans.
PROSSER PUMP Long Beach Fire Department. BASIC SET- UP Components Main dewatering pump Junction box Attached power cord Additional extention cord.
Beamline Readiness Review - Hutch Beamline Microdiffraction March 28, 2006.
Machinery Cooling Water System Locations and Operations.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
NEDM Collaboration Meeting 5/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Services Currently Provided  FHA/ADA Inspections  Bank Draw Requests  Existing Condition Documentation Services.
201 Mhz Cavity Installation. Removing Old 201 Cavity Came in through door with fork lift Will go out through labyrinth Requires new 3 ton Gantry crane.
1 Target Station Design Dan Wilcox February 2012.
MENU PRINCIPAL. THIS PRESENTATION INCLUDES THE SOURCES OF AIR, THE MAJOR SYSTEM COMPONENTS AND THE WAY THE CONTROLS AND INDICATORS ARE USED TO OPERATE.
STEP 1: ASSEMBLE ANGLE PLATES
Blue Access Technologies
Pointers for putting things in payload boxes
Introducing the Dakota 28483D
Annual Performance Management Cycle Management Training Tutorial
St. George Infrastructure
CBETA Technical Review
Endcap shielding senarios:
STEP 1: ASSEMBLE ANGLE PLATES
Extension SR1 WP3 Electrical installations
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
LST Module Installation
Extract from today’s talk given to DCB
Wiring the Light and Relay
Mastering Autodesk Revit MEP 2016 CHAPTER 19: Creating Equipment
My friend measured and said this beam is below where the extra studs need to be placed in the room above. That wire coming out is the wire from the outlet.
Personnel Safety Systems
Far Experimental Hall - Hutches
BUILDING FOR TODAY PLANNING FOR TOMORROW &
Presentation transcript:

Sector 13 Canted Undulator Upgrade Hutch Modification Requirements

New pneumatic door shown 41.1” Wide. This could be as narrower as allowed since it will only be used for people access. Note this is white beam door. New Wall. This is classified as white hutch front wall. Double manual white beam doors 1.3m min width. Located as close as possible to outboard wall. Shielded Beam Pipe Approximate center line of 13-ID-C1 line Wall penetration modification needed to accommodate the two guillotines, one for the shielded beam pipe the other for the 13-ID-C1 mono beam pipe Wall penetration and guillotine needed to accommodate the shielded beam pipe to 13-ID-C2 PSS box mounts here off of a false wall that allows sliding doors to pass behind Shorten existing crane for operation in C2. Add new crane for operation in C1.

Notes At least four more labyrinths should be budgeted. Utilities: Electrical: Use existing box’s and split power between C1 and C2. Pass power in and out of existing or new labyrinths. Lights may need to be moved / added. New light switches (inside and outside of hutch) are needed. PSS: A complete set of components (search buttons etc.) will be required for C1. Water: Keep only in C2. Compressed Air: Keep only in C2. Crane: Shorten existing crane in C2. Add new crane.

Phase Plan In order to minimize the impact on the existing user program on the ID line we would like the hutch modification to occur in three phases with the work to be done during three sequential shutdowns. After each phase the sector should be able to be brought back on line. Two major changes are needed to complete this project; 1) utilities modification (including PSS) and 2) hutch shielding modification. The hutch modifications will most likely require that three outboard panels be removed and replace with three new panels, two that will incorporate a sliding door and one with a triple joint providing an attachment for the new wall. To allow access to the these hutch panels both the electrical and PSS components need to be moved. Once the new panels, walls and doors are install the final PSS and electrical changes can be made. Phase One (see pages below for more details) In phase one (estimated start date 9/08) the outside and inside of the outboard walls need to be cleared of components so that during the next phase the wall panels can be modified. This involves moving the PSS box, separating conduit for AC power and PSS and moving an electrical panel. The inboard wall requires the separation of the electrical conduit shortening water and compress air to that it is only available in C2 and moving electrical outlet strips. It is important to note that after this phase beamline should operate as before therefore modifications to the PSS will only be to make room for future wall panel changes but not modify the PSS logic or function. We will be operating the IDC hutch in the same way we did prior to the shutdown. During this phase the overhead crane track will be shortened as well. Phase Two With utilities and PSS out of the way the wall panels can be removed and the door and triple junction panel install. The goal of this phase is to remove and then replace the hutch shielding during the shutdown so it is not required to install the interior wall. The new exterior door will be chained or wielded closed until the final phase is completed where the PSS is modified to operate with the new configuration. If there is not enough time to install the interior wall during this shutdown an additional phase may be needed making this a four phase plan. Phase Three With the new walls and doors installed during phase two the remaining work to be performed involves the PSS utilities, shielded beam pipe and guillotines. During this phase the new PSS configuration will be installed and tested and the final utilities installed. The SOE IDB will have both the white beam shutter and monochromatic beam shutter in place. The shielded beam pipe will be bridging IDB and IDC2 and the downstream wall of IDB and the new wall between C1 and C2 with be seal around the beam pipes with guillotines. At the end of this shutdown the old IDC hutch will be effectively operating as two independent hutches C1 and C2 completing the project. Panels needing replacement of modification

Remove PSS components and light switch from this wall. Mount on free standing frame that will allow the doors to slide behind it. Phase One Clear outside panels

Phase One Move electrical panel to next downstream panel. Separate electrical and PSS conduit routing it out a labyrinth located in the C2 hutch and back in a labyrinth in the C1 hutch. Note there is no change in the PSS logic at this time we are simply moving conduit to make room for wall removal and wall installation work for the next shut down. Clear inside panels outboard

Phase One Clear inside panels inboard Separate electrical conduit routing it out a labyrinth located in the C2 hutch and back in a labyrinth in the C1 hutch. Move to next downstream panel. Shorten water and compress air to that it is only available in C2